Your SlideShare is downloading. ×
0
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

172

Published on

Published in: Economy & Finance
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
172
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. 1 Implementation Agency of the Capital city Mayor DEPARTMENT OF ROADS
  • 2. CAPITAL CITY ULAANBAATAR IS THE HOME OF 1.3 MILLION POPULATION WHICH IS 43.7 PERCENT OF NATIONAL POPULATION AND 321200 UNITS OF VEHICLES OR 54.1 PERCENT OF TOTAL REGISTERED VEHICLE FLEET OF THE COUNTRY ARE PARTICIPATING IN CITY’S DAILY TRAFFIC. Implementation Agency of the Capital city Mayor DEPARTMENT OF ROADS
  • 3. TOTAL LENGTH OF THE PAVED ROAD OF MONGOLIA IS 4771 KM,OUT OF WHICH 657.67 KM OF ROADS BEEN USED IN ULAANBAATAR CITY. IN THE COUNTRY WE HAVE 12.335 L/ METER CONCRETE BRIDGES, OUT OF WHICH ULAANBAATAR CITY HAS 3.606.6 L/METER BRIDGES. Implementation Agency of the Capital city Mayor DEPARTMENT OF ROADS
  • 4. Ulaanbaatar city has 321.200 units of vehicles. Out of which 170.000 are participating in the city’s daily traffic and the city inbound traffic from the country side reach average 9000 units of vehicles daily. Implementation Agency of the Capital city Mayor DEPARTMENT OF ROADS
  • 5. ONE. Brief information on the projects and measures implemented in the road sector of Ulaanbaatar city in 2013 TWO. Projects and measures to be implemented in the road sector of Ulaanbaatar in 2014
  • 6. One. 6 Brief information on the projects and measures implemented in the road sector of Ulaanbaatar city in 2013 Total of 88 projects and measures are implemented, with budgeted cost of 221.8 billion tugrugs, and 145.5 км road and 368.7 l/мeter bridges are constructed. Implementation Agency of the Capital city Mayor DEPARTMENT OF ROADS
  • 7. Rehabilitation of 3.6 km road and extension of 1.2 km further in Zuun salaa of Songino Khairkhan district Client Ulaanbaatar Department of roads Contractor “ОDND” LLC Width of the roadway 7 меter Base layer 4 см Surface layer 3 см Other parameters Has street lighting and pedestrian walkways.
  • 8. Rehabilitation and widening of 2.8 км paved road from Dorj street, Tuul Jinpan intersection to east to Tsaiz market Client Ulaanbaatar Department of roads Contractor “Bering” LLC Width of the roadway 19.8 мeter Base layer 5 см Surface layer 4 см Other parameters Has street lighting and pedestrian walkways and drainage system
  • 9. Rehabilitation and widening of 1.6 км paved road from east south intersection of School #39 to Khuchit shonkhor market bus terminal Client Ulaanbaatar Department of roads Contractor “Batcubic” LLC Width of the roadway 7 меter Base layer 4 см Surface layer 3 см Other parameters Has street lighting and pedestrian walkways and drainage system
  • 10. Rehabilitation of 1.7 км paved road from Bayanburd roundabout in Chingeltei district to 32nd Roundabout Client Ulaanbaatar Department of roads Contractor “Naranbulag Khan” LLC Width of the roadway 7 меter Base layer 4 см Surface layer 3 см Other parameters Has street lighting and pedestrian walkways and drainage system
  • 11. Construction of 0.2 км road and railway tunnel connecting Narnii road of Bayanzurkh district with Bayanmongol khoroolol Client Ulaanbaatar Department of roads Contractor “Tuuliin guur dalai” LLC Width of the roadway 9 меter Base layer 4 см Surface layer 3 см Other parameters Has street lighting and drainage system
