Cost Estimate Classification System – As Applied in Engineering
Procurement, and Construction for the Process Industries

                                                                                                           June 15, 1998
ESTIMATE INPUT CHECKLIST AND MATURITY MATRIX

    Figure 4 maps the extent and maturity of estimate input information (deliverables) against the five
estimate classification levels. This is a checklist of basic deliverables found in common practice in the
process industries. The maturity level is an approximation of the degree of completion of the deliverable.
The degree of completion is indicated by the following letters.

•    None (blank): development of the deliverable has not begun.
•    Started (S): work on the deliverable has begun. Development is typically limited to sketches, rough
     outlines, or similar levels of early completion.
•    Preliminary (P): work on the deliverable is advanced. Interim, cross-functional reviews have usually
     been conducted. Development may be near completion except for final reviews and approvals.
•    Complete (C): the deliverable has been reviewed and approved as appropriate.


                                                                ESTIMATE CLASSIFICATION
                                                     CLASS 5    CLASS 4        CLASS 3       CLASS 2 CLASS 1
              General Project Data:
Project Scope Description                            General   Preliminary      Defined       Defined Defined
Plant Production/Facility Capacity                   Assumed   Preliminary      Defined       Defined Defined
Plant Location                                       General   Approximate     Specific      Specific Specific
Soils & Hydrology                                     None     Preliminary      Defined       Defined Defined
Integrated Project Plan                               None     Preliminary      Defined       Defined Defined
Project Master Schedule                               None     Preliminary      Defined       Defined Defined
Escalation Strategy                                   None     Preliminary      Defined       Defined Defined
Work Breakdown Structure                              None     Preliminary      Defined       Defined Defined
Project Code of Accounts                              None     Preliminary      Defined       Defined Defined
Contracting Strategy                                 Assumed    Assumed       Preliminary     Defined Defined
           Engineering Deliverables:
Block Flow Diagrams                                    S/P        P/C              C             C           C
Plot Plans                                                         S              P/C            C           C
Process Flow Diagrams (PFDs)                                      S/P             P/C            C           C
Utility Flow Diagrams (UFDs)                                      S/P             P/C            C           C
Piping & Instrument Diagrams (P&IDs)                               S              P/C            C           C
Heat & Material Balances                                           S              P/C            C           C
Process Equipment List                                            S/P             P/C            C           C
Utility Equipment List                                            S/P             P/C            C           C
Electrical One-Line Drawings                                      S/P             P/C            C           C
Specifications & Datasheets                                        S              P/C            C           C
General Equipment Arrangement Drawings                             S              P/C            C           C
Spare Parts Listings                                                              S/P            P           C
Mechanical Discipline Drawings                                                     S             P          P/C
Electrical Discipline Drawings                                                     S             P          P/C
Instrumentation/Control System Discipline Drawings                                 S             P          P/C
Civil/Structural/Site Discipline Drawings                                          S             P          P/C

Figure 4. – Estimate Input Checklist and Maturity Matrix


REFERENCES

ANSI Standard Z94.2-1989. Industrial Engineering Terminology: Cost Engineering.
AACE International Recommended Practice No.17R-97, Cost Estimate Classification System.




Copyright 2000 AACE, Inc.                                               AACE International Recommended Practices and Standards

More Related Content

What's hot

Primavera Activity ID Coding
Primavera Activity ID CodingPrimavera Activity ID Coding
Primavera Activity ID Codingignitetribes
 
Northrop Grumman Experience
Northrop Grumman ExperienceNorthrop Grumman Experience
Northrop Grumman ExperienceNolen Overton
 
Justin N Drude Resume 10-16
Justin N Drude Resume 10-16Justin N Drude Resume 10-16
Justin N Drude Resume 10-16Justin Drude
 

What's hot (6)

RESUME ORIG
RESUME ORIGRESUME ORIG
RESUME ORIG
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
Primavera Activity ID Coding
Primavera Activity ID CodingPrimavera Activity ID Coding
Primavera Activity ID Coding
 
