Boston’s South End
What’s New and What’s Next?
Event Sponsors




PR Partner:                    Media Partner:
Bus Tour
Overview




             Randi Lathrop
Director of Business Development
 Boston Redevelopment Authority
NAIOP MASSACHUSETTS
                 PRESENTATION

                                   MARCH 5, 2013
                Vision and Development Overview
                  for the Harrison Albany Corridor


--Randi Lathrop, Director of Business Development
      --Justin Krebs, Principal, Normandy Partners
--Ted Tye, Managing Partner, National Development



                                         BOSTON
                                  REDEVELOPMENT
                                       AUTHORITY
CORRIDOR OVERVIEW AND PLANNING PROCESS
PLANNING PROCESS




- 2.5 year public process
- 16+ meetings
- 30-member Advisory Group
- Consultant & in-house
  analysis

- Visioning
- Public realm
- Transportation
- Zoning recommendations




                        BOSTON
                 REDEVELOPMENT
                      AUTHORITY
BACKGROUND & VISION




• GUIDE FUTURE GROWTH THROUGH COLLECTIVE VISION

• BALANCE MARKET INTERESTS VS. NEIGHBORHOOD CONCERNS

• LAND USE CONTROL

• UPDATE CURRENT ZONING

• REGULATE BUILD-OUT TO TRANSPORTATION CAPACITY

• CREATE NEW CONNECTIONS

• ENHANCE PUBLIC TRANSPORTATION




                                                                  BOSTON
                                                           REDEVELOPMENT
                                                                AUTHORITY
BACKGROUND & VISION
URBAN DESIGN FRAMEWORK
PUBLIC REALM



URBAN DESIGN FRAMEWORK
1. USE CORRIDORS

2. GREEN CORRIDORS

3. PLACE-MAKING

4. STREET GRID & BLOCK PATTERN

5. STREETSCAPE TYPES

6. HEIGHT

7. FAR




                                             BOSTON
                                      REDEVELOPMENT
                                           AUTHORITY
PUBLIC REALM
                                                                                                   STREET GRID AND BLOCK PATTERN




• Images are illustrative for planning purposes and not definitive                                                            BOSTON
                                                                                                                       REDEVELOPMENT
• Linework does not represent actual alignments or dimensions and instead reflect general intent                            AUTHORITY
HEIGHT CHANGES
ZONING
                                               EXISTING AS OF RIGHT HEIGHT                                                      PROPOSED AS OF RIGHT HEIGHT




        STREET WALL: 10 ft. STEPBACK @70 ft.                                                 STREET WALL: 10 ft. STEPBACK @70 ft.


• Images are illustrative for planning purposes and not definitive                                                                                       BOSTON
                                                                                                                                                  REDEVELOPMENT
• Linework does not represent actual alignments or dimensions and instead reflect general intent                                                       AUTHORITY
ZONING
                                               EXISTING PDA HEIGHT                                                          PROPOSED PDA HEIGHT




        STREET WALL: 10 ft. STEPBACK @70 ft.                                         STREET WALL: 10 ft. STEPBACK @70 ft.


• Images are illustrative for planning purposes and not definitive                                                                           BOSTON
                                                                                                                                      REDEVELOPMENT
• Linework does not represent actual alignments or dimensions and instead reflect general intent                                           AUTHORITY
FLOOR AREA RATIO CHANGES




Proposed 275 Albany St.
ZONING
                                        EXISTING AS OF RIGHT FAR                                   PROPOSED AS OF RIGHT FAR




• Images are illustrative for planning purposes and not definitive                                                       BOSTON
                                                                                                                  REDEVELOPMENT
• Linework does not represent actual alignments or dimensions and instead reflect general intent                       AUTHORITY
ZONING
                                                   EXISTING PDA FAR                                PROPOSED PDA FAR




• Images are illustrative for planning purposes and not definitive                                               BOSTON
                                                                                                          REDEVELOPMENT
• Linework does not represent actual alignments or dimensions and instead reflect general intent               AUTHORITY
HEIGHTS AND FLOOR AREA RATIO COMBINED
ZONING
                                 PROPOSED AS OF RIGHT HEIGHT/FAR                                                             PROPOSED PDA HEIGHT/FAR




        STREET WALL: 10 ft. STEPBACK @70 ft.                                          STREET WALL: 10 ft. STEPBACK @70 ft.


