Shewhart’s Control Chart Philosophy
       Lean Six Sigma

Normal Distribution                                            ...
Run Chart
        Lean Six Sigma


 Shows how the process varies over time
 Shifts, trends, intermittent problems and cy...
Run Chart Procedure
           Lean Six Sigma



 Gather data over time in sequence

 Create a graph with a vertical lin...
Run Chart
            Lean Six Sigma


 Go to the Stat menu:                TASK: Create Run Chart for Cycle
            ...
Run Chart
           Lean Six Sigma




To create a run
chart in EXCEL,
highlight the
data (sorted in                     ...
Exercise:
                 Exercise: Run Chart
         Lean Six Sigma




 Using the data from Round 1 - create a Run Ch...
Two Types of Variation
          Lean Six Sigma



 Two types of variation are visible in a Control Chart:




        Sp...
Control Charts
Lean Six Sigma


  Region of Non-Random Variation   Upper
                                   Control
      ...
Control Chart
Lean Six Sigma




                             UCL= 14380




                             LCL= 3351




  ...
Control Charts
            Lean Six Sigma


Definition: A Time Series plot that shows control limits at both +3σ
         ...
Control Charts
                  Lean Six Sigma


RESULTS:


                                               I Chart of T1-...
Control Charts
            Lean Six Sigma



TASK: Remake plot with separate control limits for each team member:
 On the...
Control Charts
                Lean Six Sigma


RESULTS:

                                            I Chart of T1-Distan...
Control Charts
                      Lean Six Sigma


          Control charts are simple run charts with
                ...
Out of Control Conditions: Extreme Points
         Lean Six Sigma


    Out of control conditions are frequently detected...
Out of Control Conditions: Extreme Points
     Lean Six Sigma


4 Out of 5 Points on the same side of the average in
     ...
Out of Control Conditions: Trends & Shifts
          Lean Six Sigma



     Trend (6 Points in a Row             Process S...
Out of Control Conditions: Oscillation
              Lean Six Sigma

                                                 15 S...
Control Charts
            Lean Six Sigma



 For Variable data, three basic pairs of charts exist:
     1. I,MR: Individ...
Continuous Data Control Charts
                 Lean Six Sigma


                                  Measurement
           ...
What do you do first?
              Lean Six Sigma




Since Moving Range Chart is out of control, investigate these out o...
Attribute Control Charts
                Lean Six Sigma



                        Yes/No                  Are the Data   ...
Exercise:
              Exercise: Control Chart
         Lean Six Sigma




 What type of Control Chart should you use to...
Takeaways
       Lean Six Sigma



 When a process is “in control”
      This implies a stable, predictable amount of va...
Process Capability
        Lean Six Sigma


 Once a process is in statistical control, you want to
determine if it is Cap...
Exercise 1A
Lean Six Sigma


    Purchase Requests Processed
                 Navy        Army
                           ...
Exercise 1A
Lean Six Sigma


Purchase Requests Processed
           Navy            Army
                                 ...
Exercise 1B
Lean Six Sigma


Purchase Requests Processed
                                  What can we say
           Navy...
Exercise 1B
Lean Six Sigma


Purchase Requests Processed
           Navy            Army
                                 ...
Measures of Performance
         Lean Six Sigma



 If we know the process mean and the process sigma,
  then we can desc...
Customer Specifications
         Lean Six Sigma



• The specification limits
  represent the parameters of        LSL   T...
Sigma Level
               Lean Six Sigma


Sigma Level (or Z-value): the number of Sigma between the
 process mean and t...
A 3s Process
                      3s
       Lean Six Sigma


-6s -5s -4s -3s -2s -1s Mean 1s   2s   3s    4s     5s    6s...
A 6s Process
                      6s
       Lean Six Sigma


-6s -5s -4s -3s -2s -1s Mean 1s   2s   3s   4s     5s 6s



...
Sigma Level Example
        Lean Six Sigma



       What is the sigma level of this process?

-3 -2 -1          1 2...
Sigma Level Example
       Lean Six Sigma



-3 -2 -1          1 2 3 4 5 6 7 8 9




LSL           Mean       ...
Sigma Level Example
       Lean Six Sigma



-3 -2 -1          1 2 3 4 5 6 7 8 9




LSL           Mean       ...
Sigma Level Example
           Lean Six Sigma



-3 -2 -1            1 2 3 4 5 6 7 8 9




LSL             Mea...
Sigma Level Formula
  Lean Six Sigma



 The Sigma level of a process is the lesser of:




                       or
USL...
Measures of Performance
              Lean Six Sigma



 Recall the Army and Navy
  processing rates
                    ...
Measures of Performance
         Lean Six Sigma




           NAVY                              ARMY
Upper Sigma Level:  ...
Which would you prefer?
       Lean Six Sigma


                        -6s -5s -4s -3s -2s -1s Mean 1s       2s   3s   4s...
Different Sigma Process Levels
       Lean Six Sigma



3s Process
       -6s-5s-4s-3s-2s-1s                     1s 2s 3s ...
Importance of Reducing Variation
           Lean Six Sigma


• To increase a process sigma level, you have to decrease
  v...
Improvement-
        Improvement-Focused Scale
       Lean Six Sigma


                                 DPMO              ...
Additional Metrics of Six Sigma
         Lean Six Sigma



 In addition to Sigma Level, four other performance
  metrics ...
Defectives & Defects
         Lean Six Sigma



 A defective unit is that which fails to
  meet customer requirements or
...
Process Capability - DPU
       Lean Six Sigma




 Defects Per Unit (DPU) – the average number of
  defects, of all type...
DPU Example
        Lean Six Sigma



 In one month, 220 reports were
sampled after being sent to
customers
 Among the 2...
Process Capability – DPO, DPMO, SL
           Lean Six Sigma


 If you were checking 4 fields on
  each report, and each ...
Process Capability - RTY
                  Lean Six Sigma


   Rolled Throughput Yield                         Process A ...
Process Capability
              Lean Six Sigma
                                                                    - Exam...
Class Exercise
      Lean Six Sigma



 What measure(s) would you use to compute process
  capability for the simulation?...
Process Map or Flowchart
         Lean Six Sigma


 A Pictorial Representation of a Process
       Identifies Inputs (X)...
Why Map the Current State?
      Lean Six Sigma




 To show process simply and visually
 To clarify organization’s unde...
Process Mapping - Basic Steps
                 Lean Six Sigma


1: SIPOC
2: BOUNDARIES                              See th...
Process Map Procedure
         Lean Six Sigma



 Symbols to know:


                   Process
   Start/End             ...
Simple Process Map
         Lean Six Sigma




• Describes the high-level steps followed day in and day out




 Start    ...
Always Keep in Mind…
            Lean Six Sigma




  There are usually 3 versions of each Process Map

What you Believe i...
SIPOC
        Lean Six Sigma



SIPOC: The starting point for any process map



  S             I           P            ...
Walk the Process
     Lean Six Sigma


 Visualize yourself in the place of the product /
  information
 Walk the process...
Creating a Useful Process Map
           Lean Six Sigma



Step 1: At an actionable level, define the boundaries of the pr...
Creating a Useful Process Map
           Lean Six Sigma



Step 5: List both internal and external Xs at each process step...
Creating a Useful Process Map
             Lean Six Sigma



Step 7: Document any known operating specification for each i...
Mapping Tips
       Lean Six Sigma


 Use Post-it® notes on butcher paper.
 Place top of process boxes just below the mi...
Current State Maps
                 Lean Six Sigma

                                              Value Stream Map




   ...
Data Blocks
             Lean Six Sigma


Place a data block under each step in the process.
                             ...
Exercise
        Lean Six Sigma


 Draw a current process map based upon Round 1
  simulation.
 Annotate data blocks



