0
In 2006, we asked     what if…
Boundary Street at Jean Ribaut Square
Boundary Street at Jean Ribaut Square
Boundary Street at Jean Ribaut Square
Boundary Street at Jean Ribaut Square
Boundary Street at Jean Ribaut Square
Boundary Street at Jean Ribaut Square
Boundary Street at Jean Ribaut Square
Boundary Street at Jean Ribaut Square
…and what if…
south side of Boundary Street
south side of Boundary Street
City of Beaufort Goals for Boundary Street Create Livable Communities through Strategic  Infrastructure Investments Enco...
Boundary Street HistoryTotal Improvement Investment to Date:             $84,000,000
Boundary Street – Present and Future Total Benefit to Local Economy:         $137,136,715
2005 Boundary Street Master Plan
Boundary Street Redevelopment District CodeAdoptedFebruary 2007 Provides  Framework for  Private  Development and  Infras...
Boundary Street Plan – TIGER III Improvements
Retrofitting Suburbia        Beaufort Plaza Main Street Street Trees Lighting Sidewalks Power Lines  Underground On-s...
Complete Streets Boundary Street Section
Improved Mobility Options         Trailhead Park and Multi-Use Path Trailhead 1 Acre Park at Rail-Trail Connection Over ...
Enhanced Connectivity        Neil Road and Parallel Street Street Trees, Lighting and Sidewalks Power Lines Underground...
The Big Moves – Completed and Planned1.   Parallel Road Network2.   Street Trees & Proper Sidewalks3.   “Boulevard-style” ...
Next Steps Design Phase: Feb 2012 – March 2013 Permitting: April 2012 – Oct 2012 NEPA Documentation: Feb 2012 – Oct 201...
Boundary Street Engineering Phasing
Boundary Street - June 11, 2012 Tiger III Grant Presentation
Boundary Street - June 11, 2012 Tiger III Grant Presentation
Boundary Street - June 11, 2012 Tiger III Grant Presentation
Boundary Street - June 11, 2012 Tiger III Grant Presentation
Boundary Street - June 11, 2012 Tiger III Grant Presentation
Upcoming SlideShare
Loading in...5
×

Boundary Street - June 11, 2012 Tiger III Grant Presentation

220

Published on

This was a presentation given by Craig Lewis on June 11, 2012 about the Tiger III Grant the City was awarded to fund the Boundary Street Redevelopment.

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
220
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Boundary Street - June 11, 2012 Tiger III Grant Presentation"

  1. 1. In 2006, we asked what if…
  2. 2. Boundary Street at Jean Ribaut Square
  3. 3. Boundary Street at Jean Ribaut Square
  4. 4. Boundary Street at Jean Ribaut Square
  5. 5. Boundary Street at Jean Ribaut Square
  6. 6. Boundary Street at Jean Ribaut Square
  7. 7. Boundary Street at Jean Ribaut Square
  8. 8. Boundary Street at Jean Ribaut Square
  9. 9. Boundary Street at Jean Ribaut Square
  10. 10. …and what if…
  11. 11. south side of Boundary Street
  12. 12. south side of Boundary Street
  13. 13. City of Beaufort Goals for Boundary Street Create Livable Communities through Strategic Infrastructure Investments Encourage Economic Development on the Corridor Improve Safety and Traffic Flow for Pedestrians, Cyclists and Automobiles
  14. 14. Boundary Street HistoryTotal Improvement Investment to Date: $84,000,000
  15. 15. Boundary Street – Present and Future Total Benefit to Local Economy: $137,136,715
  16. 16. 2005 Boundary Street Master Plan
  17. 17. Boundary Street Redevelopment District CodeAdoptedFebruary 2007 Provides Framework for Private Development and Infrastructure
  18. 18. Boundary Street Plan – TIGER III Improvements
  19. 19. Retrofitting Suburbia Beaufort Plaza Main Street Street Trees Lighting Sidewalks Power Lines Underground On-street Parking
  20. 20. Complete Streets Boundary Street Section
  21. 21. Improved Mobility Options Trailhead Park and Multi-Use Path Trailhead 1 Acre Park at Rail-Trail Connection Over 1 Mile in Trail Parallel to Boundary Street Marsh Repair along Trail Route
  22. 22. Enhanced Connectivity Neil Road and Parallel Street Street Trees, Lighting and Sidewalks Power Lines Underground On-street Parking
  23. 23. The Big Moves – Completed and Planned1. Parallel Road Network2. Street Trees & Proper Sidewalks3. “Boulevard-style” Slow Lane + Parking4. Special Intersections at 2 Key Spots5. Greenspace: “window” squares, marsh-front, possible central park6. Civic Buildings Positioned Correctly7. Strip Centers Convert to Town Blocks
  24. 24. Next Steps Design Phase: Feb 2012 – March 2013 Permitting: April 2012 – Oct 2012 NEPA Documentation: Feb 2012 – Oct 2012 ROW Acquisition: Aug 2012 – April 2013 Bidding: April 2013 – May 2013 Construction: June 2012 – Jan 2015
  25. 25. Boundary Street Engineering Phasing
  1. A particular slide catching your eye?