Your SlideShare is downloading. ×
0
Washington State  Ocean Energy Conference November 9, 2011 Executive Director – Jeffery K. Robb
Alternative Energy <ul><li>Port Strategic Plan :  </li></ul><ul><li>Be a Leader in the Assessment and Development of New M...
Port Angeles…Ideally Located Port Angeles
Port Angeles Harbor Terminal #1 & #3 Terminal #7 Terminal #5
Terminal  #1 <ul><li>Berth Capacity up to 1,200 feet </li></ul><ul><li>125,000 Dead Weight Tonnage </li></ul><ul><li>38 Fe...
 
Airport and Industrial Properties <ul><li>William R. Fairchild International Airport </li></ul><ul><li>6350 ’ Runway Capab...
Angeles Composite Technologies 125 Jobs and growing…
Composites Manufacturing Campus Expansion
November 3, 2011
Competitive Advantages <ul><li>Proximity to Ocean Energy </li></ul><ul><li>Deep Water Harbor with Marine Terminals  </li><...
Port of Port Angeles Leaders in Economic Development
Upcoming SlideShare
Loading in...5
×

Cwts ocean energy robb

142

Published on

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
142
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Cwts ocean energy robb"

  1. 1. Washington State Ocean Energy Conference November 9, 2011 Executive Director – Jeffery K. Robb
  2. 2. Alternative Energy <ul><li>Port Strategic Plan : </li></ul><ul><li>Be a Leader in the Assessment and Development of New Market Opportunities </li></ul><ul><li>Partnership with Battelle </li></ul><ul><li>Supported EDC Grant Application to Develop Alternative Energy Road Map </li></ul><ul><li>Develop Waterfront Infrastructure in Support of Industry </li></ul><ul><li>Develop Industrial Park Facilities in Support of Industry </li></ul>
  3. 3. Port Angeles…Ideally Located Port Angeles
  4. 4. Port Angeles Harbor Terminal #1 & #3 Terminal #7 Terminal #5
  5. 5. Terminal #1 <ul><li>Berth Capacity up to 1,200 feet </li></ul><ul><li>125,000 Dead Weight Tonnage </li></ul><ul><li>38 Feet Draft at Berth </li></ul><ul><li>Cold Iron Electrical Services </li></ul><ul><li>Topside Repair of Ships and Barges </li></ul><ul><li>Tug and Fueling Services </li></ul><ul><li>Terminal #3 </li></ul><ul><li>Berth Capacity up to 750 feet </li></ul><ul><li>Engineering and Permitting in Process to Expand to 1,200 feet Capacity </li></ul>
  6. 7. Airport and Industrial Properties <ul><li>William R. Fairchild International Airport </li></ul><ul><li>6350 ’ Runway Capable up to 737 Aircraft </li></ul><ul><li>Instrument Landing System (ILS) </li></ul><ul><li>Scheduled Air Service </li></ul><ul><li>110 acre Industrial Park </li></ul><ul><li>Access to Primary and Secondary Runway </li></ul><ul><li>Additional Industrial Property Available </li></ul><ul><li>Under Construction Two 25,000 SF Composite Manufacturing Buildings </li></ul>
  7. 8. Angeles Composite Technologies 125 Jobs and growing…
  8. 9. Composites Manufacturing Campus Expansion
  9. 10. November 3, 2011
  10. 11. Competitive Advantages <ul><li>Proximity to Ocean Energy </li></ul><ul><li>Deep Water Harbor with Marine Terminals </li></ul><ul><li>Trained Marine Trades Workforce </li></ul><ul><li>Industrial Manufacturing Facilities </li></ul><ul><li>International Airport </li></ul><ul><li>Pacific Northwest National Laboratory </li></ul><ul><li>Peninsula College </li></ul><ul><li>Community Support </li></ul>
  11. 12. Port of Port Angeles Leaders in Economic Development
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×