...
Measure Tollgate Questions
               Lean Six Sigma


   Has an overarching Value Stream Map been completed with dat...
What We Have Covered
    Lean Six Sigma


   Data – types, collection plans
   Data measures – mean, median, standard de...
Lean Six Sigma




Define
Measure
Analyze
Improve
                     Analyze
Control




                           71  ...
Learning Objectives
     Lean Six Sigma




 Learn and apply analytical and graphical techniques for
identifying the pote...
Searching for Xs
       Lean Six Sigma




 The primary focus of the analyze phase is to separate
  the Critical Few from...
Root Cause
           Lean Six Sigma



 Why find the root cause of a defect?
      Eliminate the root cause, not the sy...
Root Cause Analysis
      Lean Six Sigma



 Cause and Effect may be separated by Time, Logical
  Flow and Location.
 A ...
Root Cause Analysis
          Lean Six Sigma


                                                     EFFECT
A single Cause ...
Tools for Root Cause
       Lean Six Sigma


 Process:
     Five Whys
     Fishbone / Ishakawa / Cause and Effect Diagr...
5 Whys
       Lean Six Sigma



 Technique to get from symptom to root cause

 Asking “Why?” as many as five times to ge...
Root Cause Analysis – 5 Why’s
    Lean Six Sigma


            Why?

                             Why?
 Root
Cause
       ...
Root Cause
           Lean Six Sigma


Granite on the Jefferson Memorial is deteriorating.
       Why?
 Use of harsh chemi...
5 Whys: Late UFRs
             Lean Six Sigma


                                           Late BRC
                      ...
Fishbone Diagram Procedure
          Lean Six Sigma



 Write the problem (effect or “Y”) in a box on the right side with...
Cause and Effect Diagram
            Lean Six Sigma


                Look for causes
                                    ...
Fishbone Diagrams
       Lean Six Sigma


Pick one main cause and ask “Why did cause A
occur?”
 Results in causes A1, A2,...
Fishbone Diagrams
          Lean Six Sigma



 Pick one cause and ask “Why?” 5 times.
  End result is a probable cause


...
Identify Root Causes
            Lean Six Sigma


                                       Main Cause I
                    ...
Exercise – Root Cause Analysis
     Lean Six Sigma




 Using the simulation, determine what the effect of
  interest is ...
XY Matrix
         Lean Six Sigma



 XY matrix is used to:

      Identify and subjectively rank "sub-Ys"

      Relat...
Why Do We Need an XY Matrix?
      Lean Six Sigma


To allow everyone involved with a process to agree on
 outputs critic...
How to Create a Useful XY Matrix
       Lean Six Sigma



Step 1: Use available information sources like process
maps and ...
How to Create a Useful XY Matrix
        Lean Six Sigma



Step 4: Identify all potential inputs or causes (Xs) that can
i...
BRC Process Map
               Lean Six Sigma

                                                 Step 1 Use available
     ...
XY Matrix
                Lean Six Sigma

Step 2 List the important
                                                      ...
In-
                   In-Class Exercise
         Lean Six Sigma



 Break into your groups
 Use your Simulation Round 1...
FMEA Defined
          Lean Six Sigma


 Failure Modes and Effects Analysis (FMEA) is a detailed document
  that identifi...
When to Conduct a FMEA
      Lean Six Sigma


 Early in the process design or improvement development.
 When new systems...
Types of FMEA
      Lean Six Sigma


 System - Analyzes systems and subsystems in early
  concept and design stages

 De...
FMEA Form
                          Lean Six Sigma


Process or
                                                          ...
Sample FMEA Rating Scale
               Lean Six Sigma


                                             LIKELIHOOD OF
RATING...
Sample FMEA Rating Scale – Cont
                 Lean Six Sigma


RATING        DEGREE OF SEVERITY            LIKELIHOOD O...
Example: Budget Review FMEA
                Lean Six Sigma


Process or    Budget Review                                  ...
Exercise - FMEA
        Lean Six Sigma




 Create a FMEA for one process step of the Simulation




                    ...
Graphical Tools
         Lean Six Sigma



 The primary graphical tools available to help
  characterize and learn about ...
Pareto Chart
         Lean Six Sigma



 The Pareto Chart is a bar chart that displays the relative
  frequency of factor...
Pareto Chart
            Lean Six Sigma




LQA – Living Quarters Allowance                   PD - Per Diem
TQSA – Tempora...
Pareto Charts
          Lean Six Sigma



TASK: Create a Pareto Chart using the Defect and Frequency data
 Go to Stat men...
Pareto Charts
       Lean Six Sigma


RESULTS:
                                    To create a Pareto Chart
              ...
Correlation
       Lean Six Sigma


                                   (Response)   (Factor)
 Identify dependency
  relat...
Scatter Diagram
         Lean Six Sigma



 Good for finding and/or confirming relationships between
  measures
    Will...
Scatter Diagram
                   Lean Six Sigma




                    Scatter Diagram for Cycle Time vs Number of Inv....
Scatter Diagrams Patterns
                              Lean Six Sigma


       (Dependent Variable)   X and Y appear to b...
Examples of Variable Relationships
            Lean Six Sigma


55            No Relationship                             ...
Abuse & Misuse of Correlation
        Lean Six Sigma



 If we establish a correlation between X1 and Y, that does NOT
  ...
Scatter Plots
            Lean Six Sigma


Definition: Shows relationships between numerical variables
           (NOT non...
Scatter Plots
              Lean Six Sigma


TASK: Create a graph showing the relationship between the Distance and the Va...
Scatter Plots
           (Cont...) Six Sigma
             Lean


 Select Overlaid on the same                            ...
Scatter Plots
                      Lean Six Sigma


    To create the Scatter Plot in EXCEL, highlight the X then Y
    ...
Boxplot Distribution
          Lean Six Sigma




                                     Maximum Length



Interquartile Ran...
Boxplots
           Lean Six Sigma


Definition: Box plots summarize data in percentages (%) using the
            Median ...
Boxplots
       Lean Six Sigma


TASK: Make Box Plots of T1-Distance, T2-Distance, T3-Distance,
  T4-Distance, and T5-Dist...
Boxplots
       Lean Six Sigma


RESULTS:

                                   EXCEL does not have a
                      ...
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
OSDGB2
Upcoming SlideShare
Loading in...5
×

OSDGB2

5,861

Published on

OSDGB2

Published in: Business, Technology
0 Comments
4 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
5,861
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
495
Comments
0
Likes
4
Embeds 0
No embeds

