Loading…

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

Like this presentation? Why not share!

Audenried High School

on

  • 589 views

PSIT Project.

PSIT Project.

Statistics

Views

Total Views
589
Slideshare-icon Views on SlideShare
589
Embed Views
0

Actions

Likes
0
Downloads
5
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Audenried High School Audenried High School Presentation Transcript

    • New Audenried High School Originally Opened in 1931 New School Opened in 2008
    • Project Specifics
      • School District Capital Improvements Project
      • Multi-Prime Contract
      • 211,515 s.f. Building Budgeted at $62.5 Million Dollars
      • Project included the demolition of the existing structure, land enhancement, construction of two gyms, cafeteria, auditorium, three story classroom wing, library, diesel academy, six science labs, music academy, and a culinary school.
    • Demolition Phase
    • Earth Works/ Reconditioning the Land
    • Architectural Plans
    • Steel and Foundation Work
    • Concrete Progress and Steel Erection Process
    • Concrete Arch Work Main Gym
    • Exterior Façade Work
    • Interior Finish Work
    • Project Responsibilities
      • QA/QC throughout the design, shop drawing, and construction process
      • RFI, COR, and RFP recommendations and review.
      • Overall Coordination of the Project
      • Maintaining all project correspondences
      • Ensured Site Safety with owner supplied policy
      • Ensured schedule compliance
      • Reviewed and processed payment applications
      • Ensured Contact compliance throughout the projects duration.
      • Provided monthly reports on progress.