AtjConsultores_WorksSheet

  1. 1. INFRASTRUCTURE AND CIVIL ENGINEERING - PLANNING & PROJECTS - CONTROL AND SUPERVISION ROADS DEPARTMENT www.atjconsultores.com SAUDI ARABIA-ARGENTINA-BOLIVIA-COLOMBIA SPAIN-PARAGUAY- PERU-URUGUAY
  2. 2. VIELLA PLANNING & PROJECT ROAD DEPARTMENT ACTIVITY INFORMATION STUDY OF THE ROAD N-230 SOPEIRA- FRENCH BORDER. SECTION: NORTH ENTRANCE OF THE TUNNEL VIELLA-FRENCH BORDER KK.PP. 151+000 TO 187+100 SELECTED ALTERNATIVE BUDGET 273.557.435 USD BUDGET CONSULTING 1.102.959 USD DOCUMENTACION GRAFICA PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO DE CATALUÑA PURPOSE OF THE STUDY HIGHLIGHT THE 2A SHAFT TUNNEL (WITH A 4.560 METERS DEVELOPMENT AND A 3% SLOPE WITH WHICH DESCENDS MORE THAN 130 METERS OF ALTITUDE) AND THE VIADUCT ( 2H SHAFT, KP 2+155) OVER THE RIVER GARONA WITH A LENGTH OF 955 METERS. GENERAL INFORMATION: - APPROXIMATE LENGTH: 36 KM - PROJECT SPEED: 80 KM/H - ROAD WIDTH: 7,00 M. - ROAD VERGES: 1,50 M. OF ALTITUDE WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES PLANNING & PROJECT  
  3. 3. PLANNING & PROJECT ROAD DEPARTMENT ZARAGOZA ACTIVITY LAYOUT AND CONSTRUCTION PROJECT. A-68 HIGHWAY. SECTION: EL BURGO DE EBRO – FUENTES DE EBRO ( APPROXIMATE K.K.P.P. OF THE CURRENT N-232 ROAD: 207,5 TO 224,9) BUDGET 55.500.000 USD BUDGET CONSULTING 1.335.870 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO EN ARAGÓN. PURPOSE OF THE STUDY THE STRETCH OF THE ROAD PROJECTED BETWEEN K.P. 208 AND 212,5 CORRESPONDS TO ONE RELIEF ROAD WHICH WILL PREVENT THE PASSAGE OF LONG JOURNEY TRAFFIC BY THE MUNICIPALITY OF FUENTES DE EBRO, PROVINCE OF ZARAGOZA. THE PROJECT PROVIDES THE FUTURE DUPLICATION OF THE ROAD BY THE SOUTH, THE PART MOST DISTANT FROM THE MUNICIPALITY. CROSS SECTION TWO LANES AND 7 M WIDE ROAD. 1,50 M WIDE ROAD VERGES. THE BERMS WIDE IN THE CROSS SECTION IS 1,90 M AT THE LEFT MARGIN AND 0,90 M AT THE RIGHT MARGIN. GENERAL INFORMATION: - APPROXIMATE LENGTH: 17,7 KM - SPEED PROJECT: 100 KM/H - ROAD WIDTH: 7,00 M - ROAD VERGES: 2,50 M (EXTERNAL) Y 1,50 (INTERIOR). - MEDIAN: 8,00 M PLANNING & PROJECT TOTAL NUMBER OF PLANNED STRUCTURES: THREE OVERPASSES AND FOUR UNDERPASSES, PLUS THREE MORE FRAMEWORKS TO PASS PATHS. IS THE TYPE OF PREFABRICATED BEAM BRIDGES, TYPE “DOUBLE T” OR “DRAWER”, AND THE FOUNDATION IS GENERALLY SUPERFICIAL, USING BRAKE SHOES.