Northrop Grumman Experience
Northrop Grumman ExperienceNorthrop Grumman Experience
Northrop Grumman Experience
 
H pimm resume
H pimm resumeH pimm resume
H pimm resume
 
Justin N Drude Resume 10-16
Justin N Drude Resume 10-16Justin N Drude Resume 10-16
Justin N Drude Resume 10-16
 

Similar to Cost Estimate Classification Matrix

Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale
 
Fox plant engineering services (pes) brochure
Fox plant engineering services (pes) brochureFox plant engineering services (pes) brochure
Fox plant engineering services (pes) brochureRami Reddy
 
Moses -resume
Moses -resumeMoses -resume
Moses -resumemoses raj
 
Walley.tina
Walley.tinaWalley.tina
Walley.tinaNASAPMC
 
Instrumentation Design Engineer
Instrumentation Design Engineer Instrumentation Design Engineer
Instrumentation Design Engineer Parth Tailor
 
MDOT ITS Design Manual
MDOT ITS Design ManualMDOT ITS Design Manual
MDOT ITS Design ManualAcey Roberts
 
Ensuring reliability in lean new product development part2of2 24
Ensuring reliability in lean new product development part2of2 24Ensuring reliability in lean new product development part2of2 24
Ensuring reliability in lean new product development part2of2 24ASQ Reliability Division
 
Aptiv’s Third Generation of 77 GHz-Based Short-Range Radar (SRR3)
 Aptiv’s Third Generation of 77 GHz-Based Short-Range Radar (SRR3) Aptiv’s Third Generation of 77 GHz-Based Short-Range Radar (SRR3)
Aptiv’s Third Generation of 77 GHz-Based Short-Range Radar (SRR3)system_plus
 
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdfPROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdfhasan752746
 
Engineering Company overview and Process Engineer's Role
Engineering Company overview and Process Engineer's RoleEngineering Company overview and Process Engineer's Role
Engineering Company overview and Process Engineer's Rolerenitanggreini
 
RESUME_Dech L(03-Feb-2015)
RESUME_Dech L(03-Feb-2015)RESUME_Dech L(03-Feb-2015)
RESUME_Dech L(03-Feb-2015)Dech Leanglum
 
Mary.zimmerman
Mary.zimmermanMary.zimmerman
Mary.zimmermanNASAPMC
 

Similar to Cost Estimate Classification Matrix (20)

vyasVP
vyasVPvyasVP
vyasVP
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
 
Fox plant engineering services (pes) brochure
Fox plant engineering services (pes) brochureFox plant engineering services (pes) brochure
Fox plant engineering services (pes) brochure
 
Moses -resume
Moses -resumeMoses -resume
Moses -resume
 
Nadim Siddique CV
Nadim Siddique CVNadim Siddique CV
Nadim Siddique CV
 
Walley.tina
Walley.tinaWalley.tina
Walley.tina
 
Instrumentation Design Engineer
Instrumentation Design Engineer Instrumentation Design Engineer
Instrumentation Design Engineer
 
MDOT ITS Design Manual
MDOT ITS Design ManualMDOT ITS Design Manual
MDOT ITS Design Manual
 
Ensuring reliability in lean new product development part2of2 24
Ensuring reliability in lean new product development part2of2 24Ensuring reliability in lean new product development part2of2 24
Ensuring reliability in lean new product development part2of2 24
 
Raju Thamke_CV
Raju Thamke_CVRaju Thamke_CV
Raju Thamke_CV
 
Resume37
Resume37Resume37
Resume37
 
Aptiv’s Third Generation of 77 GHz-Based Short-Range Radar (SRR3)
 Aptiv’s Third Generation of 77 GHz-Based Short-Range Radar (SRR3) Aptiv’s Third Generation of 77 GHz-Based Short-Range Radar (SRR3)
Aptiv’s Third Generation of 77 GHz-Based Short-Range Radar (SRR3)
 
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdfPROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
 