• Images are illustrative for planning purposes and not definitive                                                                                BOSTON
                                                                                                                                           REDEVELOPMENT
• Linework does not represent actual alignments or dimensions and instead reflect general intent                                                AUTHORITY
ZONING
                                                                                                         PROPOSED AS OF RIGHT HEIGHT/FAR



                            100 ft                        100 ft
                              4.0                            4.0
                                                      70 ft
                                           70 ft       4.0
                                                                     100 ft
                                                                      4.0               110 ft    150 ft
                                                                             70 ft          4.0    4.0
                                                                              4.0
                                                                                    70 ft



                                                                            70 ft                 120 ft




                                                                                                                                      BOSTON
                                                                                                                               REDEVELOPMENT
• Images are illustrative for planning purposes and not definitive                                                                  AUTHORITY
ZONING
                                                                                                       PROPOSED PDA HEIGHT/FAR

                                      200 ft
                                        6.5               200 ft
                            150 ft                         6.5
                              6.5
                                                       100 ft
                                           70 ft         6.5         70 ft
                                                                      4.0
                                                                             120 ft          200 ft
                                                                              6.5             6.5

                                                                                     70 ft



                                                                             70 ft            120 ft




                                                                                                                            BOSTON
                                                                                                                     REDEVELOPMENT
• Images are illustrative for planning purposes and not definitive                                                        AUTHORITY
MAXIMUM LOT COVERAGE
ZONING
  INCENTIVES – LOT COVERAGE



Lot Coverage Requirement
 - parcels ≥1 acre
 - max 80% lot coverage
       - footprints, parking, service
 - 20% public access &
   enhanced public realm




                             BOSTON
                      REDEVELOPMENT
                           AUTHORITY
DEVELOPMENT INCENTIVE PROGRAM
ZONING
                                                                                               INCENTIVES – USE AMENITY


USE AMENITY:         One of the following use amenities must be included in a PDA project.


Affordable Housing

20% of the project’s residential units must qualify as affordable housing according to the Inclusionary Development
Program of the City of Boston.

OR

Affordable Cultural Space

5% of the bonus square footage must be provided on site to a cultural group whose eligibility for the program is TBD by the
BRA.

OR

Affordable Commercial Space

5% of the bonus square footage must a) be provided on site to a start-up business whose eligibility for the program is TBD
by the BRA or b) its equivalent value must be provided to a program/loan fund.

OR

Mixed-Use Projects

For mixed use projects, an equivalent combination of the aforementioned amenities may be combined pursuant to the
BRA’s approval.



                                                                                                                           BOSTON
                                                                                                                    REDEVELOPMENT
                                                                                                                         AUTHORITY
ZONING
                                                                       INCENTIVES – HYPOTHETICAL USE AMENITY CALCULATION

                                                                                                               PDA
50,000 sq. ft. (1.15 acre) Lot                                                                                 FAR 6.5
                                                                                      Bonus                    325,000 SF
As of Right FAR 4.0 : 50,000 sq. ft. x FAR 4.0 = 200,000 sq. ft.                      FAR 2.5
                                                                                      125,000 SF
PDA FAR 6.5 :            50,000 sq. ft. x FAR 6.5 = 325,000 sq. ft.
                                                                                                               FAR 4.0
Bonus Floor Area :                                   125,000 sq. ft.                                           200,000 SF

                                                                                      As of Right
                                                                                      FAR 4.0




RESIDENTIAL DEVELOPMENT : 20% of the project’s residential units
                                                                                                    50,000 SF(1.15 acre) Lot

Unit size assumption : 1,000 sq. ft. /unit
As of Right FAR 4.0 : 200,000 sq. ft. – 200 units
PDA FAR 6.5 :          325,000 sq. ft. – 325 units
Total 325 units


65 affordable units = 20% of 325 units

COMMERCIAL DEVELOPMENT: 5% of the bonus square footage


As of Right FAR 4.0 : 200,000 sq. ft.
PDA FAR 6.5 :           325,000 sq. ft.
Bonus Floor Area :      125,000 sq. ft.


6,250 sq. ft. affordable cultural/commercial space = 5% of 125,000 sq. ft.