  4. 4. TALAVERA DE LA REINA PLANNING & PROJECT ROAD DEPARTMENT ACTIVITY CONSTRUCTION PROJECT: TALAVERA DE LA REINA SOUTHWEST RELIEF ROAD. SECTION: CURRENT LINK FROM THE N-V TO APPROXIMATELY THE 122,5 K.P. OF THE N-502 ROAD, SOUTH OF TALAVERA. BUDGET 47.935.262 USD BUDGET CONSULTING 746.140 USD PLANO DE CONJUNTO DE ALTERNATIVAS PROCESO CONSTRUCTIVO DEL VIADUCTO: PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO EN CASTILLA-LA MANCHA. VIADUCT OVER THE RIVER TAJO PRESTRESSED CONCRETE VIADUCT. BUILDING USING THE SUCCESSIVE CANTILEVER TECHNIQUE WITH TRAVELLING FORMWORK. TOTAL LENGTH: 253,75 METERS MAIN LIGHT ON THE RIVER: 114 METERS VIADUCT over the river tajo K.P. 5+400 DOCUMENTACION GRAFICA GENERAL INFORMATION: - APPROXIMATE LENGTH: 6.025 METROS - CONVENTIONAL ROAD - SPEED PROJECT: 100 KM/H - ROAD WIDTH: 7,00 M - ROAD VERGES: 1,50 M OTHER FEATURES: THOSE CONTAINED IN THE CURRENT STANDARD 3.1-IC LAYOUT FOR A CONVENTIONAL ROAD FINAL PROJECT SPEED. WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES PLANNING & PROJECT
  5. 5. PLANNING & PROJECT ROAD DEPARTMENT ACTIVITY IMPROVING CONNECTION AND ACCESSIBILITY BETWEEN THE ROADS OF BAIX LLOBREGAT ENVIRONMENT. ITS PURPOSE IS TO OFFSET THE TRAFFIC CONGESTION PROBLEMS IN THIS AREA AND IMPROVE THE CONNECTION BETWEEN ROUTES OF LARGE CAPACITY, LIKE BAIX LLOBREGAT FREEWAY (A-2), AP-2 HIGHWAY AND B-24 FREEWAY. BUDGET 53.798.000 USD BUDGET CONSULTING 1.309.659 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO EN CAtaluña. PURPOSE OF THE STUDY Improve connectivity and accessibility between the roads of the study area, around Baix Llobregat. Its purpose is to alleviate the traffic congestion problems in that area and to improve the connection between high capacity roads such as the Baix Llobregat freeway (A-2), the AP-2 highway and the B-24 freeway. GENERAL INFORMATION: - APPROXIMATE LENGTH: 17,7 KM - SPEED PROJECT: 100 KM/H - ROAD WIDTH: 7,00 M - ROAD VERGES: 2,50 M (EXTERNAL) Y 1,50 (INTERIOR). - MEDIAN: 8,00 M PLANNING & PROJECT BAIX
  6. 6. BAEZA CONTROL AND SUPERVISION ROAD DEPARTMENT ACTivity FREEWAY A-316 SECTIONS: BAEZA WEST LINK TO PUENTE DEL OBISPO NORTH LINK. BUDGET 46.079.986 USD BUDGET CONSULTING 1.603.565 USD PROMOTER - JUNTA DE ANDALUCÍA - GESTIÓN DE INFRAESTRUCTURAS DE ANDALUCÍA, S.A. - CONSEJERÍA DE OBRAS PÚBLICAS Y TRANSPORTES. GRAPHIC DOCUMENTATION: GENERAL INFORMATION: - APPROXIMATE LENGTH: 4,660 KM - PROJECT SPEED: 100 KM/H - TYPE SECTION: 2 CARRIAGEWAYS (WIDTH: 7,00 METERS EACH) - ROAD VERGES: 2,50 M (EXTERNAL) AND 1 M (INTERIOR) - EXTERIOR BERMS WIDTH: 1 M - MEDIAN WIDTH: 6 M (BETWEEN EDGES AND ROAD VERGES) - MINIMUM RADIUS: 800 METERS - MAXIMUM SLOPE: 7% - MINIMUM SLOPE: 4 % - UNDERPASS: 4 - LOWER PASS: 3 - CLEARING: 1.403.875 M³ - FILL: 1.216.406 M³ - ESPLANADE VOLUME: 153.598 M³ - HMA (HOT MIX ASPHALT): 64.588,26 TM WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES CONTROL AND SUPERVISION
