Cement Production

Material flow in a cement plant dry process.
  – Rawmaterials for grey cement and white cement
  – Basic process
  – Blending, drying and grinding
  – Preheating and calcining
  – Burning , clinkerization
  – Concrete, cement and the hardening proces
What is cement?
 Clinker (95%) and gypsum (5%)
 Cement Clinker consist of Calcium-oxide – CaO:
 (”limestone/chalk”) ~ 75-80%
  + clay-minerals:
  Silicium-oxide – SiO2
  Aluminium-oxide – Al2O3          ca 20-25%
  Iron-oxide – Fe2O3
These main components must be present in a very exact ratio.
Both the ratio between the limestone component and the clay
components as well as the ratio between the various clay
components must be kept within strict limits to obtain the
desired quality of the cement
Romans used concrete 125 AD.
Cement Plant
                                                                                              Filter                              Filter
                                                                    Crusher
                                                                                                                   Analyzer
               Limestone               Clay         Sand                Iron

                              1                2              3                 4                           Raw meal
                                                                                                            silo
                                                                                    Storage

                                                                                                                                           Coal mill


                                                          1
                                                    2
                                              4 3

                                                                                              Raw mill




               Clinker
               Silo




                           Separator


                                                                                                         Packers
2    3
                                                              Cement          Cement
                                                              silo            silo
                                                                                                                                                                        Cement
                                                                                                                                                                        silo


                            Cement mill
                                                        Gear unit                                                                                      Ship unloading
Roller press
                                                                                                                   Ship loading
Quarry and raw materials
The 4 main components in clinker:




Lime saturation factor (LSF)
= 100xC / (2.8xS + 1,18xA + 0,65xF)   93 – 98%

Silica ratio (MS)
= S/ (A+F)                            2.3 - 2.8

Alumina ratio (MA)
=A/F                                  1.0 - 1.8
Portland Cement clinker

     Typical values for rawmix


       CaO     63 - 67 %
       SiO2    20 - 24 %
       Al2O3   4 - 7 %
       Fe2O3   2 - 4 %
White Cement

•   Rawmix iron content < 1 %
•   Low content of Cr, Mn
•   Reducing conditions in kiln (with oil)
•   Rapid cooling in cooler (quenching)
•   Very fine grinding in cement mill
Blasting
FLS EV knuser




 • EV 200*300-1

(Diameter/Width/no. of inlet rollers)
Shear test
Roller crusher
Typical guaranty
        parameters
• Production
• Lifetime of hammers/teeth
• kWh pr. ton crushed material
Apron Feeder
Material storage
Typical guarantee
        parameters
• Stacker/Reclaimer capacity
• Homogenization capability
• Handling of wet material
Cement Plant
                                                                                              Filter                              Filter
                                                                    Crusher
                                                                                                                   Analyzer
               Limestone               Clay         Sand                Iron

                              1                2              3                 4                           Raw meal
                                                                                                            silo
                                                                                    Storage

                                                                                                                                           Coal mill


                                                          1
                                                    2
                                              4 3

                                                                                              Raw mill




               Clinker
               Silo




                           Separator


                                                                                                         Packers
2    3
                                                              Cement          Cement
                                                              silo            silo
                                                                                                                                                                        Cement
                                                                                                                                                                        silo


                            Cement mill
                                                        Gear unit                                                                                      Ship unloading
Roller press
                                                                                                                   Ship loading
Rawmaterial siloes Haiphong
Feeders
Atox rawmill

       • Atox 42.5
       (Table diameter ø4,2 m)
Gas and ground material


    Material in



                         Separator



   Rollers


Smokegas from kiln
Grindingtest Atox 3,5
TUMS ball mill
Smokegas from kiln




         Separator
                                  Product
    Material in

                         Rejects return to mill


                     Gas and ground material
Typical guarantee
         parameters
• Production/Fineness
• Lifetime of rollers and table (wear)
• kWh pr. ton ground material
CF silo
• Homogenizations factor >8
• LOW or DLD kilnfeed system
Rawmaterial homogenization
     Raw meal blending silo
     CF - Continuous Flow
Cement Plant
                                                                                              Filter                              Filter
                                                                    Crusher
                                                                                                                   Analyzer
               Limestone               Clay         Sand                Iron