                                                                                                                            BOSTON
                                                                                                                     REDEVELOPMENT
                                                                                                                          AUTHORITY
LAND USE CHANGES
LAND USE




                         PROPOSED LAND USE REGULATION CHANGES WITHIN FOUR NEW PROPOSED ZONING SUBDISTRICTS
                                                 EDA-North                 EDA-Central             EDA-South             EDA BioSquare
                                          (New York Streets sub-area)    (SOWA sub-area)      (BackStreets sub-area)    (Medical sub-area)
                                             Existing / Proposed        Existing / Proposed   Existing / Proposed      Existing / Proposed
Bar                                                 F/C                        F/C                    F/C                     F/C
Multi-family Dwelling                               A/A                        A/A                    A/C                     A/C
Dorms                                               F/C                        F/F                    F/C                     F/C
Fitness Center or Gymnasium (< 2000sf )             C/A                        C/A                    C/A                     C/A
Fitness Center or Gymnasium (> 2000sf)              C/C                        C/C                    C/C                     C/C
Artists’ Mixed-Use                                  A/A                        A/A                    A/C                     A/C
Research Laboratory                                 C/C                        C/C                    C/C                     C/A
Museum                                              C/A                        C/A                    C/C                     C/C
Theatre                                             C/A                        C/A                    C/C                     C/C
Ticket Sales                                        C/A                        C/A                    C/A                     C/A
Airport-related remote parking facility             C/F                        C/F                    C/F                     C/F




                                                                                                                                   BOSTON
                                                                                                                            REDEVELOPMENT
                                                                                                                                 AUTHORITY
TRANSPORTATION

FULL BUILD-OUT ASSUMPTIONS




NY                             3.9 million SF
SOWA                           2.2 million SF
BACK STREETS                   2.8 million SF
BU MEDICAL                     1.1 million SF


TOTAL GSF            10 million New SF

TRAFFIC GENERATION PURPOSES

Adjusted GSF    7.3 million New SF
(GSF 32% for Parking = Leasable GSF)

* Existing GSF in study area is ~7 million SF




                                         BOSTON
                                  REDEVELOPMENT
                                       AUTHORITY
Development Presentation




        Justin Krebs
Principal and Region Head
    Normandy Real Estate
Planning History
275 Albany Street




  CONCEPT DESIGN PACKAGE 3   01.30.2013
Context Plan




               CONCEPT DESIGN PACKAGE 3   01.30.2013
Connectivity and Community
    Berkeley Community Gardens        Bean Factory                    Ink Block Grocery, Restaurants     Harborwalk Bike Trail




     Permitted Exterior                                                                                  Harborwalk Bike Trail




Peters Park Dog Run and Movie Night                  Rotch soccer, baseball fields     Yotel Nightlife             Broadway ‘T’

                                             CONCEPT DESIGN PACKAGE 3                                                 01.30.2013
Context Plan




               CONCEPT DESIGN PACKAGE 3   01.30.2013
Initial BRA Design Process
2007




          CONCEPT DESIGN PACKAGE 3   01.30.2013
325’ TOWER : ‘Gateway to the city’




                 CONCEPT DESIGN PACKAGE 3   01.30.2013
180’ TOWER




             CONCEPT DESIGN PACKAGE 3   01.30.2013
Highway View




               CONCEPT DESIGN PACKAGE 3   01.30.2013
Traveler Street View




                 CONCEPT DESIGN PACKAGE 3   01.30.2013
Ground Plan




              CONCEPT DESIGN PACKAGE 3   01.30.2013
2010 PNF
2 HOTELS




       CONCEPT DESIGN PACKAGE 3   01.30.2013
Traveler Street View




                 CONCEPT DESIGN PACKAGE 3   01.30.2013
East Berkeley Street View




                 CONCEPT DESIGN PACKAGE 3   01.30.2013
Plans




        CONCEPT DESIGN PACKAGE 3   01.30.2013
2010 – 2012
Harrison Albany Corridor
STRATEGIC PLAN