No notes for slide

OSDGB2

  1. 1. Shewhart’s Control Chart Philosophy Lean Six Sigma Normal Distribution Run Chart 104 103 102 101 100 99 98 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Control Chart _ 105 104 X + 3s 103 102 _ Mean = X 101 100 99 _ 98 97 X - 3s 96 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 UNCLASSIFIED
  2. 2. Run Chart Lean Six Sigma  Shows how the process varies over time  Shifts, trends, intermittent problems and cyclic patterns can be detected  Vertical-axis is the unit of measure; horizontal-axis is time  A baseline average or current average line can be used as a point-of-reference to detect process changes  When the Run Chart p-values are greater than alpha (e.g. .05), the characteristic of interest is not statistically significant. 2 UNCLASSIFIED
  3. 3. Run Chart Procedure Lean Six Sigma  Gather data over time in sequence  Create a graph with a vertical line and a horizontal line  The vertical line should cover the full range of measurements  The horizontal line should cover the time period which the data was collected  Add a baseline (using prior data) or average (current data) line to indicate process location (mean)  Plot the data on the graph connecting the points  Interpret the chart  Look for trends, patterns and/or unusual data points 3 UNCLASSIFIED
  4. 4. Run Chart Lean Six Sigma  Go to the Stat menu: TASK: Create Run Chart for Cycle Time  Go to Quality Tools Select Cycle Time as Single column box  Select Run Chart Set Subgroup Size to 1 Click OK Alternate to Time Series Plots 4 UNCLASSIFIED
  5. 5. Run Chart Lean Six Sigma To create a run chart in EXCEL, highlight the data (sorted in P-Values less time order than the α-level sequence) then (.05) indicate select INSERT, statistical Line Chart, 2 significance. lines 5 UNCLASSIFIED
  6. 6. Exercise: Exercise: Run Chart Lean Six Sigma  Using the data from Round 1 - create a Run Chart of your simulation data cycle time  Results? 10 minutes 6 UNCLASSIFIED
  7. 7. Two Types of Variation Lean Six Sigma  Two types of variation are visible in a Control Chart: Special Cause Common Cause Something different happening Always present to some at a certain time and place degree in the process 7 UNCLASSIFIED
  8. 8. Control Charts Lean Six Sigma Region of Non-Random Variation Upper Control Limit Process Average Lower Control Region of Non-Random Variation Limit Data Over Time 8 UNCLASSIFIED
  9. 9. Control Chart Lean Six Sigma UCL= 14380 LCL= 3351 UCL= 6775 LCL= 0 9 UNCLASSIFIED
  10. 10. Control Charts Lean Six Sigma Definition: A Time Series plot that shows control limits at both +3σ and -3σ from the mean  Go back to the catapult data worksheet  Go to Stat menu > Control Charts > Variables Charts for Individuals > Individuals  Click inside the Variables dialog box > select T1-Distance 10 UNCLASSIFIED
  11. 11. Control Charts Lean Six Sigma RESULTS: I Chart of T1-Distance 170 UCL=167.20 160 150 Individual Value 140 _ X=133.75 130 120 110 100 LCL=100.30 1 3 5 7 9 11 13 15 17 19 Observation 11 UNCLASSIFIED
  12. 12. Control Charts Lean Six Sigma TASK: Remake plot with separate control limits for each team member:  On the toolbar click the icon “Bring up last dialog box” (#9) or use “Control-E”  Click on I Chart Options > Go to Stages tab  Click on the Define Stages box > select Team Member  Click OK twice 12 UNCLASSIFIED
  13. 13. Control Charts Lean Six Sigma RESULTS: I Chart of T1-Distance by Team Member 1 2 3 4 200 UCL=189.6 180 Individual Value 160 _ 140 X=140.4 120 100 LCL=91.2 1 3 5 7 9 11 13 15 17 19 Observation 13 UNCLASSIFIED
  14. 14. Control Charts Lean Six Sigma Control charts are simple run charts with Zone A 105 statistically generated limits! UCL 104 Zone B 103 Zone C 102 101 Center Line 100 Zone C 99 Zone B LCL 98 97 Zone A 96 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 14 UNCLASSIFIED
  15. 15. Out of Control Conditions: Extreme Points Lean Six Sigma  Out of control conditions are frequently detected by the extreme point condition 2 Out of 3 Points on same side Extreme Point (1 Point Beyond UCL of average in Zone A or Beyond or LCL) UCL UCL A B C CL X C B A LCL LCL Note that the out of control point is always circled 15 UNCLASSIFIED
  16. 16. Out of Control Conditions: Extreme Points Lean Six Sigma 4 Out of 5 Points on the same side of the average in Zone B or Beyond UCL A B C X C B A LCL 16 UNCLASSIFIED
  17. 17. Out of Control Conditions: Trends & Shifts Lean Six Sigma Trend (6 Points in a Row Process Shift (9 Points in a Steadily Increasing or Row on one side of the Decreasing) average) UCL UCL CL CL LCL LCL 17 UNCLASSIFIED
  18. 18. Out of Control Conditions: Oscillation Lean Six Sigma 15 Successive Points Alternating Oscillation Up and Down in Zone C (above (14 Successive Points and below the average) Alternating Up and Down) UCL UCL A B C CL X C B A LCL LCL Possible Cause(s): Overcontrol of the process, e.g., adjusting the machine after almost every piece. Two different processes occurring simultaneously, two different machines, two different operators, etc. 18 UNCLASSIFIED
  19. 19. Control Charts Lean Six Sigma  For Variable data, three basic pairs of charts exist: 1. I,MR: Individual and Moving Range 2. Xbar,R: Average and Range 3. Xbar,S: Average and Standard Deviation If the Range/Moving Range chart is in control, you can then use the Xbar chart.  For Attributes data, four basic charts exist: 1. nP: Number chart Control Charts can be 2. P: Proportions chart produced in EXCEL using 3. C: Count chart Control Chart templates posted to DEPMS. 4. U: Rate 19 UNCLASSIFIED
  20. 20. Continuous Data Control Charts Lean Six Sigma Measurement (Continuous/Variable Data) Subgroup Size of 1 Subgroup Size 3-9 Subgroup Size > 9 I-MR Xbar-R Xbar-S •Process with few data points •Monitors repetitive Similar to Xbar-R Chart •Sampling is very expensive processes Larger sample sizes •Sampling is by destructive testing •Practictioners frequently •Building data to begin another choose subgroups of 5 chart type Stat > Control Charts > Variable Stat > Control Charts > Variable Charts for Subgroups Charts for Individuals > I-MR, Xbar-R, Enter variable Xbar-S , Enter variable Enter variable and subgroup size and subgroup size 20 UNCLASSIFIED
  21. 21. What do you do first? Lean Six Sigma Since Moving Range Chart is out of control, investigate these out of control points first to determine cause. 21 UNCLASSIFIED
  22. 22. Attribute Control Charts Lean Six Sigma Yes/No Are the Data Count Yes/No or count? Is the area Is sample of opportunity size constant? constant from sample to sample? yes no yes no Choose Choose np chart or p chart p chart Choose c chart or u chart Choose 5  n p  50 5  n p  50 u chart 5  c  50 and and or 5  n u  50 5  n u  50 5  n ( 1  p )  50 5  n ( 1  p )  50 MINITAB: Stat > Control Charts > Attribute Charts > Select Type of Chart Enter variable of interest and subgroup size, Click OK 22 UNCLASSIFIED
  23. 23. Exercise: Exercise: Control Chart Lean Six Sigma  What type of Control Chart should you use to assess the Round 1 simulation ?  Using the data from Round 1 - create a Control Chart of your simulation data cycle time  Results? 10 minutes 23 UNCLASSIFIED
  24. 24. Takeaways Lean Six Sigma  When a process is “in control”  This implies a stable, predictable amount of variation (common cause variation)  This does not mean a “good” or desirable amount of variation  When a process is “out-of-control”  This implies an unstable, unpredictable amount of variation  It is subject to both common AND special causes of variation  A process can be in statistical control and not capable of consistently producing good output within specification limit. 24 UNCLASSIFIED
