The   CAN DO   team
 
 
Carbon Budget 2010-2050
Al Gore calls for 100% clean electricity and independence from foreign oil within ten years “ a political promise to do so...
Mark Jacobson: Shifting the world to 100% clean, renewable energy by 2030 The cost of generating and transmitting power wo...
Key technology – concentrating solar thermal power
 
 
 
 
Solar Two –  1996 - 1999 Run by the U.S. DoE,  Sandia National Laboratories,  Lockheed Martin, Bechtel, Boeing 10MW turbin...
50MW – Spain 100MW – Nevada 150MW – California
Baseload Solar Thermal Power Andasol 1,2, Extresol 1, SAMCA 1, Spain, operating now, 7.5 hours energy storage Torresol Gem...
 
 
 
 
 
 
What’s happening in Spain? Access to the grid request of STE projects  by Oct 2009  15.561 MW
 
 
 
Electricity and Energy Demand
Buildings -efficiency, heat pumps & solar
Electrifying vehicle fleet:  5:1 efficiency gain  biofuels for minimal 5% non-electrification Modal shift:  Shift to freig...
Nissan Patrol  Capacity 5 17 litres per 100km How Easy is Energy Efficiency in Transport? Siemens Combino tram Capacity 19...
<ul><li>To supply 60% of Australia’s energy </li></ul><ul><li>Each tower module generates  217 MWe </li></ul><ul><li>Abili...
ZCA2020 Wind Power <ul><li>To Supply 40% of Australia’s energy </li></ul><ul><li>6,400 Enercon E-126 turbines, each  7.5 M...
 
“ The review finds that the transmission scenario proposed is technically feasible in terms of capacity and reliability.  ...
Australia's renewable energy grid: 2020 Australia’s Renewable Energy Grid 2020
 
Getting the job done in as fast as 10 years Manufacturing Construction
CST Scaleup 600,000 Heliostats/yr 30 concrete towers
Enercon Viana Do Costelo Wind Turbine blade and tower factories Portugal 250 towers per year  600 Blades  400 Jobs
Labour Requirements
Achievability: Jobs In Context
Resource Requirements
Solar Thermal Cost Reduction Trajectory
Safe Climate - a Bargain  at 3% of GDP
Cost to  society all energy
1 mirror   OR 20 tons of coal   OUR CHOICE  – for the next 30 years
Support BZE Support Our Research  - Pro bono research - Tax deductible donations - Public communications plan More informa...
Upcoming SlideShare
Loading in...5
×

Zca at woodford 2010

2,099

Published on

Published in: Technology, Business
1 Comment
0 Likes
Statistics
Notes
  • The training program February 26 and 27 very helpful. Ann
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Be the first to like this

No Downloads
Views
Total Views
2,099
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
42
Comments
1
Likes
0
Embeds 0
No embeds

No notes for slide

Zca at woodford 2010

  1. 1. The CAN DO team
  2. 4. Carbon Budget 2010-2050
  3. 5. Al Gore calls for 100% clean electricity and independence from foreign oil within ten years “ a political promise to do something 40 years from now is universally ignored because everyone knows that it's meaningless. Ten years is about the maximum time that we as a nation can hold a steady aim and hit our target.”
  4. 6. Mark Jacobson: Shifting the world to 100% clean, renewable energy by 2030 The cost of generating and transmitting power would be less than the projected cost per kilowatt-hour for fossil-fuel and nuclear power. 3.8 million large wind turbines, 90,000 solar plants, and numerous geothermal, tidal and rooftop photovoltaic installations worldwide.
  5. 7. Key technology – concentrating solar thermal power
  6. 12. Solar Two – 1996 - 1999 Run by the U.S. DoE, Sandia National Laboratories, Lockheed Martin, Bechtel, Boeing 10MW turbine molten salt storage
  7. 13. 50MW – Spain 100MW – Nevada 150MW – California
  8. 14. Baseload Solar Thermal Power Andasol 1,2, Extresol 1, SAMCA 1, Spain, operating now, 7.5 hours energy storage Torresol Gemasolar Spain, on line 2011, 15 hours energy storage 24 hour Dispatchable Power
  9. 21. What’s happening in Spain? Access to the grid request of STE projects by Oct 2009 15.561 MW
  10. 25. Electricity and Energy Demand
  11. 26. Buildings -efficiency, heat pumps & solar
  12. 27. Electrifying vehicle fleet: 5:1 efficiency gain biofuels for minimal 5% non-electrification Modal shift: Shift to freight rail. Electric trains and trams, 50% of urban passenger-kilometres, 25% of non-urban by public transport Electrifying transport
  13. 28. Nissan Patrol Capacity 5 17 litres per 100km How Easy is Energy Efficiency in Transport? Siemens Combino tram Capacity 190 16 litres per 100km (Oil Energy Equiv) ‏ The Nissan Patrol uses more energy to move 5 people around the city than a Siemens tram uses to move 190 people
  14. 29. <ul><li>To supply 60% of Australia’s energy </li></ul><ul><li>Each tower module generates 217 MWe </li></ul><ul><li>Ability to store energy and dispatch as needed, day or night, enough for 17 hrs at full output </li></ul><ul><li>One site or Solar Region will be made up of 19 modules and will have a capacity of 3,500 MW </li></ul><ul><li>Proposed 12 sites distributed across Australia </li></ul>ZCA2020 Solar Thermal Power 217 MW Module 3500 MW Solar Region
  15. 30. ZCA2020 Wind Power <ul><li>To Supply 40% of Australia’s energy </li></ul><ul><li>6,400 Enercon E-126 turbines, each 7.5 MW </li></ul><ul><li>Low-cost, technologically mature, first dispatch </li></ul><ul><li>One Wind Region will be either 2,000 MW (270 turbines) or 3,000 MW ( 400 turbines), distributed among smaller wind farms </li></ul><ul><li>Proposed 23 geographically diverse regions across Australia </li></ul>
  16. 32. “ The review finds that the transmission scenario proposed is technically feasible in terms of capacity and reliability. In addition, the proposed transmission uses mature technology with proven capability around the world.” SKM Review of ZCA2020 transmission The National Grid ZCA2020 National Grid
  17. 33. Australia's renewable energy grid: 2020 Australia’s Renewable Energy Grid 2020
  18. 35. Getting the job done in as fast as 10 years Manufacturing Construction
  19. 36. CST Scaleup 600,000 Heliostats/yr 30 concrete towers
  20. 37. Enercon Viana Do Costelo Wind Turbine blade and tower factories Portugal 250 towers per year 600 Blades 400 Jobs
  21. 38. Labour Requirements
  22. 39. Achievability: Jobs In Context
  23. 40. Resource Requirements
  24. 41. Solar Thermal Cost Reduction Trajectory
  25. 42. Safe Climate - a Bargain at 3% of GDP
  26. 43. Cost to society all energy
  27. 44. 1 mirror OR 20 tons of coal OUR CHOICE – for the next 30 years
  28. 45. Support BZE Support Our Research - Pro bono research - Tax deductible donations - Public communications plan More information at www.beyondzeroemissions.org
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×