Imran_CV
Imran_CV Imran_CV
Imran_CV
 
DIPESH KUMAR
DIPESH KUMARDIPESH KUMAR
DIPESH KUMAR
 
Engineering Company overview and Process Engineer's Role
Engineering Company overview and Process Engineer's RoleEngineering Company overview and Process Engineer's Role
Engineering Company overview and Process Engineer's Role
 
SUNIL MANOHAR SINGH_CV
SUNIL MANOHAR SINGH_CVSUNIL MANOHAR SINGH_CV
SUNIL MANOHAR SINGH_CV
 
Ajit Singh_CV
Ajit Singh_CVAjit Singh_CV
Ajit Singh_CV
 
RESUME_Dech L(03-Feb-2015)
RESUME_Dech L(03-Feb-2015)RESUME_Dech L(03-Feb-2015)
RESUME_Dech L(03-Feb-2015)
 
Mary.zimmerman
Mary.zimmermanMary.zimmerman
Mary.zimmerman
 

More from aurita09

Proyecto II Costos
Proyecto II CostosProyecto II Costos
Proyecto II Costosaurita09
 
Proyecto II Costos
Proyecto II CostosProyecto II Costos
Proyecto II Costosaurita09
 
Proyecto II Costos
Proyecto II CostosProyecto II Costos
Proyecto II Costosaurita09
 
Proyecto II Costos
Proyecto II CostosProyecto II Costos
Proyecto II Costosaurita09
 
Proyecto II
Proyecto IIProyecto II
Proyecto IIaurita09
 
Proyecto de Sistema Financiero Teoria
Proyecto de Sistema Financiero TeoriaProyecto de Sistema Financiero Teoria
Proyecto de Sistema Financiero Teoriaaurita09
 
Presentacion Sistema Financiero
Presentacion  Sistema FinancieroPresentacion  Sistema Financiero
Presentacion Sistema Financieroaurita09
 
Trabajo Final Sistema Financiero
Trabajo Final Sistema FinancieroTrabajo Final Sistema Financiero
Trabajo Final Sistema Financieroaurita09
 
Sistema Financiero
Sistema FinancieroSistema Financiero
Sistema Financieroaurita09
 
Sistema Financiero
Sistema FinancieroSistema Financiero
Sistema Financieroaurita09
 
Sistema Financiero
Sistema FinancieroSistema Financiero
Sistema Financieroaurita09
 
Sistema Financiero
Sistema FinancieroSistema Financiero
Sistema Financieroaurita09
 
Herramientas web
Herramientas webHerramientas web
Herramientas webaurita09
 
Herramientas web
Herramientas webHerramientas web
Herramientas webaurita09
 
Sistemas De Infomacion
Sistemas De InfomacionSistemas De Infomacion
Sistemas De Infomacionaurita09
 
Sistemas De Infomacion Semana 2
Sistemas De Infomacion Semana 2Sistemas De Infomacion Semana 2
Sistemas De Infomacion Semana 2aurita09
 
Herramientas web
Herramientas webHerramientas web
Herramientas webaurita09
 
Taller De Investigacion En Internet
Taller De Investigacion En InternetTaller De Investigacion En Internet
Taller De Investigacion En Internetaurita09
 

More from aurita09 (20)

Proyecto II Costos
Proyecto II CostosProyecto II Costos
Proyecto II Costos
 
Proyecto II Costos
Proyecto II CostosProyecto II Costos
Proyecto II Costos
 
Proyecto II Costos
Proyecto II CostosProyecto II Costos
Proyecto II Costos
 
Proyecto II Costos
Proyecto II CostosProyecto II Costos
Proyecto II Costos
 
Costos
CostosCostos
Costos
 
Proyecto II
Proyecto IIProyecto II
Proyecto II
 
Proyecto de Sistema Financiero Teoria
Proyecto de Sistema Financiero TeoriaProyecto de Sistema Financiero Teoria
Proyecto de Sistema Financiero Teoria
 
Presentacion Sistema Financiero
Presentacion  Sistema FinancieroPresentacion  Sistema Financiero
Presentacion Sistema Financiero
 
Trabajo Final Sistema Financiero
Trabajo Final Sistema FinancieroTrabajo Final Sistema Financiero
Trabajo Final Sistema Financiero
 
