BSEF 2013 invest/crimea Loic_Leminiaux

  1. 1. Joint Venture between the environmental arm of the Saffelberg group, Belgium and investment-construction group, leader in Turkey – – – – Thermal: 1270MW realised or co-realised Hydro: 765 MW realised Geothermal: 48 MW realised, 162 MW in progress 5 Wind farms for 253MW realised + 70MW by 2013
  2. 2. The Project • • • • • • • 250 MW wind farm, 780 GWh/year Cutting-edge technology Gamesa G125-4.5MW 56 wind turbines in 2 stages Connection and construction permit obtained Mandate letter signed with ERBD and IFC 125MW by beginning 2015 125MW by end 2016
  3. 3. The location
  4. 4. Environmental Impact • Avoiding the emission of 688,216.4 T of CO2 per year • Avoiding the consumption of an equivalent of 477 mln m3 of (imported) gas • Highest environmental standards
  5. 5. Commitment to Community • Full support of local communities and republican authorities • Integration into the strategy for the sustainable development of the district • Public consultation by international standards • 350 000 € at full operation for economic and social projects (focus on self-supporting projects), of which 50 000 € in 2013.
  6. 6. Economic and Social Impact • 220 direct and indirect jobs during construction (until end 2016), including nacelle assembly (local content) • 50 permanent jobs during operations (>2030) • By 2030 95 mln € of profit taxes and 235 mln € of VAT