  25. 25. Process Capability Lean Six Sigma  Once a process is in statistical control, you want to determine if it is Capable -- Is it meeting specification limits and producing “good” or satisfactory services or deliverables?  You can determine capability by computing the # of Defects per Unit, Defects Per Opportunity and Defects Per Million Opportunities, and Rolled Throughput Yield.  You can also determine capability by comparing the width of the Process Variation (Voice of the Process) with the width of the specification limits (Voice of the Customer).  Measure the # of standard deviations that fit between the Process mean and the closest specification limit to derive the sigma level. 25 UNCLASSIFIED
  26. 26. Exercise 1A Lean Six Sigma Purchase Requests Processed Navy Army What can we Mon 89 91 say about the Tue 70 102 performance Wed 100 103 of these two Services with Thur 121 105 respect to their Fri 120 99 means? X 26 UNCLASSIFIED
  27. 27. Exercise 1A Lean Six Sigma Purchase Requests Processed Navy Army The Services Mon 89 91 are equal in Tue 70 102 performance, but is there Wed 100 103 more to the Thur 121 105 story? Fri 120 99 X 100 100 27 UNCLASSIFIED
  28. 28. Exercise 1B Lean Six Sigma Purchase Requests Processed What can we say Navy Army about the Mon 89 91 performance variation Tue 70 102 of these two Wed 100 103 Services? Thur 121 105 Fri 120 99  28 UNCLASSIFIED
  29. 29. Exercise 1B Lean Six Sigma Purchase Requests Processed Navy Army Navy is much more Mon 89 91 varied. What are Tue 70 102 the implications? Wed 100 103 Thur 121 105 Fri 120 99  21.6 5.5 29 UNCLASSIFIED
  30. 30. Measures of Performance Lean Six Sigma  If we know the process mean and the process sigma, then we can describe the performance of the process.  But:  How do we know if the process performance is good or bad?  Who should determine if performance is good enough? ? 30 UNCLASSIFIED
  31. 31. Customer Specifications Lean Six Sigma • The specification limits represent the parameters of LSL Target USL performance desired by the customer. • The Upper Spec Limit (USL) & Lower Spec Limit (LSL) represent the level of tolerance around this desired target. • Together, they represent what the customer wants! Not what the process does. 31 UNCLASSIFIED
  32. 32. Sigma Level Lean Six Sigma Sigma Level (or Z-value): the number of Sigma between the process mean and the nearest specification limit  If we know:  The Mean of the process +  The s of the process +  The Specifications set by Mean Target the customer -3 -2 -1 1 2 3 4 5  Then:  We can determine the Sigma Level of the process 32 UNCLASSIFIED
  33. 33. A 3s Process 3s Lean Six Sigma -6s -5s -4s -3s -2s -1s Mean 1s 2s 3s 4s 5s 6s LSL Mean USL 33 UNCLASSIFIED
  34. 34. A 6s Process 6s Lean Six Sigma -6s -5s -4s -3s -2s -1s Mean 1s 2s 3s 4s 5s 6s LSL Mean USL 34 UNCLASSIFIED
  35. 35. Sigma Level Example Lean Six Sigma  What is the sigma level of this process? -3 -2 -1 1 2 3 4 5 6 7 8 9 LSL Mean USL 35 UNCLASSIFIED
  36. 36. Sigma Level Example Lean Six Sigma -3 -2 -1 1 2 3 4 5 6 7 8 9 LSL Mean USL USL - Mean = 9 36 UNCLASSIFIED
  37. 37. Sigma Level Example Lean Six Sigma -3 -2 -1 1 2 3 4 5 6 7 8 9 LSL Mean USL Mean - LSL = 3 37 UNCLASSIFIED
  38. 38. Sigma Level Example Lean Six Sigma -3 -2 -1 1 2 3 4 5 6 7 8 9 LSL Mean USL • The “Process Sigma” is: • The lesser of (USL-Mean) & (Mean-LSL) stated in units of s 38 UNCLASSIFIED
  39. 39. Sigma Level Formula Lean Six Sigma  The Sigma level of a process is the lesser of: or USL  X X  LSL   39 UNCLASSIFIED
  40. 40. Measures of Performance Lean Six Sigma  Recall the Army and Navy processing rates Purchase Requests Processed Navy Army  Assume: Mon 89 91 o LSL = 70 documents per day  to keep up with incoming rate Tue 70 102 o USL = 130 documents per day Wed 100 103  To keep from “overfeeding” the processor which would result in Thur 121 105 a higher error rate Fri 120 99  What are the sigma levels for  21.6 5.5 each of these?  What are the implications? 40 UNCLASSIFIED
  41. 41. Measures of Performance Lean Six Sigma NAVY ARMY Upper Sigma Level: Upper Sigma Level: USL  X 130  100 USL  X 130  100   1.4   5 .5  21.6  5.5 Lower Sigma Level: Lower Sigma Level: X  LSL 100  70 X  LSL 100  70   1 .4   5.5  21.6  5.5 Sigma Level: 1.4 Sigma Level: 5.5 41 UNCLASSIFIED
  42. 42. Which would you prefer? Lean Six Sigma -6s -5s -4s -3s -2s -1s Mean 1s 2s 3s 4s 5s 6s NAVY The target is missed more than 15% of the time LSL Mean USL -6s -5s -4s -3s -2s -1s Mean 1s 2s 3s 4s 5s 6s ARMY The target is usually never missed? 42 LSL Mean USL UNCLASSIFIED
  43. 43. Different Sigma Process Levels Lean Six Sigma 3s Process -6s-5s-4s-3s-2s-1s 1s 2s 3s 4s 5s 6s LSL Mean USL 6s Process -6s-5s-4s-3s-2s-1s 1s 2s 3s 4s 5s 6s LSL Mean USL 43 UNCLASSIFIED
  44. 44. Importance of Reducing Variation Lean Six Sigma • To increase a process sigma level, you have to decrease variation. Too early Too late Too early Too late Defects Defects Reduce variation Delivery Time Delivery Time Spread of variation Spread of variation too wide compared narrow compared to to specifications specifications • Less variation provides:  Greater reliability in the process  Less waste and rework, which lowers costs  Products and services that perform better and last longer  Happier customers 44 UNCLASSIFIED
  45. 45. Improvement- Improvement-Focused Scale Lean Six Sigma DPMO s Increase in Sigma 308,537 2 requires exponential 66,807 3 defect reduction 6,210 4 233 5 3.4 6 Defects per Process Million Capability Opportunities “trim the fat” (distribution shifted ±1.5s) 45 UNCLASSIFIED
  46. 46. Additional Metrics of Six Sigma Lean Six Sigma  In addition to Sigma Level, four other performance metrics are of interest:  Defects Per Unit (DPU)  Process Capability  Defects Per Million Opportunities (DPMO)  Rolled Throughput Yield  If you know one… you can determine the others Suduko 46 UNCLASSIFIED
  47. 47. Defectives & Defects Lean Six Sigma  A defective unit is that which fails to meet customer requirements or standards  Late order, incorrect invoice, short-count, etc.  A defect is any reason for such a failure  Not filed correctly, incorrect line item, transposed numbers, etc.  A defective unit can have more than one defect 47 UNCLASSIFIED
  48. 48. Process Capability - DPU Lean Six Sigma  Defects Per Unit (DPU) – the average number of defects, of all types, over the total number of units produced  Unit is the item being processed o (order, invoice, form, plate, etc.) DPU = Total Number Defects Total Number Units Processed 48 UNCLASSIFIED
  49. 49. DPU Example Lean Six Sigma  In one month, 220 reports were sampled after being sent to customers  Among the 220 reports, 344 line items were found incorrect (defects) Unit = Report DPU = 344 incorrect line items / 220 Reports = 1.56 49 UNCLASSIFIED
  50. 50. Process Capability – DPO, DPMO, SL Lean Six Sigma  If you were checking 4 fields on each report, and each field DPO =Total Number Defects represented an opportunity for a Total Number Opportunities for Defect defect, then the Defects Per Opportunity (DPO) would be 344 / (220 * 4) = 344/880= .39  Convert DPO to Defects per Million Opportunities by DPMO = DPO * 1,000,000 multiplying DPO by a million. DPMO = 390,000  Convert DPMO to Sigma Level SL = NORMSINV(1-(DPMO/1000000))+1.5 (SL) using chart or formula or Sigma Level = 1.78 SL= NORMSINV(1 – DPO)+1.5 50 UNCLASSIFIED