  • 12. Rehabilitation of Selbe twin bridge 58х2 l/мeter Client Ulaanbaatar Department of roads Contractor “Мотоr service” LLC Width of the roadway 24 меter Other parameters Has street lighting and pedestrian walkways
  • 13. Rehabilitation of 4.5 км paved road from East intersection-Officer’s palace- Chuluun ovoo to Trolleybus terminal Client Ulaanbaatar Department of roads Contractor “Yalguusan” LLC Width of the roadway 21 меter Base layer 4 см Surface layer 3 см Other parameters Has street lighting and pedestrian walkways and drainage system
  • 14. Rehabilitation and widening of 3.2 км paved road from Sapporo roundabout – Moscow street- Trade union street to 5 shar Client Ulaanbaatar Department of roads Contractor “Тоtal inj” LLC Width of the roadway 23 меter Base layer 4 см Surface layer 3 см Other parameters Has street lighting and pedestrian walkways and drainage system
  • 15. Rehabilitation and widening of 3.4 км paved road from Trade union street to Bayankhoshuu Client Ulaanbaatar Department of roads Contractor “Huvai Mongolia” LLC Width of the roadway 14 меter Base layer 4 см Surface layer 3 см Other parameters Has street lighting and pedestrian walkways and drainage system
  • 16. Rehabilitation of 4.1 км paved road from Dund river – Trade union street and 19th Micro district Client Ulaanbaatar Department of roads Contractor “CFC group” LLC Width of the roadway 14 меter Base layer 5 см Surface layer 4 см Other parameters Has street lighting and pedestrian walkways and drainage system
  • 17. In 2014: Roads to be rehabilitated – 54.9 км Roads to be newly constructed – 40.4 км Bridge repair, rehabilitation – 243.2 l/мeter Surface drainage system – 9 locations Underground tunnel for Vehicle traffic – 1 Flyover bridge for pedestrians – 2 Natural stone road – 1.84 км and total budgeted cost is 74 billion 130 million tugrugs. Implementation Agency of the Capital city Mayor DEPARTMENT OF ROADS
  • 18. НИЙСЛЭЛИЙН АВТО ЗАМЫН ГАЗАР Implementation Agency of the Capital city Mayor DEPARTMENT OF ROADS
  • 19. Rehabilitation and widening of 13.7 km paved road from Yarmag bridge –Nisekh – Nisekh tollgate- Sonsgolon intersection to Yarmag tollgate Contractor “HKB International Holding” LLC Work progress 65% Note: The drainage and base course works done. As it listed in the projects that funding is “freezed” the implementation period is unknown so far.
  • 20. Rehabilitation and widening of 22.5 км paved road from Nisekh tollgate- Biocombinat to Shuvuun Fabric /with 99.2 l/мeter bridge/ Contractor “Тоtal Inj” LLC Work progress 75% Note: Base layer is done. Out of 30.5 billion tugrug total budget 2 billion is allocated in 2012, 15 billion is allocated in 2013, and 13.5 billion is budgeted for the year 2014. Depending on the funding the work couldn’t be executed on its intended commissioning date.
  • 21. Construction of 4.5 км paved road in Selkhe summer housing area Contractor “PCF” LLC Implementation period 2014.06.15 Work progress 68% Note: The embankment work is done and pavement for 1.8 km section is done. The pavement work on the remaining section will be done and also the pedestrian walkway and street lighting will be installed.
  • 22. Construction of 6.0 км paved road as the continuation of the horisontal arterial road south of the railway line /from Dunjingarav trading center to Uliastay intersection/ Contractor “Khansuun zam” LLC Implementation period 2014.10.15 Work progress 10% Note: The drinking water reserve fence which is under the road right of way is not possible to be relocated.