                              1                2              3                 4                           Raw meal
                                                                                                            silo
                                                                                    Storage

                                                                                                                                           Coal mill


                                                          1
                                                    2
                                              4 3

                                                                                              Raw mill




               Clinker
               Silo




                           Separator


                                                                                                         Packers
2    3
                                                              Cement          Cement
                                                              silo            silo
                                                                                                                                                                        Cement
                                                                                                                                                                        silo


                            Cement mill
                                                        Gear unit                                                                                      Ship unloading
Roller press
                                                                                                                   Ship loading
Main machines in a dryprocess kiln system
PREHEATER
ROTARY KILN
COOLER
MAIN BURNER
Heating and calcination
The main component, limestone, enters the clinker as
calcium oxide - CaO
But is only present in nature as calcium carbonate– CaCO3

An important part of the process is therefore the
calcination of the calcium carbonate


               CaCO3        → CaO + CO2
         occurs at 890 °C


CO2 is expelled ”through the chimney”
This means that we must use:
1.5-1.6 kg rawmaterial for every kg of cement!
ILC - In-Line Calciner   Rawmeal from CF silo




                            Kiln inlet
S 2-base kiln
                                     13 x D inside lining
                                              6.8 x D                      3.6 x D
                 2.3 x D
   Rotary Kiln



                                         øD




S 3-base kiln
                                     17 x D inside lining
                                                                 6.4 x D             2xD
  1.3 x D                  5.3 x D
                                                            øD
Rotax 2 Kiln
FLS Duoflex burner
Front view
             Side view
Portland Cement Clinker

         Clinker mineral formation


    2 CaO + SiO2   → C2S (belite)

    C2S + CaO      → C3S (alite)

    3 CaO + Al2O3 → C3A (celit)

    4 CaO + Al2O3 + Fe2O3 → C4AF (celit)
Portland Cement klinker

         Clinker minerals

             Ranges
                 Typical
        C3S45 - 65 %
        C2S     15 - 30 %
        C3A     6 - 10 %
        C4AF    8 - 12 %
Clinker

                Porosity
C2S
                           Porosity




                           Free CaO
C3S
Typical guarantee parameters for
 a 5-stage calciner kiln


 •   Production ton per day (tpd)
 •   Heatconsumption kcal/kg klinker (710-730)
 •   kWh pr. ton clinker (20-25)
 •   Maximum free lime CaO <1.5%
FLS - SF cooler
SF CROSS-BAR™ CONVEYING
         SYSTEM
MFR system
Typical guarantee
        parameters
• Production (tpd)
• kWh pr. ton clinker
• Clinker temperature exit cooler
Clinker silo
Cement Plant
                                                                                              Filter                              Filter
                                                                    Crusher
                                                                                                                   Analyzer
               Limestone               Clay         Sand                Iron

                              1                2              3                 4                           Raw meal
                                                                                                            silo
                                                                                    Storage

                                                                                                                                           Coal mill


                                                          1
                                                    2
                                              4 3

                                                                                              Raw mill




               Clinker
               Silo




                           Separator


                                                                                                         Packers
2    3
                                                              Cement          Cement
                                                              silo            silo
                                                                                                                                                                        Cement
                                                                                                                                                                        silo


                            Cement mill
                                                        Gear unit                                                                                      Ship unloading
Roller press
                                                                                                                   Ship loading
Clinker grinding
Grinding of cement




                     Ball mill
Grinding of cement in OK mill
Typical guarantee
 parameters

   • Production ton/hour
   • kWh pr. ton cement
   • Fineness (Blaine or
     sieve residue)