Sistema Financiero
Sistema FinancieroSistema Financiero
Sistema Financiero
 
Sistema Financiero
Sistema FinancieroSistema Financiero
Sistema Financiero
 
Sistema Financiero
Sistema FinancieroSistema Financiero
Sistema Financiero
 
Sistema Financiero
Sistema FinancieroSistema Financiero
Sistema Financiero
 
Herramientas web
Herramientas webHerramientas web
Herramientas web
 
Herramientas web
Herramientas webHerramientas web
Herramientas web
 
Sistemas De Infomacion
Sistemas De InfomacionSistemas De Infomacion
Sistemas De Infomacion
 
Pmi
PmiPmi
Pmi
 
Sistemas De Infomacion Semana 2
Sistemas De Infomacion Semana 2Sistemas De Infomacion Semana 2
Sistemas De Infomacion Semana 2
 
Herramientas web
Herramientas webHerramientas web
Herramientas web
 
Taller De Investigacion En Internet
Taller De Investigacion En InternetTaller De Investigacion En Internet
Taller De Investigacion En Internet
 

Recently uploaded

WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAScathy664059
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Jiastral oracle
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 

Recently uploaded (20)

WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAS
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 

Cost Estimate Classification Matrix

  • 1. 8 of 8 Cost Estimate Classification System – As Applied in Engineering Procurement, and Construction for the Process Industries June 15, 1998 ESTIMATE INPUT CHECKLIST AND MATURITY MATRIX Figure 4 maps the extent and maturity of estimate input information (deliverables) against the five estimate classification levels. This is a checklist of basic deliverables found in common practice in the process industries. The maturity level is an approximation of the degree of completion of the deliverable. The degree of completion is indicated by the following letters. • None (blank): development of the deliverable has not begun. • Started (S): work on the deliverable has begun. Development is typically limited to sketches, rough outlines, or similar levels of early completion. • Preliminary (P): work on the deliverable is advanced. Interim, cross-functional reviews have usually been conducted. Development may be near completion except for final reviews and approvals. • Complete (C): the deliverable has been reviewed and approved as appropriate. ESTIMATE CLASSIFICATION CLASS 5 CLASS 4 CLASS 3 CLASS 2 CLASS 1 General Project Data: Project Scope Description General Preliminary Defined Defined Defined Plant Production/Facility Capacity Assumed Preliminary Defined Defined Defined Plant Location General Approximate Specific Specific Specific Soils & Hydrology None Preliminary Defined Defined Defined Integrated Project Plan None Preliminary Defined Defined Defined Project Master Schedule None Preliminary Defined Defined Defined Escalation Strategy None Preliminary Defined Defined Defined Work Breakdown Structure None Preliminary Defined Defined Defined Project Code of Accounts None Preliminary Defined Defined Defined Contracting Strategy Assumed Assumed Preliminary Defined Defined Engineering Deliverables: Block Flow Diagrams S/P P/C C C C Plot Plans S P/C C C Process Flow Diagrams (PFDs) S/P P/C C C Utility Flow Diagrams (UFDs) S/P P/C C C Piping & Instrument Diagrams (P&IDs) S P/C C C Heat & Material Balances S P/C C C Process Equipment List S/P P/C C C Utility Equipment List S/P P/C C C Electrical One-Line Drawings S/P P/C C C Specifications & Datasheets S P/C C C General Equipment Arrangement Drawings S P/C C C Spare Parts Listings S/P P C Mechanical Discipline Drawings S P P/C Electrical Discipline Drawings S P P/C Instrumentation/Control System Discipline Drawings S P P/C Civil/Structural/Site Discipline Drawings S P P/C Figure 4. – Estimate Input Checklist and Maturity Matrix REFERENCES ANSI Standard Z94.2-1989. Industrial Engineering Terminology: Cost Engineering. AACE International Recommended Practice No.17R-97, Cost Estimate Classification System. Copyright 2000 AACE, Inc. AACE International Recommended Practices and Standards