• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Public Presentation VI: Greening DeKalb
 

Public Presentation VI: Greening DeKalb

on

  • 1,165 views

 

Statistics

Views

Total Views
1,165
Views on SlideShare
840
Embed Views
325

Actions

Likes
0
Downloads
0
Comments
0

7 Embeds 325

http://www.briarcliffnorthdruidhills.org 204
http://briarcliffnorthdruidhills.org 98
http://www.briarcliffnorthdruidhills.org. 12
http://briarcliffnorthdruidhills.com 5
http://www.briarcliffnorthdruidhills.com 3
http://www.slideshare.net 2
http://www.mac.com 1
More...

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Public Presentation VI: Greening DeKalb Public Presentation VI: Greening DeKalb Presentation Transcript

    • GREENING DEKALB
    • Existing Park Existing Kittredge Park
    • Plan of Park + Boulevard X Park Extensions and Connections
    • Existing Pedestrian Network Existing Pedestrian Network
    • Proposed Pedestrian + Bicycle Network Proposed Vehicular, Pedestrian, and Bicycle Network
    • Plan of Regional Bus Route Map Proposed Bus Network
    • I-85 Improvements Proposed I – 85 Improvements
    • Curb Cuts North Druid Hills Rd Curb Cuts
    • Rendering of BLVD at grade before North Druid Hills Rd: Existing
    • Rendering of BLVD at grade after North Druid Hills Rd: Proposed
    • Impervious Surfaces Map Impervious Surfaces
    • Target Aerial Before Existing Target Parking Lot
    • Target Aerial After Improved Design and Performance Standards
    • Evolution Since July
    • Park Extension into Executive Park - Before Kittredge Park: Existing
    • Park Extension into Executive Park - After Proposed Kittredge Park Extensions
    • Rendering of the Stream at Executive Park Before Existing Stream
    • Rendering of the Stream at Executive Park After Proposed Parkland
    • Renderings from Executive Park
    • Rendering from Sembler
    • Enhanced I-85 Intersections: 1 Existing Conditions: I - 85 Access
    • Enhanced I-85 Intersections: 2 Improved I - 85 Access
    • Enhanced I-85 Intersections: 3 Improved I - 85 Access
    • Enhanced I-85 Intersections: 4 Improved I - 85 Access and Site Circulation New Traffic Lights
    • BLVD Plan (keep?)BLVD Section (keep?) Proposed Boulevard: Plan
    • Boulevard Perspective Perspective Drawing of Proposed Boulevard and Service Lanes
    • Boulevard Illustrations: Tree Locations Proposed Boulevard: Plan
    • Boulevard Illustrations: left turn Roundabout vs. Typical Intersection
    • Intersection Roundabout Proposed Roundabout
    • Intersection Underpass and Roundabout Proposed Roundabout with Underpass
    • Roundabout Aerial Image Before Intersection of North Druid Hills and Briarcliff Rds
    • Roundabout Aerial Rendering After w/ underpass Roundabout Intersection at North Druid Hills and Briarcliff Rds
    • Roundabout Rendering: Before Intersection of North Druid Hills and Briarcliff Rds
    • Roundabout Rendering: After Roundabout Intersection at North Druid Hills and Briarcliff Rds
    • Plan of Regional Bus Route Map Proposed Bus Network
    • Bus Map: Regional
    • Bus Map: Regional and Local
    • Bus Stop Plan Perspective Drawing of Bus Turn-Off
    • Final Protection for 1-family house development 1 Protection for Single Family Residences
    • Final Protection for 1-family house development 2 Protection for Single Family Residences
    • Final Protection for 1-family house development 3 Protection for Single Family Residences
    • Final Protection for 1-family house development 4 Protection for Single Family Residences
    • Tower coverage 8% Maximum 8% coverage by tall buildings
    • Sembler edges Protection for Single Family Residences
    • Parking Standards - Before Existing Parking Lot
    • Parking Standards - After Rendering of Proposed Parking Lot Regulations
    • Estimated Public Realm Improvement Costs TAD Improvement Costs • Kittredge Park Improvements: $10 – $20 million • New Parkland: $15 – $20 million • Burying Utility Lines: $15 - $25 million • Boulevards: $50 – $60 million • Street, Pedestrian, Bike Network: $40 – $50 million • I-85 Access Improvements: $5 – $10 million Total Costs: $135 – $185 million + allocation for affordable and workforce housing
    • How TADs Work TAD Explain Tax Allocation District (TAD)
    • Community Improvement District (CID) • Participating property owners agree to voluntary surcharge on property taxes • Funds raised through surcharge are used to pay for operating and maintenance costs
    • Existing Conditions Existing Conditions
    • Phase III Northern Quadrants Street Network: Proposed
    • Greening 2 Greening DeKalb
    • Final Rendering Before Current Intersection of Briarcliff and Sheridan Rds
    • Final Rendering After Future Intersection of Briarcliff and Sheridan Rds