  51. 51. Process Capability - RTY Lean Six Sigma  Rolled Throughput Yield Process A has 4 steps: (RTY) is the probability that  Step 1, 100 units enter, 10 are a single unit can pass scrapped and 5 are reworked to get through a series of process 90. Yield = (100- (10+5)) / 100 = .85 steps free of defects.  Step 2, 90 units in from Step 1, 10 scrapped and 7 are reworked to get 5 rework 80. (90-(10+7))/90 = .81 100 Step 1  Step 3, 80 units in from Step 2, 5 7 rework scrapped and 3 reworked to get 75. 90 Step 2 (80-(5+3))/80 = .9 3 rework  Step 4, 75 units in, 5 scrapped and 80 Step 3 10 rework 10 reworked to get 70. (75-(5+10)/75 10 10 = .8 5 75 Step 4  RTY = .85 * .81 * .9 * .8 = .49572 5 SCRAP 70 = 50% yield 51 UNCLASSIFIED
  52. 52. Process Capability Lean Six Sigma - Example - Process Capability of Delivery Time P otential (Within) C apability  266 data points Cp 1.16 LSL Target USL collected between 11/1/04 C PL 2.22 C PU 0.10 thru 11/30/04 Within C pk 0.10 Ov erall  Mean 29 days, St. Dev. C C pk 1.16 2.9 days, CP is 1.16 O v erall C apability indicating process needs Pp 1.24 PPL 2.37 centering to the LSL of 10 PPU 0.11 and USL of 30 days. Cpk P pk 0.11 is .1 indicating that the C pm 0.35 process is exceeding the P rocess Data LS L 10 USL. Target 20  With an overall PPM of USL 30 S ample M ean 29.1203 371,895 defects per S ample N 266 million opportunity, the S tDev (Within) 2.87033 current process has a S tDev (O v erall) 2.69154 Sigma Quality Level of 1.8 12 16 20 24 28 32 36 or a 62% yield O bserv ed P erformance E xp. Within P erformance E xp. O v erall P erformance P P M < LS L 0.00 PPM < LS L 0.00 P P M < LS L 0.00 P P M > U S L 281954.89 PPM > U S L 379619.67 P P M > U S L 371895.18 P P M Total 281954.89 PPM Total 379619.67 P P M Total 371895.18 52 Required Deliverable UNCLASSIFIED
  53. 53. Class Exercise Lean Six Sigma  What measure(s) would you use to compute process capability for the simulation?  How capable is Round 1 Simulation? 10 minutes 53 UNCLASSIFIED
  54. 54. Process Map or Flowchart Lean Six Sigma  A Pictorial Representation of a Process  Identifies Inputs (X) and Outputs (Y)  Identifies Current Data Collection Points  Categorizes Inputs (X)  Defines Process Boundaries  Identifies customers and suppliers  Points out discrepancies in the process  Points out inefficiencies in the process  Determines Value-Added and Non-Value-Added Steps  Initiates standardization of procedures 54 UNCLASSIFIED
  55. 55. Why Map the Current State? Lean Six Sigma  To show process simply and visually  To clarify organization’s understanding of how the current process actually operates  To create baseline for future improvements to be made and measured A current state map is a pictorial view showing how material and information currently flow. 55 UNCLASSIFIED
  56. 56. Process Mapping - Basic Steps Lean Six Sigma 1: SIPOC 2: BOUNDARIES See the 3: VOICE OF THE CUSTOMER Process … 4: GATHER APPROPIATE INFORMATION 5: WALK THE PROCESS See the 6: CREATE CURRENT STATE MAP Waste … 7: SPAGHETTI MAP / CIRCLE DIAGRAM 8: VALUE ANALYSIS Visualize the Perfect 9: CREATE IDEAL STATE MAP State … 10: DEVELOP FUTURE STATE MAP Lead the Way 11: DEVELOP ACTION PLAN toward it … 12: IMPLEMENT THE PLAN Photo source: Raytheon 56 UNCLASSIFIED
  57. 57. Process Map Procedure Lean Six Sigma  Symbols to know: Process Start/End Decision Flow Step  Determine the start and finish of the process you are charting  Define how the process actually works, step by step, in detail  Use observation, recorders, etc.  Add inputs and outputs 57 UNCLASSIFIED
  58. 58. Simple Process Map Lean Six Sigma • Describes the high-level steps followed day in and day out Start Step 1 Decision Step 2 Yes No End 58 UNCLASSIFIED
  59. 59. Always Keep in Mind… Lean Six Sigma There are usually 3 versions of each Process Map What you Believe it is... What it Actually is... What you Want it to be... 59 UNCLASSIFIED
  60. 60. SIPOC Lean Six Sigma SIPOC: The starting point for any process map S I P O C Suppliers Inputs Process Outputs Customers Process Map 60 UNCLASSIFIED
  61. 61. Walk the Process Lean Six Sigma  Visualize yourself in the place of the product / information  Walk the process backwards (from last step to first) OR forwards (from first step to last)  Interview personnel who touch the process (look for problems that may be occurring)  Measure people and/or product travel distances  Look for constraints in the system (shared resources)  Look for 8 types of wastes 61 UNCLASSIFIED
  62. 62. Creating a Useful Process Map Lean Six Sigma Step 1: At an actionable level, define the boundaries of the process you need to improve Step 2: Identify all operations needed in the production of a product or service. At each step include:  Cycle time  Quality levels Step 3: Identify each operation above as value-added or non-value- added. A value-added operation “transforms the product in a way meaningful to the customer” Step 4: List both internal and external Ys at each process step (continued) 62 UNCLASSIFIED
  63. 63. Creating a Useful Process Map Lean Six Sigma Step 5: List both internal and external Xs at each process step Step 6: Classify all Xs as one or more of the following:  Controllable (C): Inputs you can adjust or control while the process is running o Examples: Speed, feed rate, temperature, pressure  Standard Operating Procedures (SOPs): Common sense things you always do because they make sense o Just because it is in a procedure --does not mean it is an SOP o Procedures can be used to specify set-points of controllable parameters o Examples: Cleaning, safety, loading components, setup  Noise (N): Things you cannot control or do not want to control (too expensive or too difficult) o Examples: Ambient temperature, humidity, operator (continued) 63 UNCLASSIFIED
  64. 64. Creating a Useful Process Map Lean Six Sigma Step 7: Document any known operating specification for each input and output  What are the operational requirements of the process?  Examples: Obligation Rate 8% per month EOD (End of Day) +/- 1 day Recon Imagery Resolution +/- 1 meter Step 8: Clearly identify all process data collection points  What are the DPUs of the various process steps?  What is the Rolled Throughput Yield (RTY) of the Process? RTY = FPY Step 1 x FPY Step 2 x FPY Step 3 …. x FPY Step n 64 UNCLASSIFIED
  65. 65. Mapping Tips Lean Six Sigma  Use Post-it® notes on butcher paper.  Place top of process boxes just below the middle of the page.  Leave enough room between process boxes to show inventory.  Decide whether to count all parts or just a sample part – make the assumptions up front.  Draw only one to three main suppliers/supplied items.  Title and date map. 65 UNCLASSIFIED
  66. 66. Current State Maps Lean Six Sigma Value Stream Map Circle Diagram Spaghetti Diagram Main Material Tech W/C 51A/B CRANE ISEA Technician 51E SUPPLY Paint PAINT C.O. Booth BOOTH N OFFICE DAAS D TOOL I NDI NDI ROOM Office Strip DEPT Tank SNAP AWP/RMS HEAD STRIP ROOM STOCK SK POINT SAFETY BO1 DOCKSIDE 520 PEO SUPV P.C.PC PC IWS2 51D 66 UNCLASSIFIED
  67. 67. Data Blocks Lean Six Sigma Place a data block under each step in the process. step number: Process Description: Demand: How many items the customer wants per ___ Trigger: What tells you to begin this step? Done: What tells you the step is finished? Flow Time Entire time it takes to complete step? (8 hours @ day & FLOW TIME) Touch TIme: Meets all three Criteria for VA People: Number of people required to complete the step? Shifts: How many places this step is performed No. Defects: Number of defects per unit time (% defective may also be accepted) WIP: How many items have been started but not completed WIQ: How many items waiting to start Use standard method for all data blocks. This could be Personnel Distance Traveled: Product travel. or Changeover: Time between last step of current job to first step of next job Flow Stoppers: Problems that keep you from doing your job 67 UNCLASSIFIED