        CONCEPT DESIGN PACKAGE 3   01.30.2013
2012 NPC
1 APT. TOWER +
1 HOTEL



      CONCEPT DESIGN PACKAGE 3   01.30.2013
Traveler Street
View




                  CONCEPT DESIGN PACKAGE 3   01.30.2013
Previous design
Previous Rendering




                CONCEPT DESIGN PACKAGE 3   01.30.2013
Site/Roof Plan


                         PARKING GARAGE




                                                                            TRAVELER STREET
                                                   APARTMENT
                                                   TOWER


                YOTEL
EAST BERKELEY
   STREET




                              ALBANY STREET



                        CONCEPT DESIGN PACKAGE 3               01.30.2013
2013 NPC
ALL RESIDENTIAL




       CONCEPT DESIGN PACKAGE 3   01.30.2013
Traveler Street View




                  CONCEPT DESIGN PACKAGE 3   01.30.2013
East Berkeley Street View




                   CONCEPT DESIGN PACKAGE 3   01.30.2013
Landscape Site Plan




                 CONCEPT DESIGN PACKAGE 3   01.30.2013
Traveler Street View




                  CONCEPT DESIGN PACKAGE 3   01.30.2013
Ground floor plan




                CONCEPT DESIGN PACKAGE 3   01.30.2013
Development Presentation




          Ted Tye
    Managing Partner
National Development
Boston’s South End
   What’s New and What’s Next?




                   www.inkblockboston.com

Ted Tye
Managing Partner                            March 5, 2013
Panel




   Justin Krebs          Randi Lathrop             Ted Tye            Moderator:
Normandy Real Estate   Boston Redevelopment   National Development   Doug Landry
                             Authority
                                                                     Vanasse Hangen
                                                                       Brustlin, Inc.

        Questions for the panel? Text them to 617-549-8440
Thank you!

More Related Content

Viewers also liked

Tsunza peninsula plots for SAle in Mombasa Kenya, a great real estate opportu...
Tsunza peninsula plots for SAle in Mombasa Kenya, a great real estate opportu...Tsunza peninsula plots for SAle in Mombasa Kenya, a great real estate opportu...
Tsunza peninsula plots for SAle in Mombasa Kenya, a great real estate opportu...NairobiRealEstates
 
9/9 FRI 8:00 | The Redevelopment of Downtown West Palm Beach
9/9 FRI 8:00 | The Redevelopment of Downtown West Palm Beach9/9 FRI 8:00 | The Redevelopment of Downtown West Palm Beach
9/9 FRI 8:00 | The Redevelopment of Downtown West Palm BeachAPA Florida
 
Presentation On the Development of The Springs Shopping Center
Presentation On the Development of The Springs Shopping CenterPresentation On the Development of The Springs Shopping Center
Presentation On the Development of The Springs Shopping CenterJohn Raymond
 
Creative Financing Methods to Fund Project Finance-PPP Projects
Creative Financing Methods to Fund Project Finance-PPP ProjectsCreative Financing Methods to Fund Project Finance-PPP Projects
Creative Financing Methods to Fund Project Finance-PPP ProjectsCherylOberdorf
 
City of Peoria, AZ- Entertainment District Presentation
City of Peoria, AZ- Entertainment District PresentationCity of Peoria, AZ- Entertainment District Presentation
City of Peoria, AZ- Entertainment District Presentationsbettencourt
 
KYC Harbour Redevelopment - AGM 2013 - Status Update
KYC Harbour Redevelopment  - AGM 2013 - Status UpdateKYC Harbour Redevelopment  - AGM 2013 - Status Update
KYC Harbour Redevelopment - AGM 2013 - Status Updatekingstonyc
 
TOD Redevelopment on the Grandest Scale by Tom Young
TOD Redevelopment on the Grandest Scale by Tom YoungTOD Redevelopment on the Grandest Scale by Tom Young
TOD Redevelopment on the Grandest Scale by Tom YoungRail~Volution
 
Case Study: Fairplex Redevelopment Project
Case Study: Fairplex Redevelopment ProjectCase Study: Fairplex Redevelopment Project
Case Study: Fairplex Redevelopment Projectsix14
 
Latin America's Media Market 2013
Latin America's Media Market 2013Latin America's Media Market 2013
Latin America's Media Market 2013USMediaConsulting
 

Viewers also liked (14)

Tsunza peninsula plots for SAle in Mombasa Kenya, a great real estate opportu...
Tsunza peninsula plots for SAle in Mombasa Kenya, a great real estate opportu...Tsunza peninsula plots for SAle in Mombasa Kenya, a great real estate opportu...
Tsunza peninsula plots for SAle in Mombasa Kenya, a great real estate opportu...
 
