2012 FLIGHT PLAN CONTENT CHANGES 2 nd  DMEAN Flight Planning Workshop – 29 October 2008 Cay Boquist  EUROCONTROL DAP/APN/A...
FPLSG/1 2004 ANC 164-5  23 October 2003 BACKGROUND Approved 27/5 2008 State letter 08/50 Overview
Item composition unchanged No change to the FPL form SCOPE OF AMENDMENT Instructions for completion of FPL Syntax changes ...
Item 10 b) increase from 2 to max 20 characters Digits allowed in Item 10 a & b ITEM 10 Syntax changes
ITEM 10 a) <ul><li>COM/NAV/APP equipment and  capabilities </li></ul><ul><ul><li>GBAS and LPV (A and B) </li></ul></ul><ul...
ITEM 10 a) <ul><li>COM/NAV/APP equipment and  capabilities </li></ul><ul><ul><li>PBN approved (R + Item 18) </li></ul></ul...
ITEM 10 b) <ul><li>SUR equipment and  capabilities </li></ul><ul><ul><li>Mode S – 3 new descriptors (total 7) </li></ul></...
ITEM 18 <ul><li>Change in order and new </li></ul><ul><ul><li>STS,  PBN ,   NAV, COM, DAT,  SUR ,   DEP,   DEST,  DOF ,   ...
ITEM 18 <ul><li>STS </li></ul><ul><ul><li>13 descriptors for special handling included </li></ul></ul><ul><li>PBN </li></u...
ITEM 18 <ul><li>DOF </li></ul><ul><ul><li>Maximum 120 hours before EOBT </li></ul></ul><ul><li>DLE </li></ul><ul><ul><li>E...
QUESTIONS
Upcoming SlideShare
Loading in...5
×

2012 FLIGHT PLAN CONTENT CHANGES

2,141

Published on

http://havatrafik.blogspot.com/

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
2,141
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
25
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
  • 2012 FLIGHT PLAN CONTENT CHANGES

    1. 1. 2012 FLIGHT PLAN CONTENT CHANGES 2 nd DMEAN Flight Planning Workshop – 29 October 2008 Cay Boquist EUROCONTROL DAP/APN/ATMP
    2. 2. FPLSG/1 2004 ANC 164-5 23 October 2003 BACKGROUND Approved 27/5 2008 State letter 08/50 Overview
    3. 3. Item composition unchanged No change to the FPL form SCOPE OF AMENDMENT Instructions for completion of FPL Syntax changes in Item 10 General
    4. 4. Item 10 b) increase from 2 to max 20 characters Digits allowed in Item 10 a & b ITEM 10 Syntax changes
    5. 5. ITEM 10 a) <ul><li>COM/NAV/APP equipment and capabilities </li></ul><ul><ul><li>GBAS and LPV (A and B) </li></ul></ul><ul><ul><li>ACARS (E1 - E3) </li></ul></ul><ul><ul><li>CPDLC (J1 - J7) </li></ul></ul><ul><ul><li>SATCOM (M1 - M3) </li></ul></ul><ul><ul><li>RCP (P1 - P9 reserved) </li></ul></ul>
    6. 6. ITEM 10 a) <ul><li>COM/NAV/APP equipment and capabilities </li></ul><ul><ul><li>PBN approved (R + Item 18) </li></ul></ul><ul><ul><li>RVSM approved (W) </li></ul></ul><ul><ul><li>MNPS approved (X) </li></ul></ul><ul><ul><li>VHF 8.33 capability (Y) </li></ul></ul>
    7. 7. ITEM 10 b) <ul><li>SUR equipment and capabilities </li></ul><ul><ul><li>Mode S – 3 new descriptors (total 7) </li></ul></ul><ul><ul><li>ADS-B – 6 new descriptors (total 6) </li></ul></ul><ul><ul><li>ADS-C – 2 new descriptors (total 2) </li></ul></ul>
    8. 8. ITEM 18 <ul><li>Change in order and new </li></ul><ul><ul><li>STS, PBN , NAV, COM, DAT, SUR , DEP, DEST, DOF , REG, EET, SEL, TYP, CODE, DLE , OPR, ORGN , PER , ALTN, RALT, TALT , RIF, RMK </li></ul></ul>
    9. 9. ITEM 18 <ul><li>STS </li></ul><ul><ul><li>13 descriptors for special handling included </li></ul></ul><ul><li>PBN </li></ul><ul><ul><li>24 different descriptors included (max 8 entries = 16 characters) </li></ul></ul><ul><li>NAV </li></ul><ul><ul><li>Other than specified under PBN </li></ul></ul><ul><li>COM </li></ul><ul><ul><li>COM not specified in Item 10 a) </li></ul></ul><ul><li>DAT </li></ul><ul><ul><li>Data applications not specified in Item 10 a) </li></ul></ul><ul><li>SUR </li></ul><ul><ul><li>Surveillance applications not specified in Item 10 b) </li></ul></ul>
    10. 10. ITEM 18 <ul><li>DOF </li></ul><ul><ul><li>Maximum 120 hours before EOBT </li></ul></ul><ul><li>DLE </li></ul><ul><ul><li>En route delay or holding </li></ul></ul><ul><li>ORGN </li></ul><ul><ul><li>Originators contact details (as required by ATS authority) </li></ul></ul><ul><li>PER </li></ul><ul><ul><li>Aircraft performance data </li></ul></ul><ul><li>TALT </li></ul><ul><ul><li>Take-off alternate (s) </li></ul></ul>
    11. 11. QUESTIONS
    1. A particular slide catching your eye?

      Clipping is a handy way to collect important slides you want to go back to later.

    ×