  68. 68. Exercise Lean Six Sigma  Draw a current process map based upon Round 1 simulation.  Annotate data blocks 18 minutes 68 UNCLASSIFIED
  69. 69. Measure Tollgate Questions Lean Six Sigma  Has an overarching Value Stream Map been completed with data to better understand the process and problem, and show where root causes might reside?  Has the team conducted a value-added and cycle time analysis, identifying areas where time and resources are devoted to tasks not critical to the customer?  Has the team identified specific input, process and output measures needing to be collected for both effectiveness and efficiency categories?  Has the team developed clear, unambiguous operational definitions for each measurement and tested them with others to ensure clarity and consistency?  Has a clear, reasonable choice been made between gathering new data or taking advantage of existing data already collected by the organization?  Has an appropriate sample size and sampling frequency been established to ensure valid representation of the process we are measuring?  Has the measurement system been checked for repeatability and reproducibility, potentially including training data collectors?  Has the team developed and tested data collection forms or check sheets?  Has baseline performance and process capability been established? How large is the gap between current performance and customer requirements? 69 UNCLASSIFIED
  70. 70. What We Have Covered Lean Six Sigma  Data – types, collection plans  Data measures – mean, median, standard deviation  Minitab familiarization  Sampling – reasons, types, computing sample size  Measurement System Analysis - purpose, components  Normality of data  Run Charts  Control Charts  Process Capability  Process Mapping 70 UNCLASSIFIED
  71. 71. Lean Six Sigma Define Measure Analyze Improve Analyze Control 71 UNCLASSIFIED
  72. 72. Learning Objectives Lean Six Sigma  Learn and apply analytical and graphical techniques for identifying the potential root causes of a problem 72 UNCLASSIFIED
  73. 73. Searching for Xs Lean Six Sigma  The primary focus of the analyze phase is to separate the Critical Few from the Trivial Many  In short: What is driving our deficiency or variation? All Possible Xs Probable Xs 73 UNCLASSIFIED
  74. 74. Root Cause Lean Six Sigma  Why find the root cause of a defect?  Eliminate the root cause, not the symptom  Problem doesn't show up again  Corrective action must:  Ensure that the error is physically prevented from occurring again  Prevents a defect loop 74 UNCLASSIFIED
  75. 75. Root Cause Analysis Lean Six Sigma  Cause and Effect may be separated by Time, Logical Flow and Location.  A Cause/Effect relationship is one-way.  The Effect is not the Cause! Cause Effect Time - Logical Flow - Location 75 UNCLASSIFIED
  76. 76. Root Cause Analysis Lean Six Sigma EFFECT A single Cause can have multiple Effects. CAUSE EFFECT EFFECT CAUSE CAUSE EFFECT A single Effect can have multiple Causes. CAUSE 76 UNCLASSIFIED
  77. 77. Tools for Root Cause Lean Six Sigma  Process:  Five Whys  Fishbone / Ishakawa / Cause and Effect Diagram  XY Matrix  Failure Modes and Effects Analysis (FMEA)  Graphical:  Pareto Charts  Scatter Diagram  Box Plots 77 UNCLASSIFIED
  78. 78. 5 Whys Lean Six Sigma  Technique to get from symptom to root cause  Asking “Why?” as many as five times to get to root cause  By identifying root cause we can take action to prevent recurrence 78 UNCLASSIFIED
  79. 79. Root Cause Analysis – 5 Why’s Lean Six Sigma Why? Why? Root Cause Why? EFFECT CAUSE Why? EFFECT CAUSE Why? EFFECT CAUSE EFFECT CAUSE EFFECT CAUSE 79 UNCLASSIFIED
  80. 80. Root Cause Lean Six Sigma Granite on the Jefferson Memorial is deteriorating. Why? Use of harsh chemicals Why? To clean pigeon droppings Why? Lots of spiders at monument Why? Lots of gnats to eat Why? Gnats are attracted to the light at dusk Solution: Turn on the lights at a iSixSigma.com later time. 80 UNCLASSIFIED
  81. 81. 5 Whys: Late UFRs Lean Six Sigma Late BRC Charts WHY? Incomplete Late UFRs Software UFRs problem WHY? WHY? Handling Written with Did Not Damage Bug Did Not Late Receipt Follow Read from Field Directions Directions WHY? WHY? WHY? WHY? Untested Not Written Typo Operational Ambitious program Clearly WHY? Mission Schedule No Format WHY? Packaging Error No One Assigned to WHY? Develop 81 UNCLASSIFIED
  82. 82. Fishbone Diagram Procedure Lean Six Sigma  Write the problem (effect or “Y”) in a box on the right side with an arrow entering from the left  Generate a list of causes that potentially create the problem  Organize the causes into categories  Place causes on the fishbone by category  Breakdown the causes into smaller components by asking “Why?”  Add to fishbone  Examine for patterns, root causes, data needs 82 UNCLASSIFIED
  83. 83. Cause and Effect Diagram Lean Six Sigma Look for causes Repeat for Each Main Cause that appear Suggested Causes: repeatedly across major cause Man categories. Main Cause I Method Machine Main Cause II Material Measurement Mother Nature B C Problem A A Main Cause III Main Cause V Main Cause IV 83 UNCLASSIFIED
  84. 84. Fishbone Diagrams Lean Six Sigma Pick one main cause and ask “Why did cause A occur?”  Results in causes A1, A2, A3, etc. Work one Main Cause I category at a time… please! Why did cause “A” occur? A A1 Problem A2 A3 84 UNCLASSIFIED
  85. 85. Fishbone Diagrams Lean Six Sigma Pick one cause and ask “Why?” 5 times.  End result is a probable cause Main Cause I Ask “Why?” 5 times? Why A? A Why A2A1? A2A1A A2A Probable Problem A2 A2A1A1 Cause Why A2A? A2A1 Why A2A1A? Repeat Cycle of Questions for Each Main Cause 85 UNCLASSIFIED
  86. 86. Identify Root Causes Lean Six Sigma Main Cause I Main Cause II If one probable cause repeats… Root Cause C B Problem A A Main Cause V Main Cause IV Main Cause III Root Cause 86 UNCLASSIFIED
  87. 87. Exercise – Root Cause Analysis Lean Six Sigma  Using the simulation, determine what the effect of interest is then brainstorm causes using the 5 Whys  Create Cause and Effect Diagram that concentrates on reducing variation in the Simulation process 10 minutes 87 UNCLASSIFIED
  88. 88. XY Matrix Lean Six Sigma  XY matrix is used to:  Identify and subjectively rank "sub-Ys"  Relate Xs to Ys  Take the first crack at: Y = f(X) 88 UNCLASSIFIED
  89. 89. Why Do We Need an XY Matrix? Lean Six Sigma To allow everyone involved with a process to agree on outputs critical to the product and/or customer Through numerical ranking, an XY matrix enables your team to assign a level of importance to each output variable Through association, an XY matrix enables a team to numerically assess the effect of each X on each Y It provides the team its first stab at determining Y = f(X) It leads the way to an area of focus on the process “Failure Modes and Effects Analysis” (FMEA) 89 UNCLASSIFIED
  90. 90. How to Create a Useful XY Matrix Lean Six Sigma Step 1: Use available information sources like process maps and fishbones to aid you in your identification of inputs and outputs. Step 2: List the output variables (Ys) along the top section of the matrix. These are outputs that the team and/or customer deem important. These may be a subset of the list of Ys identified on the process map. Step 3: Rank each output numerically using an arbitrary scale (possibly 1 to 10). The most important output receives the highest number. Enter these rankings in the Output Ranking row of the matrix. 90 UNCLASSIFIED
