Ian springford part f
Upcoming SlideShare
Loading in...5
×
 

Ian springford part f

on

  • 279 views

Insight from Apex Hotels: Building a new green hotel in London

Insight from Apex Hotels: Building a new green hotel in London

Statistics

Views

Total Views
279
Views on SlideShare
278
Embed Views
1

Actions

Likes
0
Downloads
4
Comments
0

1 Embed 1

http://events.building.co.uk 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Ian springford part f Ian springford part f Presentation Transcript

  •  
    • Replacement superstructure: £1.44m
    • Demolition timescale: 3 months
    • Re-construction timescale: 6 months
    • Saving in preliminaries for 9 months: £900,000
    • Total circa £2.34m
    • Reduces clients borrowings, reduces clients interest costs, allows for earlier opening and earlier income.
    Structure
  • ENVELOPE
  •  
  •  
  •  
  • Envelope
    • Existing envelope:
    • Single glazed, steel window frames, no insulation= poor thermal and acoustic performance
    • Limited depth between building line and face of structure
    • Limited scope for solar shading
    • Hotel does not require even daylighting throughout
    • Scope to reduce extent of windows and increase higher performing solid wall
  •  
  •  
  •