<ul><li>Replacement superstructure: £1.44m </li></ul><ul><li>Demolition timescale: 3 months </li></ul><ul><li>Re-construct...
ENVELOPE
 
 
 
Envelope <ul><li>Existing envelope:  </li></ul><ul><li>Single glazed, steel window frames, no insulation= poor thermal and...
 
 
 
Upcoming SlideShare
Loading in …5
×

Ian springford part f

197
-1

Published on

Insight from Apex Hotels: Building a new green hotel in London

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
197
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Ian springford part f

  1. 2. <ul><li>Replacement superstructure: £1.44m </li></ul><ul><li>Demolition timescale: 3 months </li></ul><ul><li>Re-construction timescale: 6 months </li></ul><ul><li>Saving in preliminaries for 9 months: £900,000 </li></ul><ul><li>Total circa £2.34m </li></ul><ul><li>Reduces clients borrowings, reduces clients interest costs, allows for earlier opening and earlier income. </li></ul>Structure
  2. 3. ENVELOPE
  3. 7. Envelope <ul><li>Existing envelope: </li></ul><ul><li>Single glazed, steel window frames, no insulation= poor thermal and acoustic performance </li></ul><ul><li>Limited depth between building line and face of structure </li></ul><ul><li>Limited scope for solar shading </li></ul><ul><li>Hotel does not require even daylighting throughout </li></ul><ul><li>Scope to reduce extent of windows and increase higher performing solid wall </li></ul>

×