 For white cement
  the colour is
  guaranteed
Cement silos
Ventomatic
CFI-Silo
Cement Plant
                                                                                              Filter                              Filter
                                                                    Crusher
                                                                                                                   Analyzer
               Limestone               Clay         Sand                Iron

                              1                2              3                 4                           Raw meal
                                                                                                            silo
                                                                                    Storage

                                                                                                                                           Coal mill


                                                          1
                                                    2
                                              4 3

                                                                                              Raw mill




               Clinker
               Silo




                           Separator


                                                                                                         Packers
2    3
                                                              Cement          Cement
                                                              silo            silo
                                                                                                                                                                        Cement
                                                                                                                                                                        silo


                            Cement mill
                                                        Gear unit                                                                                      Ship unloading
Roller press
                                                                                                                   Ship loading

More Related Content

What's hot

Cement mill notebook
Cement mill notebookCement mill notebook
Cement mill notebookNael Shabana
 
Ln clinker cooler golden rules 2010 11 17
Ln clinker cooler golden rules 2010 11 17Ln clinker cooler golden rules 2010 11 17
Ln clinker cooler golden rules 2010 11 17mkpq pasha
 
Cement industry : grinding process of ball mill
Cement industry : grinding process of ball millCement industry : grinding process of ball mill
Cement industry : grinding process of ball millPankaj Verma
 
Cement plant operations handbook 7th
Cement plant operations handbook 7thCement plant operations handbook 7th
Cement plant operations handbook 7thVu Jacson
 
Cements Ground in the Vertical Roller Mill Fulfil the Quality Requirements of...
Cements Ground in the Vertical Roller Mill Fulfil the Quality Requirements of...Cements Ground in the Vertical Roller Mill Fulfil the Quality Requirements of...
Cements Ground in the Vertical Roller Mill Fulfil the Quality Requirements of...LOESCHE
 
Installation of Refractory Materials in Rotary Kilns ”Essential principles"
Installation of Refractory Materials in Rotary Kilns ”Essential principles"Installation of Refractory Materials in Rotary Kilns ”Essential principles"
Installation of Refractory Materials in Rotary Kilns ”Essential principles"Refratechnik Group
 
Heat & Mass Balance in Cement Plant
Heat & Mass Balance in Cement PlantHeat & Mass Balance in Cement Plant
Heat & Mass Balance in Cement PlantNITIN ASNANI
 
Influence of process on quality
Influence of process on qualityInfluence of process on quality
Influence of process on qualitypradeepdeepi
 
aixergee - Process Optimization for the Cement Industry
aixergee - Process Optimization for the Cement Industryaixergee - Process Optimization for the Cement Industry
aixergee - Process Optimization for the Cement IndustryLOESCHE
 
Ensuring Maximum Operational Performance in Cement Plant
Ensuring Maximum Operational Performance in Cement PlantEnsuring Maximum Operational Performance in Cement Plant
Ensuring Maximum Operational Performance in Cement PlantFouad Ghoneim, PMP®, SSYB®
 
Energy Benchmarking For cement Industry Final Copy.pdf
Energy Benchmarking For cement Industry Final Copy.pdfEnergy Benchmarking For cement Industry Final Copy.pdf
Energy Benchmarking For cement Industry Final Copy.pdfMan_Ebook
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing processNITIN ASNANI
 
Atox 22.50 coal mill optimization
Atox 22.50 coal mill optimizationAtox 22.50 coal mill optimization
Atox 22.50 coal mill optimizationNITIN ASNANI
 
Analysis of Various Cement grinding Systems with Respect to Power Consumption...
Analysis of Various Cement grinding Systems with Respect to Power Consumption...Analysis of Various Cement grinding Systems with Respect to Power Consumption...
Analysis of Various Cement grinding Systems with Respect to Power Consumption...Karan Walia
 
How to Control Kiln Shell Corrosion Report
How to Control Kiln Shell Corrosion ReportHow to Control Kiln Shell Corrosion Report
How to Control Kiln Shell Corrosion ReportAnkit Karwa
 