MIA Central Terminal Redevelopment Program presentation, November 19, 2014
MIA Central Terminal Redevelopment Program presentation, November 19, 2014MIA Central Terminal Redevelopment Program presentation, November 19, 2014
MIA Central Terminal Redevelopment Program presentation, November 19, 2014
 
9/9 FRI 8:00 | The Redevelopment of Downtown West Palm Beach
9/9 FRI 8:00 | The Redevelopment of Downtown West Palm Beach9/9 FRI 8:00 | The Redevelopment of Downtown West Palm Beach
9/9 FRI 8:00 | The Redevelopment of Downtown West Palm Beach
 
Presentation On the Development of The Springs Shopping Center
Presentation On the Development of The Springs Shopping CenterPresentation On the Development of The Springs Shopping Center
Presentation On the Development of The Springs Shopping Center
 
Monterey Park Economic Strategic Planning Workshop 9 May 2009
Monterey Park Economic Strategic Planning Workshop 9 May 2009Monterey Park Economic Strategic Planning Workshop 9 May 2009
Monterey Park Economic Strategic Planning Workshop 9 May 2009
 
Creative Financing Methods to Fund Project Finance-PPP Projects
Creative Financing Methods to Fund Project Finance-PPP ProjectsCreative Financing Methods to Fund Project Finance-PPP Projects
Creative Financing Methods to Fund Project Finance-PPP Projects
 
City of Peoria, AZ- Entertainment District Presentation
City of Peoria, AZ- Entertainment District PresentationCity of Peoria, AZ- Entertainment District Presentation
City of Peoria, AZ- Entertainment District Presentation
 
South Stockton Redevelopment Project CEE224X Final Presentation
South Stockton Redevelopment Project CEE224X Final PresentationSouth Stockton Redevelopment Project CEE224X Final Presentation
South Stockton Redevelopment Project CEE224X Final Presentation
 
KYC Harbour Redevelopment - AGM 2013 - Status Update
KYC Harbour Redevelopment  - AGM 2013 - Status UpdateKYC Harbour Redevelopment  - AGM 2013 - Status Update
KYC Harbour Redevelopment - AGM 2013 - Status Update
 
TOD Redevelopment on the Grandest Scale by Tom Young
TOD Redevelopment on the Grandest Scale by Tom YoungTOD Redevelopment on the Grandest Scale by Tom Young
TOD Redevelopment on the Grandest Scale by Tom Young
 
Case Study: Fairplex Redevelopment Project
Case Study: Fairplex Redevelopment ProjectCase Study: Fairplex Redevelopment Project
Case Study: Fairplex Redevelopment Project
 
Competition and Market Studies in Latin America: The case of Chile, Colombia,...
Competition and Market Studies in Latin America: The case of Chile, Colombia,...Competition and Market Studies in Latin America: The case of Chile, Colombia,...
Competition and Market Studies in Latin America: The case of Chile, Colombia,...
 
Latin America's Media Market 2013
Latin America's Media Market 2013Latin America's Media Market 2013
Latin America's Media Market 2013
 
A Slum Redevelopment Project
A Slum Redevelopment ProjectA Slum Redevelopment Project
A Slum Redevelopment Project
 

More from bostonredevelop

Colliers Overview June 2013
Colliers Overview June 2013Colliers Overview June 2013
Colliers Overview June 2013bostonredevelop
 
Peter Meade Chamber May 2013
Peter Meade Chamber May 2013Peter Meade Chamber May 2013
Peter Meade Chamber May 2013bostonredevelop
 
Building up downtown crossing
Building up downtown crossingBuilding up downtown crossing
Building up downtown crossingbostonredevelop
 
Dec. 11 2012 south end presentation
Dec. 11 2012 south end presentationDec. 11 2012 south end presentation
Dec. 11 2012 south end presentationbostonredevelop
 
2012 dec11cmaa breakfast 1
2012 dec11cmaa breakfast 12012 dec11cmaa breakfast 1
2012 dec11cmaa breakfast 1bostonredevelop
 
