THE NEW PUBLIC REALM
Kittredge Park Today




Kittredge Park Today
Park Sequence - Plan of Existing
             Kittredge Park




Existing Kittredge Park
Plan of Park + conservation areas




Native and Unique Habitat
Plan of Park + extensions,
     preservation of existing mature
     vegetation (stream buffers, etc.)




An Enhanced and...
Lake Rendering
After Lake Rendering
Before park Rendering
Rendering 1 – New Kittredge Park
Section of Park St




Proposed Park Drive: Section
Zoning – Park Drive
Rendering 6 – Park Dr
Plan of Park + new, flexible open
                  space




Park Connections
Curb Cuts




North Druid Hills Rd Curb Cuts
Section of N Druid Hills/Briarcliff




Proposed Boulevard: Section
Plan of N. Druid hills/Briarcliff




Proposed Boulevard: Plan
Zoning – Boulevard
Rendering of BLVD at grade before
Rendering of BLVD at grade after
Section of Commercial St




Proposed Retail Street Street: Section
 Proposed Commercial
Rendering of Retail St
Section of Residential St




Proposed Residential Street: Section
Rendering of Residential Street
Existing Road Network




Existing Road Network
I-85 Interchange




Existing I – 85 Interchange
I-85 Improvements




Proposed I – 85 Improvements
Phase 1




Phase 1: Proposed Road Network
Phase 2




Phase 2: Proposed Road Network
Phase 3




Phase 3: Proposed Road Network
Composite Plan




Proposed Road Network
Existing Sidewalks




Existing Sidewalks
Proposed Sidewalks




Proposed Sidewalks
Before and after - continuous bike
                network




Existing Bike Lanes
Proposed Bike Lanes




Proposed Bike Lanes
Plan of Regional Bus Route Map




  Proposed Bus Network
Parking Standards - Before
Parking Standards - After
Zoning – Private Property
TAD Explain




Tax Allocation District (TAD)
Tax Allocation District (TAD)
Potential Capital Expenditures

 •Property acquisition
 •New streets
 •Sidewalks
 •Bike lane...
Community Improvement District
            (CID)

• Participating property owners agree to voluntary
  surcharge on proper...
New Kittredge Park
Upcoming SlideShare
Loading in …5
×

Public Presentation V: Draft Master Plan

620 views
558 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
620
On SlideShare
0
From Embeds
0
Number of Embeds
32
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Public Presentation V: Draft Master Plan

  1. 1. THE NEW PUBLIC REALM
  2. 2. Kittredge Park Today Kittredge Park Today
  3. 3. Park Sequence - Plan of Existing Kittredge Park Existing Kittredge Park
  4. 4. Plan of Park + conservation areas Native and Unique Habitat
  5. 5. Plan of Park + extensions, preservation of existing mature vegetation (stream buffers, etc.) An Enhanced and Accessible Park
  6. 6. Lake Rendering
  7. 7. After Lake Rendering
  8. 8. Before park Rendering
  9. 9. Rendering 1 – New Kittredge Park
  10. 10. Section of Park St Proposed Park Drive: Section
  11. 11. Zoning – Park Drive
  12. 12. Rendering 6 – Park Dr
  13. 13. Plan of Park + new, flexible open space Park Connections
  14. 14. Curb Cuts North Druid Hills Rd Curb Cuts
  15. 15. Section of N Druid Hills/Briarcliff Proposed Boulevard: Section
  16. 16. Plan of N. Druid hills/Briarcliff Proposed Boulevard: Plan
  17. 17. Zoning – Boulevard
  18. 18. Rendering of BLVD at grade before
  19. 19. Rendering of BLVD at grade after
  20. 20. Section of Commercial St Proposed Retail Street Street: Section Proposed Commercial
  21. 21. Rendering of Retail St
  22. 22. Section of Residential St Proposed Residential Street: Section
  23. 23. Rendering of Residential Street
  24. 24. Existing Road Network Existing Road Network
  25. 25. I-85 Interchange Existing I – 85 Interchange
  26. 26. I-85 Improvements Proposed I – 85 Improvements
  27. 27. Phase 1 Phase 1: Proposed Road Network
  28. 28. Phase 2 Phase 2: Proposed Road Network
  29. 29. Phase 3 Phase 3: Proposed Road Network
  30. 30. Composite Plan Proposed Road Network
  31. 31. Existing Sidewalks Existing Sidewalks
  32. 32. Proposed Sidewalks Proposed Sidewalks
  33. 33. Before and after - continuous bike network Existing Bike Lanes
  34. 34. Proposed Bike Lanes Proposed Bike Lanes
  35. 35. Plan of Regional Bus Route Map Proposed Bus Network
  36. 36. Parking Standards - Before
  37. 37. Parking Standards - After
  38. 38. Zoning – Private Property
  39. 39. TAD Explain Tax Allocation District (TAD)
  40. 40. Tax Allocation District (TAD) Potential Capital Expenditures •Property acquisition •New streets •Sidewalks •Bike lanes •Tree planting •Stormwater capture •Boulevards •Renovations to Kittredge Park and the stream •Buried utility lines •New highway exit lane
  41. 41. Community Improvement District (CID) • Participating property owners agree to voluntary surcharge on property taxes • Funds raised through surcharge are used to pay for operating and maintenance costs
  42. 42. New Kittredge Park

×