Burner bible
Burner bibleBurner bible
Burner biblesimmsos
 
Heat optimisation pradeep kumar
Heat optimisation  pradeep kumarHeat optimisation  pradeep kumar
Heat optimisation pradeep kumarpradeepdeepi
 

What's hot (20)

Cement mill notebook
Cement mill notebookCement mill notebook
Cement mill notebook
 
Ln clinker cooler golden rules 2010 11 17
Ln clinker cooler golden rules 2010 11 17Ln clinker cooler golden rules 2010 11 17
Ln clinker cooler golden rules 2010 11 17
 
Cement industry : grinding process of ball mill
Cement industry : grinding process of ball millCement industry : grinding process of ball mill
Cement industry : grinding process of ball mill
 
Cement plant-operation-handbook by yaser elkelawy
Cement plant-operation-handbook by yaser elkelawyCement plant-operation-handbook by yaser elkelawy
Cement plant-operation-handbook by yaser elkelawy
 
Cement plant operations handbook 7th
Cement plant operations handbook 7thCement plant operations handbook 7th
Cement plant operations handbook 7th
 
Cements Ground in the Vertical Roller Mill Fulfil the Quality Requirements of...
Cements Ground in the Vertical Roller Mill Fulfil the Quality Requirements of...Cements Ground in the Vertical Roller Mill Fulfil the Quality Requirements of...
Cements Ground in the Vertical Roller Mill Fulfil the Quality Requirements of...
 
Installation of Refractory Materials in Rotary Kilns ”Essential principles"
Installation of Refractory Materials in Rotary Kilns ”Essential principles"Installation of Refractory Materials in Rotary Kilns ”Essential principles"
Installation of Refractory Materials in Rotary Kilns ”Essential principles"
 
Heat & Mass Balance in Cement Plant
Heat & Mass Balance in Cement PlantHeat & Mass Balance in Cement Plant
Heat & Mass Balance in Cement Plant
 
Influence of process on quality
Influence of process on qualityInfluence of process on quality
Influence of process on quality
 
aixergee - Process Optimization for the Cement Industry
aixergee - Process Optimization for the Cement Industryaixergee - Process Optimization for the Cement Industry
aixergee - Process Optimization for the Cement Industry
 
Cement course
Cement courseCement course
Cement course
 
Ensuring Maximum Operational Performance in Cement Plant
Ensuring Maximum Operational Performance in Cement PlantEnsuring Maximum Operational Performance in Cement Plant
Ensuring Maximum Operational Performance in Cement Plant
 
Energy Benchmarking For cement Industry Final Copy.pdf
Energy Benchmarking For cement Industry Final Copy.pdfEnergy Benchmarking For cement Industry Final Copy.pdf
Energy Benchmarking For cement Industry Final Copy.pdf
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing process
 
Atox 22.50 coal mill optimization
Atox 22.50 coal mill optimizationAtox 22.50 coal mill optimization
Atox 22.50 coal mill optimization
 
Analysis of Various Cement grinding Systems with Respect to Power Consumption...
Analysis of Various Cement grinding Systems with Respect to Power Consumption...Analysis of Various Cement grinding Systems with Respect to Power Consumption...
Analysis of Various Cement grinding Systems with Respect to Power Consumption...
 
How to Control Kiln Shell Corrosion Report
How to Control Kiln Shell Corrosion ReportHow to Control Kiln Shell Corrosion Report
How to Control Kiln Shell Corrosion Report
 
Burner bible
Burner bibleBurner bible
Burner bible
 
Heat optimisation pradeep kumar
Heat optimisation  pradeep kumarHeat optimisation  pradeep kumar
Heat optimisation pradeep kumar
 
Formulas kiln
Formulas kilnFormulas kiln
Formulas kiln
 

Viewers also liked

Process Fans Used in Cement Industry
Process Fans Used in Cement IndustryProcess Fans Used in Cement Industry
Process Fans Used in Cement IndustryNeelRao
 