  91. 91. How to Create a Useful XY Matrix Lean Six Sigma Step 4: Identify all potential inputs or causes (Xs) that can impact the various Ys and list these along the left side of the matrix. Step 5: Numerically rate the effect of each X on each Y within the body of the matrix. Step 6: Use the results page to analyze and prioritize where to focus your effort when creating the preliminary FMEA. The XY matrix is a great team brainstorming tool. It can also facilitate future team activities. 91 UNCLASSIFIED
  92. 92. BRC Process Map Lean Six Sigma Step 1 Use available N-HHQ Schedule N-HHQ Fiscal Guidance information sources like process maps and Fishbones to aid you in your identification of inputs and outputs. VA BVA C- Schedule C-Guidance NVA 92 UNCLASSIFIED
  93. 93. XY Matrix Lean Six Sigma Step 2 List the important XY Matrix output variables along the top Project: section of the matrix. Date: DEMO 1 2 3 Step 3 Rank each output View Results numerically using an Variables (Y's) Justification Delete arbitrary scale. A scale of 1 Com plete M eet Due Analysis to 10 is often used. Output Effort Date Instructions Step 4 Identify potential causes (failed Xs) that can Output Ranking 6 9 8 impact various outputs, and list Input Variables (X's) Association Table Rank % Rank each one along the left side of 1 Schedule 3 8 9 162 18.71% the matrix. 2 Training 8 7 1 119 13.74% Step 5 Numerically rate the SOP 7 7 1 113 13.05% effect of each X on each Y 3 Resource within the body of the matrix. 1 6 1 4 Guidance 68 7.85% 1 5 1 Step 6 Use the resulting ranks to 5 Fiscal Code 59 6.81% analyze and prioritize future 7 Security Class 6 1 1 53 6.12% team activities. 8 Manual Process 6 7 5 139 16.05% 93 UNCLASSIFIED
  94. 94. In- In-Class Exercise Lean Six Sigma  Break into your groups  Use your Simulation Round 1 Results  Use the 6-step methodology to create an XY matrix (XYMatrix.xls) for the process  Use the Xs and Ys from your process map as key information  Be prepared to report your results 10 minutes 94 UNCLASSIFIED
  95. 95. FMEA Defined Lean Six Sigma  Failure Modes and Effects Analysis (FMEA) is a detailed document that identifies ways a process or product can fail to meet critical customer requirements (Ys) (failure modes)  A living document that lists all possible causes (Xs) of failure  From this, list of items for the control plan can be generated  A document that allows the team to track and prioritize the actions required to improve the process  FMEA is used to reduce risk, and therefore unintended consequences, in the implementation.  In short, a FMEA will:  Ultimately capture the entire process  Identify ways the product or process failed because of these Xs  Facilitate the documentation of a plan to prevent those failures 95 UNCLASSIFIED
  96. 96. When to Conduct a FMEA Lean Six Sigma  Early in the process design or improvement development.  When new systems, products, and processes are being designed.  When existing designs or processes are being changed.  When carry-over designs are used in new applications.  After system, product, or process functions are defined, but before beginning detailed final design.  When the design concept has been decided. 96 UNCLASSIFIED
  97. 97. Types of FMEA Lean Six Sigma  System - Analyzes systems and subsystems in early concept and design stages  Design – Analyzes new process, product or service design before rollout  Process – Used to improve existing transactional and operational processes 97 UNCLASSIFIED
  98. 98. FMEA Form Lean Six Sigma Process or Prepared by: Page ____ of ____ Product Name: Responsible: FMEA Date (Orig) ______________ (Rev) _____________ ANALYZE PHASE IMPROVE PHASE Process O O Potential Failure Potential Failure D Actions D Step / S Potential Causes C Current Controls Resp. Actions Taken S C Mode Effects E Recommended E Input E C E C T T What is the In what ways does What is the impact V What causes the U What are the existing What are the What are the V U E R E R process the Key Input go on the Key Output E Key Input to go R controls and actions for completed E R C P C P step and wrong? Variables R wrong? R procedures (inspection reducing the actions taken R R T N T N Input under (Customer I E and test) that prevent occurrence of the with the I E I I investiga- Requirements)? T N either the cause or the cause, or recalculated T N O O tion? Y C Failure Mode? improving RPN? Y C N N E detection? E 0 0 0 0 98 UNCLASSIFIED
  99. 99. Sample FMEA Rating Scale Lean Six Sigma LIKELIHOOD OF RATING DEGREE OF SEVERITY OCCURRENCE ABILITY TO DETECT 1 Customer will not notice Likelihood of occurrence is Sure that the potential the adverse effect or it is remote failure will be found or insignificant prevented before reaching the next customer 2 Customer will probably Low failure rate with Almost certain that the experience slight supporting documentation potential failure will be annoyance found or prevented before reaching the next customer 3 Customer will experience Low failure rate without Low likelihood that the annoyance due to the supporting documentation potential failure will reach slight degradation of the next customer performance undetected 4 Customer dissatisfaction Occasional failures Controls may detect or due to reduced prevent the potential performance failure from reaching the next customer 5 Customer is made Relatively moderate failure Moderate likelihood that uncomfortable or their rate with supporting the potential failure will productivity is reduced by documentation reach the next customer the continued degradation of the effect 99 UNCLASSIFIED
  100. 100. Sample FMEA Rating Scale – Cont Lean Six Sigma RATING DEGREE OF SEVERITY LIKELIHOOD OF OCCURRENCE ABILITY TO DETECT 6 Warranty repair or significant Moderate failure rate without Controls are unlikely to detect or manufacturing or assembly complaint supporting documentation prevent the potential failure from reaching the next customer 7 High degree of customer Relatively high failure rate with Poor likelihood that the dissatisfaction due to component supporting documentation potential failure will be detected failure without complete loss of or prevented before reaching function. Productivity impacted by the next customer high scrap or rework levels. 8 Very high degree of dissatisfaction High failure rate without Very poor likelihood that the due to the loss of function without a supporting documentation potential failure will be detected negative impact on safety or or prevented before reaching governmental regulations the next customer 9 Customer endangered due to the Failure is almost certain based Current controls probably will adverse effect on safe system on warranty data or significant not even detect the potential performance with warning before DV testing failure failure or violation of governmental regulations 10 Customer endangered due to the Assured of failure based on Absolute certainty that the adverse effect on safe system warranty data or significant DV current controls will not detect performance without warning before testing the potential failure failure or violation of governmental regulations 100 UNCLASSIFIED
