BDC Leed Commissioning Presentation

1,478 views
1,426 views

Published on

A Brief description of the Commisssioning Process and how it applies to LEDD.

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,478
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
40
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

BDC Leed Commissioning Presentation

  1. 1. <ul><ul><ul><ul><ul><li>LEED ® -NC Commissioning </li></ul></ul></ul></ul></ul><ul><li>How Does the Cx Provider Impact the Success of a Sustainable Building? </li></ul><ul><li>PRESENTED BY </li></ul><ul><li>BDC ENGINEERING, LLC </li></ul>
  2. 2. <ul><ul><ul><ul><ul><li>YOUR SPEAKER TODAY </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Gregory Fitzpatrick, CxA </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Director of Engineering and Technical Services </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>BDC Engineering </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>[email_address] </li></ul></ul></ul></ul></ul>
  3. 3. <ul><ul><ul><ul><ul><li>OUTLINE </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>WHAT IS COMMISSSIONING? </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>IS THERE A NEED FOR COMMISSIONING? </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>VALUE OF COMMISSIONING </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>COMMISSSIONING SCOPE- NEW CONSTRUCTION </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>COMMISSSIONING AND LEED </li></ul></ul></ul></ul></ul>
  4. 4. <ul><ul><ul><ul><ul><li>WHAT IS COMMISSIONING? </li></ul></ul></ul></ul></ul>
  5. 5. <ul><ul><ul><ul><ul><li>COMMISSIONING IS A QUALITY ASSURANCE PROCESS </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>A coordination process that optimizes building performance (occupant comfort, reliability, energy efficiency) </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Articulating/verifying energy-related design intent </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Construction observation and warranty enforcement </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Controlling first cost </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Training the owners operational staff </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Enhancing safety and risk management </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Creating more cohesion among team members </li></ul></ul></ul></ul></ul>
  6. 6. <ul><ul><ul><ul><ul><li>IS THERE A NEED FOR COMMISSIONING? </li></ul></ul></ul></ul></ul>
  7. 7. <ul><ul><ul><ul><ul><li>ABSOLUTELY </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>All buildings are “ Complex Machines and the mechanical systems in particular serve as the heart” </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Many problems are hidden by a energy-wasting process (e.g., a stuck economizer is compensated for by extended chiller operation) </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>The process of designing, building, documenting, and </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>operating buildings has become increasingly fragmented </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Design and operation often is done without regard to </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>system interactions [moisture problems as evidence] </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Energy Efficient technologies tend to be more </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>sophisticated (error prone?) than traditional techniques </li></ul></ul></ul></ul></ul>
  8. 8. <ul><ul><ul><ul><ul><li>VALUE PROPOSITION </li></ul></ul></ul></ul></ul>
  9. 9. <ul><ul><ul><ul><ul><li>For Building Owners/Occupants </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>• Comfort/productivity; continuous occupancy </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>• Warranty enforcement </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>• Reduced construction time </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>• Occupant/tenant satisfaction </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>• Longer equipment life </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>• Reduced maintenance and life-cycle costs </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>For Trades </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>• Improved information flow among team members </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>• Reduced call-backs or change orders </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>• Increased likelihood of client satisfaction </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>For CEO, CFO, COO….. </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>• Program success: e.g. customer acceptance </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>• Meeting and maintaining targeted savings </li></ul></ul></ul></ul></ul>
  10. 10. <ul><ul><ul><ul><ul><li>COMMISSIONING SCOPE- NEW CONSTRUCTION </li></ul></ul></ul></ul></ul>
  11. 11. <ul><ul><ul><ul><ul><li>SCOPE </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Develop design intent documents </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Specifications </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Commissioning Plan Development </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Design review </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Review submittals </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Construction observation </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Verification checks </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Functional testing </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Issue resolution </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Training </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Review O&M manuals </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Commissioning Record Book and Report </li></ul></ul></ul></ul></ul>
  12. 12. <ul><ul><ul><ul><ul><li>COMMISSIONING AND LEED ® </li></ul></ul></ul></ul></ul>
  13. 13. <ul><ul><ul><ul><ul><li>LEED: ENERGY AND ATMOSPHERE </li></ul></ul></ul></ul></ul><ul><ul><ul><ul><ul><li>Prerequisite 1-Fundamental Systems Cx </li></ul></ul></ul></ul></ul><ul><li> Designate a third party Cx Authority </li></ul><ul><li> Document Owners Project Requirements and develop BOD </li></ul><ul><li> Incorporate Cx requirements into Construction Documents </li></ul><ul><li> Develop and implement Cx plan </li></ul><ul><li> Verify the installation & performance of the Commissioned systems </li></ul><ul><li> Complete a summary of the Cx Report (Cx Record Book) </li></ul>
  14. 14. <ul><ul><ul><ul><ul><li>CERTIFICATION SUBMITTALS </li></ul></ul></ul></ul></ul>
  15. 15. <ul><ul><ul><ul><ul><li>LEED LETTER TEMPLATE </li></ul></ul></ul></ul></ul><ul><ul><li>Completed Owners Project Requirements and Basis of Design </li></ul></ul><ul><ul><li>Incorporated Cx into specifications </li></ul></ul><ul><ul><li>Cx plan </li></ul></ul><ul><ul><li>Verified installation and performance of systems </li></ul></ul><ul><ul><li>Completed Cx Report </li></ul></ul>
  16. 16. <ul><ul><ul><ul><ul><li>QUESTIONS AND COMMENTS </li></ul></ul></ul></ul></ul>
  17. 17. <ul><ul><ul><ul><ul><li>THANK YOU </li></ul></ul></ul></ul></ul>

×