2
Location
Extensive EASA-Certified MRO
support as close as your backyard
3
Certificates and approvals
EASA Part-145
Russian Federation Approval for EASA Part 145 activities
Bermuda Department of ...
4 Narrow Body Aircraft
Hangar Capacities
2 Wide Body Aircraft
1st Line – January, 2014
2nd Line – February, 2014
3rd Line ...
Hangar Capacities
Areas directly linked with Part 145 facility
First floor
No of Room Purpose of the room Size in sq.m
Air...
Hangar Capacities
Areas directly linked with Part 145 facility
Second Floor
No of Room Purpose of the room Size in sq.m
2....
Hangar Capacities
Areas directly linked with Part 145 facility
Third Floor
No of Room Purpose of the room Size in sq.m
3.1...
Hangar Capacities
Customer Zone
Third Floor
No of Room Purpose of the room Size in sq.m
3.13 Administration and passage 27...
MRO Capabilities
• Airbus A320 Family
• Boeing 737 CL/NG
• A-to-D Check
• Technical Defect Rectification
• Interior Refurb...
10
11
12
13
Key People
Martynas Grigalavičius
Head of Base Maintenance Dep.
(Kaunas)
Tel: +370 5 252 5015
Mob: +370 657 251 65
Email:
...
FL Technics Kaunas Hangar Presentation for Clients
FL Technics Kaunas Hangar Presentation for Clients
Upcoming SlideShare
Loading in …5
×

FL Technics Kaunas Hangar Presentation for Clients

510
-1

Published on

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
510
On Slideshare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
10
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • Bus sutrumpintas pristatymas apie Part M reglamenta, zr. File: Aviation Legislation Issue 5 2013 Jan 28
  • FL Technics Kaunas Hangar Presentation for Clients

    1. 1. 2 Location Extensive EASA-Certified MRO support as close as your backyard
    2. 2. 3 Certificates and approvals EASA Part-145 Russian Federation Approval for EASA Part 145 activities Bermuda Department of Civil Aviation Approval
    3. 3. 4 Narrow Body Aircraft Hangar Capacities 2 Wide Body Aircraft 1st Line – January, 2014 2nd Line – February, 2014 3rd Line – September 2014, 4th Line – January, 2015 Launch of production lines: or
    4. 4. Hangar Capacities Areas directly linked with Part 145 facility First floor No of Room Purpose of the room Size in sq.m Aircraft maintenance room 7200,00 1.1 Incoming inspection 45,00 1.2 Standard and consumable parts store, store of aircrafts components 165,00 1.3 Store of unserviceable equipment 45,00 1.4 Tool store 45,00 1.6 Technical room. AC power 22,60 1.7 Technical compressed air room 22,60 1.9 Composite repair room No.: 1 37,80 1.10 Composite repair room No.: 2 47,00 1.11 Component cleaning area 28,00 1.12 Component sandblasting and heat treatment shop 42,00 1.15 Preparation for paint area 40,00 1.16 Paint removal with chemicals room 5,50 1.17 Painting/drying booth 28,00 1.18 Structure shop No.: 1 45,00 1.19 Structure shop No.: 2 30,00 1.20 Aluminum alloy sheets and profiles store 15,00 Total: 7863,50
    5. 5. Hangar Capacities Areas directly linked with Part 145 facility Second Floor No of Room Purpose of the room Size in sq.m 2.4 Maintenance support unit 30,00 2.5 Start runners room 30,00 2.6 Shift leaders and meeting room 60,00 2.7 Workshops office 30,00 2.8 Meeting/training room “Y” Yankee 75,00 2.9 Meeting/training room “L” Lima 30,00 2.11 Human resource office 60,00 2.12 Head of base maintenance office 15,00 2.13 Production officer office 15,00 2.14 Quality department 15,00 2.15 Work room 15,00 Total: 375,00
    6. 6. Hangar Capacities Areas directly linked with Part 145 facility Third Floor No of Room Purpose of the room Size in sq.m 3.1 Dress room No.: 1 75,00 3.6 Dress room No.: 2 75,00 3.7 Dress room No.: 3 60,00 3.12 Dress room No.: 4 60,00 Total: 270,00 Total area for PART 145 tasks, sq. m.: 8508,50
    7. 7. Hangar Capacities Customer Zone Third Floor No of Room Purpose of the room Size in sq.m 3.13 Administration and passage 27,50 3.14 Working room No.: 1 11,25 3.15 Working room No.: 2 11,25 3.16 Working room No.: 3 11,25 3.17 Working room No. : 4 11,25 3.18 Working room No.: 5 11,25 3.19 Rest room 60,00 3.20 Toilet 11,25 3.21 Smoking room 11,25 3.22 Passage 7,50 Total: 173,75 Total area sq. m.: 8903,85
    8. 8. MRO Capabilities • Airbus A320 Family • Boeing 737 CL/NG • A-to-D Check • Technical Defect Rectification • Interior Refurbishment • Exterior Aircraft Cleaning • Routine Maintenance • Flight Hours Inspection • Avionics and Airframe Modification • Structure Inspection, CPCP • Structure Repairs • Composite Repairs • NDT Level 3 • Engine Replacement • Landing Gear Replacement • Painting (up to 9 m long components) Aircraft Types: Services
    9. 9. 10
    10. 10. 11
    11. 11. 12
    12. 12. 13
    13. 13. Key People Martynas Grigalavičius Head of Base Maintenance Dep. (Kaunas) Tel: +370 5 252 5015 Mob: +370 657 251 65 Email: martynas.grigalavicius@fltechnics.com Jurijus Petruninas Head of Base Maintenance Unit (Kaunas) Tel: +370 5 252 5015 Mob: +370 698 39663 Email: jurijus.petruninas@fltechnics.com
    1. Gostou de algum slide específico?

      Recortar slides é uma maneira fácil de colecionar informações para acessar mais tarde.

    ×