2010 census the big story
2010 census  the big story2010 census  the big story
2010 census the big storybostonredevelop
 
A Sampling of Downtown and South Boston Waterfronts
A Sampling of Downtown and South Boston WaterfrontsA Sampling of Downtown and South Boston Waterfronts
A Sampling of Downtown and South Boston Waterfrontsbostonredevelop
 
Downtown and South Boston Waterfront: A Sampling of Developments
Downtown and South Boston Waterfront: A Sampling of DevelopmentsDowntown and South Boston Waterfront: A Sampling of Developments
Downtown and South Boston Waterfront: A Sampling of Developmentsbostonredevelop
 

More from bostonredevelop (11)

Colliers Overview June 2013
Colliers Overview June 2013Colliers Overview June 2013
Colliers Overview June 2013
 
Peter Meade Chamber May 2013
Peter Meade Chamber May 2013Peter Meade Chamber May 2013
Peter Meade Chamber May 2013
 
Building up downtown crossing
Building up downtown crossingBuilding up downtown crossing
Building up downtown crossing
 
Meade naiop march 2013
Meade   naiop march 2013Meade   naiop march 2013
Meade naiop march 2013
 
Converse photos blog
Converse photos blogConverse photos blog
Converse photos blog
 
Dec. 11 2012 south end presentation
Dec. 11 2012 south end presentationDec. 11 2012 south end presentation
Dec. 11 2012 south end presentation
 
2012 dec11cmaa breakfast 1
2012 dec11cmaa breakfast 12012 dec11cmaa breakfast 1
2012 dec11cmaa breakfast 1
 
Link images
Link imagesLink images
Link images
 
2010 census the big story
2010 census  the big story2010 census  the big story
2010 census the big story
 
A Sampling of Downtown and South Boston Waterfronts
A Sampling of Downtown and South Boston WaterfrontsA Sampling of Downtown and South Boston Waterfronts
A Sampling of Downtown and South Boston Waterfronts
 
Downtown and South Boston Waterfront: A Sampling of Developments
Downtown and South Boston Waterfront: A Sampling of DevelopmentsDowntown and South Boston Waterfront: A Sampling of Developments
Downtown and South Boston Waterfront: A Sampling of Developments
 