  • 23. 10. Construction of the pedestrian flyover near the Central stadium in Khan-uul district’s 8th khoroo Contractor “MBAS" LLC, “Giatsint” LLC partnership Implementation period 2014.05.20 Work progress 5% 11. Construction of the pedestrian flyover near the 100 ail construction market in Sukhbaatar district’s 10th khoroo Contractor “ZMZ” LLC Implementation period 2014.05.20 Work progress 5%
  • 24. 12. Construction of 17.6 км paved road from Bayanzurkh toll gate to Yarmag Bridge alongside the North of Bogd Mountain Contractor “ЭСТО” ХХК Implementation period 2014.08.01 Work progress 60% Тайлбар: Замын трасст орсон 23 объектыг нэн даруй чөлөөлөх шаардлагатай. Улсын баяр наадмаас өмнө ашиглалтад өгөхөөр зорьж байна.
  • 25. 14. Rehabilitation and widening of Beijing street to be implemented under the PRC Government grant funding /0.9 км, 74 l/meter bridge/ Contractor “Beijing Construction engineering Group” LLC Implementation period 2014.11.30 Work progress Work just has began.
  • 26. НИЙСЛЭЛИЙН АВТО ЗАМЫН ГАЗАР Implementation Agency of the Capital city Mayor DEPARTMENT OF ROADS
  • 27. № Name of the project and measures, location and capacity Comment 1 Rehabilitation of 1.3 км of paved road from Petrovis Gasoline station to Tsaiz market intersection in Nalaikh district The open tender selection process is ongoing. 2 Construction of 0.5 km of paved road and underground tunnel from Narnii road to Ikh Mongol empire road connecting under the railway Detailed designing is ongoing. 3 Rehabilitation of 2.5 km road and construction of 3.1 km paved roads in Sharga Morit Valley Detailed designing is ongoing. 4 Rehabilitation and widening of 0.54 km paved road from Sukhbaatar district, 1st Khoroo, Choidog Street, Central library to Central Hospital #1 The open tender selection process is ongoing. НИЙСЛЭЛИЙН АВТО ЗАМЫН ГАЗАР
  • 28. № Name of the project and measures, location and capacity Comment 5 Rehabilitation and widening of 4.6 km paved road from Khuvisgalchis street, Zuragt’s new bus terminal to Bayankhoshuu intersection The open tender selection process is ongoing. 6 Rehabiliatation of 0.5 km paved road of Sansar Tunnel Detailed designing is ongoing. 7 Construction of 1.2 km paved road from Bayanzurkh district, 22nd khoroo, Monel to Zuun Altan-ulgii The open tender selection process is ongoing. 8 Construction of 0.5 km approach road at Temporary bridge next to the Yarmag existing bridge The open tender selection process is ongoing. НИЙСЛЭЛИЙН АВТО ЗАМЫН ГАЗАР
  • 29. № Name of the project and measures, location and capacity Comment 9 Construction of rain water drainage system in Chingeltei district, 1st khoroo, Juulchin street, Gutal 22 nd outlet and Jigjidjav street surroundings The open tender selection process is ongoing. 10 Construction of rain water drainage system in Bayangol district, 3rd khoroo, Railway police department, Gan zam hotel and its surroundings The open tender selection process is ongoing. 11 Construction of rain water drainage system in Bayanzurkh district, 13 th Microdistrict, Building 21 nad its surroundings The open tender selection process is ongoing. 12 Construction of rain water drainage system in Chingeltei district, 5th and 6th khoroos and their surroundings The open tender selection process is ongoing. НИЙСЛЭЛИЙН АВТО ЗАМЫН ГАЗАР
  • 30. № Name of the project and measures, location and capacity Comment 13 Construction of rain water drainage system for 2.3 km of road from Amgalan- Botanic Trollyebus terminal to Uliastay river Bridge The open tender selection process is ongoing. 14 Construction of new rain water drainage system in Gandi Street and reinforcing the pavement /From Dunjingarav intersection to Chinggis Avenue/ The open tender selection process is ongoing. 15 Construction of district rain water drainage system in XIX microdistrict, 120 Myangat, Khan-uul district The open tender selection process is ongoing. НИЙСЛЭЛИЙН АВТО ЗАМЫН ГАЗАР

×