Cement rotary kiln questions & answers
Cement rotary kiln questions & answersCement rotary kiln questions & answers
Cement rotary kiln questions & answersNael Shabana
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing processShreenath Bohra
 
Hydraulic system vertical roller mill operation
Hydraulic system vertical roller mill operationHydraulic system vertical roller mill operation
Hydraulic system vertical roller mill operationlinxiaomo
 
Cement preparation By Kamran wazir
Cement preparation By Kamran wazirCement preparation By Kamran wazir
Cement preparation By Kamran wazirKamran Wazir
 
Portland cement mfg. process for finance, subsidy & project related support...
Portland cement mfg. process   for finance, subsidy & project related support...Portland cement mfg. process   for finance, subsidy & project related support...
Portland cement mfg. process for finance, subsidy & project related support...Radha Krishna Sahoo
 
Cement Process Chemistry
Cement Process ChemistryCement Process Chemistry
Cement Process ChemistryShambhudayal
 
Cement manufacturing process new
Cement manufacturing process newCement manufacturing process new
Cement manufacturing process newAshvani Shukla
 
Vertical raw mill pradeep kumar
Vertical raw mill pradeep kumarVertical raw mill pradeep kumar
Vertical raw mill pradeep kumarpradeepdeepi
 
Kiln 5 Drive System Preliminary Root Cause Analysis_rev2
Kiln 5 Drive System Preliminary Root Cause Analysis_rev2Kiln 5 Drive System Preliminary Root Cause Analysis_rev2
Kiln 5 Drive System Preliminary Root Cause Analysis_rev2Thebe Thebe.Setshedi
 
Standalone Vertical Roller Mills Without HGG
Standalone Vertical Roller Mills Without HGGStandalone Vertical Roller Mills Without HGG
Standalone Vertical Roller Mills Without HGGLOESCHE
 
Afcm 2015 successful commissioning of ok mill at pt semen gresik v insite
Afcm 2015 successful commissioning of ok mill at pt semen gresik   v insiteAfcm 2015 successful commissioning of ok mill at pt semen gresik   v insite
Afcm 2015 successful commissioning of ok mill at pt semen gresik v insiteFLSmidth & Co. A/S.
 
Life cycle assessment pabrik semen holcim
Life cycle assessment pabrik semen holcimLife cycle assessment pabrik semen holcim
Life cycle assessment pabrik semen holcimHaelis Muslimah
 
Vertical roller mill routine maintenance note
Vertical roller mill routine maintenance noteVertical roller mill routine maintenance note
Vertical roller mill routine maintenance noteZhengzhou
 
IDA Presentation
IDA PresentationIDA Presentation
IDA Presentationimran_mattu
 

Viewers also liked (19)

Process Fans Used in Cement Industry
Process Fans Used in Cement IndustryProcess Fans Used in Cement Industry
Process Fans Used in Cement Industry
 
Cement rotary kiln questions & answers
Cement rotary kiln questions & answersCement rotary kiln questions & answers
Cement rotary kiln questions & answers
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing process
 
Kiln axis
Kiln axisKiln axis
Kiln axis
 
Hydraulic system vertical roller mill operation
Hydraulic system vertical roller mill operationHydraulic system vertical roller mill operation
Hydraulic system vertical roller mill operation
 
Cement preparation By Kamran wazir
Cement preparation By Kamran wazirCement preparation By Kamran wazir
Cement preparation By Kamran wazir
 
Portland cement mfg. process for finance, subsidy & project related support...
Portland cement mfg. process   for finance, subsidy & project related support...Portland cement mfg. process   for finance, subsidy & project related support...
Portland cement mfg. process for finance, subsidy & project related support...
 
