Status Report1

171
-1

Published on

Status Report 1

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
171
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Status Report1

  1. 1. Drinks Unlimited, LLC<br />AVD&FDS<br />Automated Volume Detection<br />& FluidDispensing System.<br />Status Report #1<br />Design Team #2<br />Frederick Weissbach<br />Brendan Baker<br />Sean Tovar<br />EE 4813 – Electrical Engineering Design II<br />20 January, 2010<br />
  2. 2. OverallNeed& Milestones<br />Our product will help disperse lines and increase productivity while also helping with sanitation at public beverage dispensing locations.<br />Milestones – <br /><ul><li> Finalized Design - 03 Frebruary, 2010
  3. 3. Receive Ordered Parts – 21 February, 2010
  4. 4. Working Code – 22 March, 2010
  5. 5. Functional Prototype – 13 April, 2010</li></li></ul><li>RecentTasks<br /><ul><li>CompletedTasks -
  6. 6. InterfacingDecisions
  7. 7. Decided On Parts</li></li></ul><li>Ongoing/PendingTasks<br /><ul><li>Locating Parts
  8. 8. Ordering Parts
  9. 9. Hardware Interfacing</li></ul>Pending Tasks -<br />
  10. 10. UpcomingTasks<br />Approaching Tasks -<br />Code Development<br />Hardware Interfacing<br />GUI<br />Hardware Integration<br />
  11. 11. Block DiagramPercentages<br />
  12. 12. Schedule Percentages<br />

×