  101. 101. Example: Budget Review FMEA Lean Six Sigma Process or Budget Review Prepared by: Susan Product Name: Committee UFR Wheeler process Responsible: Susan Wheeler FMEA Date (Orig) ___1 Oct 2009______ (Rev O Process Step / Potential Failure Potential Failure D S Potential Causes C Current Controls Input Mode Effects E E C T What is the In what ways What is the impact V What causes the U What are the existing E process step does the Key on the Key Output E Key Input to go R controls and C RPN and Input Input go wrong? Variables R wrong? R procedures T under (Customer I E (inspection and test) I investiga-tion? Requirements)? T N that prevent either O Y C the cause or the N E Failure Mode? Each activity is Activity doesn’t assigned a budget 8 understand 5 ombudsman to 2 80 UFRs can't be instructions UFRs assist activity recommended incomplete for funding BRC Panels Low Activity Calendar and email convened 8 priority to submit 7 reminders; 6 336 quality UFR template for UFRs UFR not Panel reviewed by Functional Expert Members not functional 9 TDY or on leave 4 Backup SME 6 216 present expert 101 UNCLASSIFIED
  102. 102. Exercise - FMEA Lean Six Sigma  Create a FMEA for one process step of the Simulation 15 minutes 102 UNCLASSIFIED
  103. 103. Graphical Tools Lean Six Sigma  The primary graphical tools available to help characterize and learn about the process are:  Pareto Charts  Histograms and Dot Plots  Run Charts / Control Charts / Time Series Plots  Scatter Plots  Box Plots 103 UNCLASSIFIED
  104. 104. Pareto Chart Lean Six Sigma  The Pareto Chart is a bar chart that displays the relative frequency of factors or causes that contribute to the problem.  The Pareto Chart is used to:  Separate the critical few areas from the trivial many  Focus and refine the problem statement  Pareto Effect: 80% of the problem is due to 20% of the potential causes TIP: Data collected over a short time period, especially from an unstable process, can lead to incorrect conclusions. Examine the data for stratification or changes over time. Ensure that categories (X axis) are meaningful. 104 UNCLASSIFIED
  105. 105. Pareto Chart Lean Six Sigma LQA – Living Quarters Allowance PD - Per Diem TQSA – Temporary Quarters Subsistence Allowance AoP - Advice of Payment MEA – Miscellaneous Expense Allowance PA - Per Annum 105 UNCLASSIFIED
  106. 106. Pareto Charts Lean Six Sigma TASK: Create a Pareto Chart using the Defect and Frequency data  Go to Stat menu > Quality Tools > Pareto Chart  Click inside the “Chart defects table:” selection box and enter Defects in Labels and Frequency in Frequency boxes  Click OK 106 UNCLASSIFIED
  107. 107. Pareto Charts Lean Six Sigma RESULTS: To create a Pareto Chart in EXCEL, summarize the count of Defects by type, sort the sums in order of frequency, highlight the data and click Insert Chart, Column. You can create the percent/cumulative percent chart separately and affix underneath the Column charts. 107 UNCLASSIFIED
  108. 108. Correlation Lean Six Sigma (Response) (Factor)  Identify dependency relationships between two or more variables (Xs and Y). Y X y1 x1  It is customary to call X the y2 x2 input variable (independent) and Y the output variable y3 x3 (dependent). y4 x4 y5 x5 y_nth x_nth 108 UNCLASSIFIED
  109. 109. Scatter Diagram Lean Six Sigma  Good for finding and/or confirming relationships between measures  Will not prove that a cause-and-effect relationship exists  Can assist in identifying which process inputs impact the process output  Add evidence to opinion regarding cause and effect  Can identify clues for improvement  Enables teams to test hunches between two factors  Examples:  Ice Cream Sales as they relate to outside temperature  Demand for gasoline as it relates to the price at the pump 109 UNCLASSIFIED
  110. 110. Scatter Diagram Lean Six Sigma Scatter Diagram for Cycle Time vs Number of Inv. Skids 12.0 Hours to Perform 10.0 Inventory 8.0 6.0 4.0 2.0 0.0 0 1000 2000 3000 4000 Number of Inventory Skids 110 UNCLASSIFIED
  111. 111. Scatter Diagrams Patterns Lean Six Sigma (Dependent Variable) X and Y appear to be unrelated Y is more variable as X increases (Dependent Variable) Y Y X (Independent Variable) X (Independent Variable) Y Decreases as X Increases Y Increases as X Increases (negative linear trend) (positive linear trend) (Dependent Variable) (Dependent Variable) Y Y X (Independent Variable) X (Independent Variable) 111 UNCLASSIFIED
  112. 112. Examples of Variable Relationships Lean Six Sigma 55 No Relationship Strong Linear 54 60 53 52 51 50 50 49 48 47 40 46 45 46.5 47.5 48.5 49.5 50.5 51.5 52.5 53.5 60 70 80 X1 Strong Non-Linear 55 ModerateXLinear 6.0 54 53 52 5.5 51 50 49 5.0 48 47 46 4.5 45 0 10 20 30 40 50 60 70 80 90 100 46 47 48 49 50 51 52 53 54 55 112 UNCLASSIFIED
  113. 113. Abuse & Misuse of Correlation Lean Six Sigma  If we establish a correlation between X1 and Y, that does NOT necessarily mean variation in X1 caused variation in Y  A third variable that is associated with both X1 and Y may be “lurking.”  Relationship could be coincidental  To conclude that there is a relationship between two variables does NOT mean that there is a cause and effect relationship. Correlation Does NOT Determine Causation! A study conducted in New York indicated there was a proportional rise in ice cream sales and murder rates during summer months. Correlation or coincidence? 113 UNCLASSIFIED
  114. 114. Scatter Plots Lean Six Sigma Definition: Shows relationships between numerical variables (NOT non-numeric variables!)  To create scatter plots we need to related numerical variables. Therefore we need to add the Variation data for Teams 2 and 3:  Go to the worksheet and click on the first cell of column C8 (T2-Variation)  Input the data as shown in the picture to the right  Do the same for column C11 (T3-Variation) 114 UNCLASSIFIED
  115. 115. Scatter Plots Lean Six Sigma TASK: Create a graph showing the relationship between the Distance and the Variation for Statapult Teams 2 and 3: • Go to Graph menu > Scatterplot • Select Simple • Select X and Y variables • Click on Multiple Graphs 115 UNCLASSIFIED
  116. 116. Scatter Plots (Cont...) Six Sigma Lean  Select Overlaid on the same RESULTS: graph Scatterplot of T2-Variation vs T2-Distance, T3-Variation vs T3-Distanc Variable 6 T2-Variation * T2-Distance T3-Variation * T3-Distance 5 4 Y-Data 3 2 1 0 20 30 40 50 60 70 80 90 100 110 X-Data 116 UNCLASSIFIED
  117. 117. Scatter Plots Lean Six Sigma  To create the Scatter Plot in EXCEL, highlight the X then Y variables for the first team and click Insert Chart, Scatter Plot. Repeat for the second team. Adjust the X and Y matrix scales to match the larger dimensions. T2-Variation T-3 Variation 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 T2-Variation 3.00 T-3 Variation 2.00 2.00 1.00 1.00 0.00 0.00 -10 10 30 50 70 90 110 130 150 0 50 100 150 117 UNCLASSIFIED
  118. 118. Boxplot Distribution Lean Six Sigma Maximum Length Interquartile Range 75th Percentile Middle 50% of 50th Percentile (Median) Data 25th Percentile Outliers 118 UNCLASSIFIED
  119. 119. Boxplots Lean Six Sigma Definition: Box plots summarize data in percentages (%) using the Median (not the Mean!) * 50 * Outliers Top wisker (76 - 100%) Top whisker (76-100%) 40 Third quartile Top box (51 - 75%) 30 Median 20 Bottom box (26 - 50%) First quartile 10 Bottom whisker (0 - 25%) 0 Series 119 UNCLASSIFIED
  120. 120. Boxplots Lean Six Sigma TASK: Make Box Plots of T1-Distance, T2-Distance, T3-Distance, T4-Distance, and T5-Distance:  Go to Graph menu > Boxplot  Select Multiple Ys Simple > Click OK  Click in the Variables box and select T1-Distance, T2-Distance,T3- Distance, T4-Distance, and T5-Distance  Click OK twice 120 UNCLASSIFIED
  121. 121. Boxplots Lean Six Sigma RESULTS: EXCEL does not have a Boxplot template – but it can be created, although the process is far more cumbersome. Instructions and a sample are provided in the OSD LSSTools section of the DEPMS Sandbox work tree. 121 UNCLASSIFIED