Cement Process Chemistry
Cement Process ChemistryCement Process Chemistry
Cement Process Chemistry
 
VRM
VRMVRM
VRM
 
Cement
CementCement
Cement
 
Cement manufacturing process new
Cement manufacturing process newCement manufacturing process new
Cement manufacturing process new
 
Vertical raw mill pradeep kumar
Vertical raw mill pradeep kumarVertical raw mill pradeep kumar
Vertical raw mill pradeep kumar
 
Kiln 5 Drive System Preliminary Root Cause Analysis_rev2
Kiln 5 Drive System Preliminary Root Cause Analysis_rev2Kiln 5 Drive System Preliminary Root Cause Analysis_rev2
Kiln 5 Drive System Preliminary Root Cause Analysis_rev2
 
Standalone Vertical Roller Mills Without HGG
Standalone Vertical Roller Mills Without HGGStandalone Vertical Roller Mills Without HGG
Standalone Vertical Roller Mills Without HGG
 
Afcm 2015 successful commissioning of ok mill at pt semen gresik v insite
Afcm 2015 successful commissioning of ok mill at pt semen gresik   v insiteAfcm 2015 successful commissioning of ok mill at pt semen gresik   v insite
Afcm 2015 successful commissioning of ok mill at pt semen gresik v insite
 
Life cycle assessment pabrik semen holcim
Life cycle assessment pabrik semen holcimLife cycle assessment pabrik semen holcim
Life cycle assessment pabrik semen holcim
 
Resume yogesh
Resume yogeshResume yogesh
Resume yogesh
 
Vertical roller mill routine maintenance note
Vertical roller mill routine maintenance noteVertical roller mill routine maintenance note
Vertical roller mill routine maintenance note
 
IDA Presentation
IDA PresentationIDA Presentation
IDA Presentation
 

Recently uploaded

Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524najka9823
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 

Recently uploaded (20)

Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 

Cement Manufacturing hrs_eng

  • 1. Jesper Kjersgaard Nielsen Sales Manager Cement Division, EMEA & APAC F.L.Smidth A/S Vigerslev Allé 77 • DK-2500 Valby • Copenhagen • Denmark Tel +45 36 18 10 00 • Direct line +45 36 18 21 59 Mobile: + 45 30 93 21 59 JeKN@FLSmidth.com
  • 2. Cement Production Material flow in a cement plant dry process. – Rawmaterials for grey cement and white cement – Basic process – Blending, drying and grinding – Preheating and calcining – Burning , clinkerization – Concrete, cement and the hardening proces
  • 3. What is cement? Clinker (95%) and gypsum (5%) Cement Clinker consist of Calcium-oxide – CaO: (”limestone/chalk”) ~ 75-80% + clay-minerals: Silicium-oxide – SiO2 Aluminium-oxide – Al2O3 ca 20-25% Iron-oxide – Fe2O3 These main components must be present in a very exact ratio. Both the ratio between the limestone component and the clay components as well as the ratio between the various clay components must be kept within strict limits to obtain the desired quality of the cement
  • 5. Cement Plant Filter Filter Crusher Analyzer Limestone Clay Sand Iron 1 2 3 4 Raw meal silo Storage Coal mill 1 2 4 3 Raw mill Clinker Silo Separator Packers 2 3 Cement Cement silo silo Cement silo Cement mill Gear unit Ship unloading Roller press Ship loading
  • 6. Quarry and raw materials
  • 7.
  • 8. The 4 main components in clinker: Lime saturation factor (LSF) = 100xC / (2.8xS + 1,18xA + 0,65xF) 93 – 98% Silica ratio (MS) = S/ (A+F) 2.3 - 2.8 Alumina ratio (MA) =A/F 1.0 - 1.8
  • 9. Portland Cement clinker Typical values for rawmix CaO 63 - 67 % SiO2 20 - 24 % Al2O3 4 - 7 % Fe2O3 2 - 4 %
  • 10. White Cement • Rawmix iron content < 1 % • Low content of Cr, Mn • Reducing conditions in kiln (with oil) • Rapid cooling in cooler (quenching) • Very fine grinding in cement mill
  • 11.
  • 12.
  • 14.
  • 15. FLS EV knuser • EV 200*300-1 (Diameter/Width/no. of inlet rollers)
  • 16.
  • 17.
  • 20. Typical guaranty parameters • Production • Lifetime of hammers/teeth • kWh pr. ton crushed material
  • 23.
  • 24.
  • 25. Typical guarantee parameters • Stacker/Reclaimer capacity • Homogenization capability • Handling of wet material
  • 26. Cement Plant Filter Filter Crusher Analyzer Limestone Clay Sand Iron 1 2 3 4 Raw meal silo Storage Coal mill 1 2 4 3 Raw mill Clinker Silo Separator Packers 2 3 Cement Cement silo silo Cement silo Cement mill Gear unit Ship unloading Roller press Ship loading
  • 29. Atox rawmill • Atox 42.5 (Table diameter ø4,2 m)
  • 30. Gas and ground material Material in Separator Rollers Smokegas from kiln
  • 33. Smokegas from kiln Separator Product Material in Rejects return to mill Gas and ground material
  • 34. Typical guarantee parameters • Production/Fineness • Lifetime of rollers and table (wear) • kWh pr. ton ground material
  • 35. CF silo • Homogenizations factor >8 • LOW or DLD kilnfeed system
  • 36. Rawmaterial homogenization Raw meal blending silo CF - Continuous Flow
  • 37.
  • 38. Cement Plant Filter Filter Crusher Analyzer Limestone Clay Sand Iron 1 2 3 4 Raw meal silo Storage Coal mill 1 2 4 3 Raw mill Clinker Silo Separator Packers 2 3 Cement Cement silo silo Cement silo Cement mill Gear unit Ship unloading Roller press Ship loading
  • 39. Main machines in a dryprocess kiln system
  • 44. Heating and calcination The main component, limestone, enters the clinker as calcium oxide - CaO But is only present in nature as calcium carbonate– CaCO3 An important part of the process is therefore the calcination of the calcium carbonate CaCO3 → CaO + CO2 occurs at 890 °C CO2 is expelled ”through the chimney” This means that we must use: 1.5-1.6 kg rawmaterial for every kg of cement!
  • 45. ILC - In-Line Calciner Rawmeal from CF silo Kiln inlet
  • 46. S 2-base kiln 13 x D inside lining 6.8 x D 3.6 x D 2.3 x D Rotary Kiln øD S 3-base kiln 17 x D inside lining 6.4 x D 2xD 1.3 x D 5.3 x D øD
  • 49. Front view Side view
  • 50. Portland Cement Clinker Clinker mineral formation 2 CaO + SiO2 → C2S (belite) C2S + CaO → C3S (alite) 3 CaO + Al2O3 → C3A (celit) 4 CaO + Al2O3 + Fe2O3 → C4AF (celit)
  • 51. Portland Cement klinker Clinker minerals Ranges Typical C3S45 - 65 % C2S 15 - 30 % C3A 6 - 10 % C4AF 8 - 12 %
  • 52.
  • 53. Clinker Porosity C2S Porosity Free CaO C3S
  • 54. Typical guarantee parameters for a 5-stage calciner kiln • Production ton per day (tpd) • Heatconsumption kcal/kg klinker (710-730) • kWh pr. ton clinker (20-25) • Maximum free lime CaO <1.5%
  • 55.
  • 56. FLS - SF cooler
  • 59. Typical guarantee parameters • Production (tpd) • kWh pr. ton clinker • Clinker temperature exit cooler
  • 61. Cement Plant Filter Filter Crusher Analyzer Limestone Clay Sand Iron 1 2 3 4 Raw meal silo Storage Coal mill 1 2 4 3 Raw mill Clinker Silo Separator Packers 2 3 Cement Cement silo silo Cement silo Cement mill Gear unit Ship unloading Roller press Ship loading
  • 63. Grinding of cement Ball mill
  • 64.
  • 65. Grinding of cement in OK mill
  • 66. Typical guarantee parameters • Production ton/hour • kWh pr. ton cement • Fineness (Blaine or sieve residue) For white cement the colour is guaranteed
  • 68.
  • 71. Cement Plant Filter Filter Crusher Analyzer Limestone Clay Sand Iron 1 2 3 4 Raw meal silo Storage Coal mill 1 2 4 3 Raw mill Clinker Silo Separator Packers 2 3 Cement Cement silo silo Cement silo Cement mill Gear unit Ship unloading Roller press Ship loading