Boston's south end

  • 1. March 5, 2013 Boston’s South End What’s New and What’s Next?
  • 2. Event Sponsors PR Partner: Media Partner:
  • 4. Overview Randi Lathrop Director of Business Development Boston Redevelopment Authority
  • 5. NAIOP MASSACHUSETTS PRESENTATION MARCH 5, 2013 Vision and Development Overview for the Harrison Albany Corridor --Randi Lathrop, Director of Business Development --Justin Krebs, Principal, Normandy Partners --Ted Tye, Managing Partner, National Development BOSTON REDEVELOPMENT AUTHORITY
  • 6. CORRIDOR OVERVIEW AND PLANNING PROCESS
  • 7. PLANNING PROCESS - 2.5 year public process - 16+ meetings - 30-member Advisory Group - Consultant & in-house analysis - Visioning - Public realm - Transportation - Zoning recommendations BOSTON REDEVELOPMENT AUTHORITY
  • 8. BACKGROUND & VISION • GUIDE FUTURE GROWTH THROUGH COLLECTIVE VISION • BALANCE MARKET INTERESTS VS. NEIGHBORHOOD CONCERNS • LAND USE CONTROL • UPDATE CURRENT ZONING • REGULATE BUILD-OUT TO TRANSPORTATION CAPACITY • CREATE NEW CONNECTIONS • ENHANCE PUBLIC TRANSPORTATION BOSTON REDEVELOPMENT AUTHORITY
  • 11. PUBLIC REALM URBAN DESIGN FRAMEWORK 1. USE CORRIDORS 2. GREEN CORRIDORS 3. PLACE-MAKING 4. STREET GRID & BLOCK PATTERN 5. STREETSCAPE TYPES 6. HEIGHT 7. FAR BOSTON REDEVELOPMENT AUTHORITY
  • 12. PUBLIC REALM STREET GRID AND BLOCK PATTERN • Images are illustrative for planning purposes and not definitive BOSTON REDEVELOPMENT • Linework does not represent actual alignments or dimensions and instead reflect general intent AUTHORITY
  • 14. ZONING EXISTING AS OF RIGHT HEIGHT PROPOSED AS OF RIGHT HEIGHT STREET WALL: 10 ft. STEPBACK @70 ft. STREET WALL: 10 ft. STEPBACK @70 ft. • Images are illustrative for planning purposes and not definitive BOSTON REDEVELOPMENT • Linework does not represent actual alignments or dimensions and instead reflect general intent AUTHORITY
  • 15. ZONING EXISTING PDA HEIGHT PROPOSED PDA HEIGHT STREET WALL: 10 ft. STEPBACK @70 ft. STREET WALL: 10 ft. STEPBACK @70 ft. • Images are illustrative for planning purposes and not definitive BOSTON REDEVELOPMENT • Linework does not represent actual alignments or dimensions and instead reflect general intent AUTHORITY
  • 16. FLOOR AREA RATIO CHANGES Proposed 275 Albany St.
  • 17. ZONING EXISTING AS OF RIGHT FAR PROPOSED AS OF RIGHT FAR • Images are illustrative for planning purposes and not definitive BOSTON REDEVELOPMENT • Linework does not represent actual alignments or dimensions and instead reflect general intent AUTHORITY
  • 18. ZONING EXISTING PDA FAR PROPOSED PDA FAR • Images are illustrative for planning purposes and not definitive BOSTON REDEVELOPMENT • Linework does not represent actual alignments or dimensions and instead reflect general intent AUTHORITY
  • 19. HEIGHTS AND FLOOR AREA RATIO COMBINED
  • 20. ZONING PROPOSED AS OF RIGHT HEIGHT/FAR PROPOSED PDA HEIGHT/FAR STREET WALL: 10 ft. STEPBACK @70 ft. STREET WALL: 10 ft. STEPBACK @70 ft. • Images are illustrative for planning purposes and not definitive BOSTON REDEVELOPMENT • Linework does not represent actual alignments or dimensions and instead reflect general intent AUTHORITY
  • 21. ZONING PROPOSED AS OF RIGHT HEIGHT/FAR 100 ft 100 ft 4.0 4.0 70 ft 70 ft 4.0 100 ft 4.0 110 ft 150 ft 70 ft 4.0 4.0 4.0 70 ft 70 ft 120 ft BOSTON REDEVELOPMENT • Images are illustrative for planning purposes and not definitive AUTHORITY
  • 22. ZONING PROPOSED PDA HEIGHT/FAR 200 ft 6.5 200 ft 150 ft 6.5 6.5 100 ft 70 ft 6.5 70 ft 4.0 120 ft 200 ft 6.5 6.5 70 ft 70 ft 120 ft BOSTON REDEVELOPMENT • Images are illustrative for planning purposes and not definitive AUTHORITY
  • 24. ZONING INCENTIVES – LOT COVERAGE Lot Coverage Requirement - parcels ≥1 acre - max 80% lot coverage - footprints, parking, service - 20% public access & enhanced public realm BOSTON REDEVELOPMENT AUTHORITY
  • 26. ZONING INCENTIVES – USE AMENITY USE AMENITY: One of the following use amenities must be included in a PDA project. Affordable Housing 20% of the project’s residential units must qualify as affordable housing according to the Inclusionary Development Program of the City of Boston. OR Affordable Cultural Space 5% of the bonus square footage must be provided on site to a cultural group whose eligibility for the program is TBD by the BRA. OR Affordable Commercial Space 5% of the bonus square footage must a) be provided on site to a start-up business whose eligibility for the program is TBD by the BRA or b) its equivalent value must be provided to a program/loan fund. OR Mixed-Use Projects For mixed use projects, an equivalent combination of the aforementioned amenities may be combined pursuant to the BRA’s approval. BOSTON REDEVELOPMENT AUTHORITY
