Master Plan For Growth<br />2012-2016<br />1<br />
Poised For Growth<br />1. New Leadership<br /><ul><li>New Executive Director
New Board Leadership
Passionate Staff</li></ul>4. New Funding Relationships<br />2. New Team<br />3. New Brand & New Vision<br />The Guadalupe ...
External Opportunities<br />Population Growth<br />Preparing to meet the needs of San Antonio’s future<br />Tourism Potent...
City-Center Connectivity<br />The Guadalupe is a critical piece of San Antonio’s cultural fabric.<br /><ul><li>Only 1.8 mi...
Easy connection to South Town
2 VIA bus lines stop at GCAC</li></ul>mercado<br />riverwalk<br />riverwalk<br />Hemisfair<br />riverwalk<br />4<br />King...
The Guadalupe is a critical piece of the Westside community fabric.<br />GUADALUPE ST<br />BRAZOS ST<br />BRAZOS ST<br />r...
Guadalupe Cultural Corridor<br />BRAZOS ST<br />GUADALUPE ST<br />6<br />
Upcoming SlideShare
Loading in...5
×

Cult cor-plan-110502-full

127

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
127
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Cult cor-plan-110502-full

  1. 1. Master Plan For Growth<br />2012-2016<br />1<br />
  2. 2. Poised For Growth<br />1. New Leadership<br /><ul><li>New Executive Director
  3. 3. New Board Leadership
  4. 4. Passionate Staff</li></ul>4. New Funding Relationships<br />2. New Team<br />3. New Brand & New Vision<br />The Guadalupe Cultural Arts Center<br />a premier cultural organization <br />in the 21st century. <br />Ratio of payroll growth to revenue growth $1 : $1.94<br />2<br />
  5. 5. External Opportunities<br />Population Growth<br />Preparing to meet the needs of San Antonio’s future<br />Tourism Potential<br />Tapping the tourist market<br />City-wide Planning Efforts<br />2007 Guadalupe Westside Community Plan<br />2005 Cultural Collaborative Plan<br />2010 SA 2020 initiative <br />2006 CVB Report “Destination: SA<br />3<br />
  6. 6. City-Center Connectivity<br />The Guadalupe is a critical piece of San Antonio’s cultural fabric.<br /><ul><li>Only 1.8 miles from City Hall
  7. 7. Easy connection to South Town
  8. 8. 2 VIA bus lines stop at GCAC</li></ul>mercado<br />riverwalk<br />riverwalk<br />Hemisfair<br />riverwalk<br />4<br />King William neighborhood<br />
  9. 9. The Guadalupe is a critical piece of the Westside community fabric.<br />GUADALUPE ST<br />BRAZOS ST<br />BRAZOS ST<br />restaurant<br />GUADALUPE ST<br />Guadalupe Cultural Arts Center<br />SA ISD Schools<br />SAHA Facilities<br />Restaurant/Retail<br />Community Facilities<br />Cultural/Religious<br />5<br />
  10. 10. Guadalupe Cultural Corridor<br />BRAZOS ST<br />GUADALUPE ST<br />6<br />
  11. 11. PARKING &<br />THEATER<br />EXTENSION<br /><ul><li>Public Parking Garage
  12. 12. Black box theater
  13. 13. Small screening room
  14. 14. Creative retail</li></ul>GUADALUPANITA<br /><ul><li>Purchase property
  15. 15. Renovated kitchens
  16. 16. Continue Café
  17. 17. Culinary Art Center
  18. 18. Two teaching/demonstration kitchens
  19. 19. Historical exhibit with small tasting area.
  20. 20. La Villita style courtyard</li></ul> <br />PASEO DE LA CULTURA<br />“Smart Sidewalk”<br /><ul><li>Trees
  21. 21. Pedestrian breezeway
  22. 22. Benches
  23. 23. Street lights
  24. 24. Bike parking
  25. 25. Public Art</li></ul>CESAR CHAVEZ <br /><ul><li>State of the Art exhibition space
  26. 26. Classroom spaces – music/ theater/dance (soundproof)
  27. 27. Rehearsal Space
  28. 28. Tienda
  29. 29. Recording studio</li></ul>BRAZOS LOT<br /><ul><li>Community Garden
  30. 30. Artist work spaces</li></ul>PHARMACY<br /><ul><li>Restore exterior beauty
  31. 31. Historical exhibition of arts and culture of Westside.
  32. 32. Resource library
  33. 33. Music/Media viewing rooms
  34. 34. New offices</li></ul>TIENDA<br />$.5 Million<br />$2 Million<br />$1.5 Million<br />$3 Million<br />$3 Million<br />7<br />$2 Million<br />
  35. 35. 2007 Bond Savings Proposal<br />PASEO DE LA CULTURA<br />“Smart Sidewalk”<br /><ul><li>Trees
  36. 36. Pedestrian breezeway
  37. 37. Benches
  38. 38. Street lights
  39. 39. Bike parking
  40. 40. Public Art</li></ul>Est. Cost: $2 million <br />8<br />
  41. 41. 2012 Bond Proposal<br />PHARMACY<br /><ul><li>Restore exterior beauty
  42. 42. Historical exhibition of arts and culture of Westside.
  43. 43. Resource library
  44. 44. Music/Media viewing rooms
  45. 45. New offices</li></ul>Est Cost: $2 Million<br />PARKING & THEATEREXTENSION<br /><ul><li>Public Parking Garage
  46. 46. Black box theater
  47. 47. Small screening room
  48. 48. Creative retail</li></ul>Est. Cost: $2 Million<br />9<br />
  49. 49. 2012 Bond Proposal <br />Guadalupanita<br /><ul><li>Purchase property
  50. 50. Renovated kitchens
  51. 51. Continue Café
  52. 52. Culinary Art Center
  53. 53. Two teaching/demonstration kitchens
  54. 54. Historical exhibit with small tasting area.
  55. 55. La Villita style courtyard</li></ul>Est Cost: $2 Million<br />Cesar Chavez Building<br /><ul><li>State of the Art exhibition space
  56. 56. Classroom spaces – music/ theater/dance (soundproof)
  57. 57. Rehearsal Space
  58. 58. Tienda
  59. 59. Recording studio</li></ul>Est. Cost: $3 Million<br />10<br />
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×