Human Exploration Framework Team Presentation

1,123 views
1,023 views

Published on

Summary of Phase I
- Developed an investment portfolio that strikes a balance of new developments, technology, and operational programs with an eye towards a new way of exploring.
- Created a point of departure DRM that is flexible and can evolve over time to support multiple destinations with the identified systems.
- Identified a minimum subset of elements needed to conduct earlier beyond LEO missions.
- Infused key technology developments
that should begin in earnest and identified gaps which should help inform additional technology prioritization over and above the NEO focused DRM.
- Costed the DRM using traditional costing methodologies.
- Determined alternative development options are required to address the cost and schedule shortfalls."

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,123
On SlideShare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
26
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

×