  • 27. ZONING INCENTIVES – HYPOTHETICAL USE AMENITY CALCULATION PDA 50,000 sq. ft. (1.15 acre) Lot FAR 6.5 Bonus 325,000 SF As of Right FAR 4.0 : 50,000 sq. ft. x FAR 4.0 = 200,000 sq. ft. FAR 2.5 125,000 SF PDA FAR 6.5 : 50,000 sq. ft. x FAR 6.5 = 325,000 sq. ft. FAR 4.0 Bonus Floor Area : 125,000 sq. ft. 200,000 SF As of Right FAR 4.0 RESIDENTIAL DEVELOPMENT : 20% of the project’s residential units 50,000 SF(1.15 acre) Lot Unit size assumption : 1,000 sq. ft. /unit As of Right FAR 4.0 : 200,000 sq. ft. – 200 units PDA FAR 6.5 : 325,000 sq. ft. – 325 units Total 325 units 65 affordable units = 20% of 325 units COMMERCIAL DEVELOPMENT: 5% of the bonus square footage As of Right FAR 4.0 : 200,000 sq. ft. PDA FAR 6.5 : 325,000 sq. ft. Bonus Floor Area : 125,000 sq. ft. 6,250 sq. ft. affordable cultural/commercial space = 5% of 125,000 sq. ft. BOSTON REDEVELOPMENT AUTHORITY
  • 29. LAND USE PROPOSED LAND USE REGULATION CHANGES WITHIN FOUR NEW PROPOSED ZONING SUBDISTRICTS EDA-North EDA-Central EDA-South EDA BioSquare (New York Streets sub-area) (SOWA sub-area) (BackStreets sub-area) (Medical sub-area) Existing / Proposed Existing / Proposed Existing / Proposed Existing / Proposed Bar F/C F/C F/C F/C Multi-family Dwelling A/A A/A A/C A/C Dorms F/C F/F F/C F/C Fitness Center or Gymnasium (< 2000sf ) C/A C/A C/A C/A Fitness Center or Gymnasium (> 2000sf) C/C C/C C/C C/C Artists’ Mixed-Use A/A A/A A/C A/C Research Laboratory C/C C/C C/C C/A Museum C/A C/A C/C C/C Theatre C/A C/A C/C C/C Ticket Sales C/A C/A C/A C/A Airport-related remote parking facility C/F C/F C/F C/F BOSTON REDEVELOPMENT AUTHORITY
  • 30. TRANSPORTATION FULL BUILD-OUT ASSUMPTIONS NY 3.9 million SF SOWA 2.2 million SF BACK STREETS 2.8 million SF BU MEDICAL 1.1 million SF TOTAL GSF 10 million New SF TRAFFIC GENERATION PURPOSES Adjusted GSF 7.3 million New SF (GSF 32% for Parking = Leasable GSF) * Existing GSF in study area is ~7 million SF BOSTON REDEVELOPMENT AUTHORITY
  • 31. Development Presentation Justin Krebs Principal and Region Head Normandy Real Estate
  • 32. Planning History 275 Albany Street CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 33. Context Plan CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 34. Connectivity and Community Berkeley Community Gardens Bean Factory Ink Block Grocery, Restaurants Harborwalk Bike Trail Permitted Exterior Harborwalk Bike Trail Peters Park Dog Run and Movie Night Rotch soccer, baseball fields Yotel Nightlife Broadway ‘T’ CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 35. Context Plan CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 36. Initial BRA Design Process 2007 CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 37. 325’ TOWER : ‘Gateway to the city’ CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 38. 180’ TOWER CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 39. Highway View CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 40. Traveler Street View CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 41. Ground Plan CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 42. 2010 PNF 2 HOTELS CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 43. Traveler Street View CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 44. East Berkeley Street View CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 45. Plans CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 46. 2010 – 2012 Harrison Albany Corridor STRATEGIC PLAN CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 47. 2012 NPC 1 APT. TOWER + 1 HOTEL CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 48. Traveler Street View CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 49. Previous design Previous Rendering CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 50. Site/Roof Plan PARKING GARAGE TRAVELER STREET APARTMENT TOWER YOTEL EAST BERKELEY STREET ALBANY STREET CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 51. 2013 NPC ALL RESIDENTIAL CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 52. Traveler Street View CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 53. East Berkeley Street View CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 54. Landscape Site Plan CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 55. Traveler Street View CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 56. Ground floor plan CONCEPT DESIGN PACKAGE 3 01.30.2013
  • 57. Development Presentation Ted Tye Managing Partner National Development