Editor's Notes

  1. Præsentation af dagens stof og underviseren
  2. These main components must be present in a very exact ratio. Both the ratio between the limestone component and the clay components as well as the ratio between the various clay components must be kept within strict limits to obtain the desired quality of the cement
  3. Klassiske FLS oversigt over cement fremstillingsprocessen. 3 naturlige trin i fremstillingen, 2 mellem produkter Rå mel , klinker og slut produktet cement. Indledende 4 lektioner gennemgår vi hele processen så vi starter i bruddet og afstikker omkring kemi når det er nødvendigt.
  4. Forudsætningen for at fremstille cement er en godt rå materiale kilde af en størrelse der også fremtidssikre fabrikkens drift i min. 30-40 år. FLS rolle : Ingen involvering i brud undersøgelser, men benytter sig af diverse konsulenter. Flere af dem eks. FLSér
  5. Cement rock i Canada Typisk 70-80 % kalksten 10-20 % Ler 0-10 % Additiver som sand og jern.
  6. The main constituents in portland cement is calciumoxide, siliciumoxide, aluminumoxide and ironoxide. The typical values of the content of these is shown here. These four constituents are the minerals that are used to control the quality of the clinker.
  7. Rundlager Rail diameter 60 to 110 m Stacking cap. max. 2000 m3/h Reclaiming cap. max. 715 m3/h LHO Type range: Rail width 25 to 50 m Reclaiming cap. max. 1000 m3/h (Stacking with ST (Luffing Stacker) cap. max. 1390 m3/h) SS Type range: Jib length 20, 23 and 25 m Reclaiming cap. max. 525 m3/h (Stacking with ST (Luffing Stacker) cap. max. 1390 m3/h)
  8. Klassiske FLS oversigt over cement fremstillingsprocessen. 3 naturlige trin i fremstillingen, 2 mellem produkter Rå mel , klinker og slut produktet cement. Indledende 4 lektioner gennemgår vi hele processen så vi starter i bruddet og afstikker omkring kemi når det er nødvendigt.
  9. Materialer in i toppen fra lagerne, i bunden ses blå/gule fødeapparater. Størrelsen af siloerne afhænger af det forventede blandingsforhold.
  10. Blanding for at op nå før omtalte kemiske sammensætning. Ingen performance garantier men mølle driften afhænger 100 % af dem
  11. Kemi
  12. Klassiske FLS oversigt over cement fremstillingsprocessen. 3 naturlige trin i fremstillingen, 2 mellem produkter Rå mel , klinker og slut produktet cement. Indledende 4 lektioner gennemgår vi hele processen så vi starter i bruddet og afstikker omkring kemi når det er nødvendigt.
  13. The main component, limestone, enters the clinker as calcium oxide CaO But is only present in nature as calcium carbonate
  14. The before mentioned crystals are created from these reactions.
  15. When the correct amount of each constituent is mix as a raw mix, and burned in the kiln, a chemical reaction will take place. And the following crystals will be created. The percentages is typical values of these in the clinker to obtain the correct strength and properties that are required.
  16. Klassiske FLS oversigt over cement fremstillingsprocessen. 3 naturlige trin i fremstillingen, 2 mellem produkter Rå mel , klinker og slut produktet cement. Indledende 4 lektioner gennemgår vi hele processen så vi starter i bruddet og afstikker omkring kemi når det er nødvendigt.
  17. Klassiske FLS oversigt over cement fremstillingsprocessen. 3 naturlige trin i fremstillingen, 2 mellem produkter Rå mel , klinker og slut produktet cement. Indledende 4 lektioner gennemgår vi hele processen så vi starter i bruddet og afstikker omkring kemi når det er nødvendigt.