  7. 7. control and supervision ROAD DEPARTMENT MÁLAGA ACTIVITY CONSULTING AND ASSISTANCE IN SAFETY AND HEALTH OF THE WEST MALAGA NEW ROUND RING. SECTION I: CONNECTION AP-7/MA-417. SECTION II: CONNECTION MA-417 WITH GUADALHORCE FREEWAY A-357 SECTION III: CONNECTION GUADALHORCE FREEWAY A-357 WITH C-3310 SECTION IV: CONNECTION C-3310 WITH FREEWAY A-7. BUDGET 591.722.944 USD BUDGET CONSULTING 1.120.473.96 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO DE ANDALUCIA ORIENTAL. CHURRIANA TUNNEL STRUCTURE: THE ROAD TUNNEL WITH THE LARGEST SECTION OF EUROPE. COMPOSED BY 2 TUBES OF 1.250 METERS AND 1.213 METERS OF LENGTH THAT RUN PARALLEL SEPARATED 50 METERS BETWEEN THEM. TUNNEL SECTION: 119,85 M². EVERY TUBE WILL HAVE CAPACITY FOR 4 LANES OF 3,5 METERS OF WIDTH, WITH ROAD VERGES AND SIDEWALK OF 1 METER AT BOTH SIDES OF THE TUNNEL. THE PROJECT SPEED IS 100 KM/ HOUR. SECTION EXCAVATED IS 18 METERS WIDE. MERCAMALAGA VIADUCT CONTROL AND SUPERVISION GRAPHIC DOCUMENTATION:
  8. 8. BAIX CONTROL AND SUPERVISION ROAD DEPARTMENT ACTIVITY EXTENSION OF THE BAIX-LLOBREGAT FREEWAY. SECTIONS: RONDA LITORAL (COASTAL RING ROAD) – HIGHWAY A16 BUDGET 88.462.696 USD BUDGET CONSULTING 1.326.694 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO EN CAtaluña. GENERAL INFORMATION: - TOTAL LENGTH (TRUNK): 2.000 METERS - PROJECT SPEED: 80 KM/H - GENERIC MINIMUM RADIUS: 500 METERS - MAXIMUM SLOPE: 4, 29 % - ROAD TYPE SECTION: - LANES 2x3,5 METERS - ROAD VERGES: 2,50/1,00 METERS - EXCAVATION: 476.778,95 M³ - FILL: 497.083,70 M³ - MIX ASPHALT: 101.084,133 TM 23 STRUCTURES, THE LARGEST IS 180 METERS LONG. WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES CONTROL AND SUPERVISION
  9. 9. control and supervision ROAD DEPARTMENT ACTIVITY IN THE BED OF THE RIVER LLOBREGAT. BUDGET 59.772.092,26 USD BUDGET CONSULTING 1.877.519 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO EN CATALUÑA. CONTROL AND SUPERVISION SANT BOI DE LLOBREGAT
  10. 10. graphic documentation: TALAVERA DE LA REINA CONTROL AND SUPERVISION ROAD DEPARTMENT ACTivity TALAVERA DE LA REINA SOUTHWEST RELIEF ROAD. SECTION: CURRENT LINK FROM THE N-V TO APPROXIMATELY THE 122,5 K.P. OF THE N-502 ROAD, SOUTH OF TALAVERA. BUDGET 34.047.639 USD BUDGET CONSULTING 2.176.443 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE ESTADO DE INFRAESTRUCTURAS Y PLANIFICACIÓN - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO EN CASTILLA LA MANCHA. GRAPHIC DOCUMENTATION: GENERAL INFORMATION: - EXCAVATION: 206.793 M³ - FILLS: 1.328.487 M³ - SOIL STABILIZED WITH CEMENT: 23.551 M³ - ARTIFICIAL GRAVEL: 17.944 M³ - MIX ASPHALT: 49.105 TM - CROSS DRAINAGE WORKS: 9+8 UNITS - LINKS: 3 UNITS - STRUCTURES: 15 UNITS - VIADUCTS: 4 UNITS (VIADUCT ON BRANCH 6 ON THE CREEK BATADÍEZ AND ALBERCHE CHANNEL: 120 M; VIADUCT ON BATADÍEZ CREEK K.P. 1+660: 160 M; VIADUCT ON BÁRRAGO CREEK K.P. 3+530:81 M; BRIDGE ON THE RIVER TAJO K.P. 5+400: 253,75 M). WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES CONTROL AND SUPERVISION
  11. 11. control and supervision ROAD DEPARTMENT AGÜIMES ACTIVITY REMODELING AND CONSTRUCTION OF LINKS AND SERVICE ROADS. ROAD GC-1 K.P. 23,080 TO 28,500 SECTION: AGÜIMES-SANTA LUCÍA BUDGET 23.023.405,32 USD BUDGET CONSULTING 1.912.865 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - GOBIERNO DE CANARIAS - DIRECCIÓN GENERAL DE INFRAESTRUCTURA VIARIA - ÁREA DE CARRETERAS GRAPHIC DOCUMENTATION CONTROL AND SUPERVISION
  12. 12. PLANO DE CONJUNTO PISIGA CONTROL AND SUPERVISION ROAD DEPARTMENT ACTIVITY SUPERVISION OF THE HUACHACALLAPISIGA ROAD CONSTRUCTION BUDGET 28.779.853,16 USD BUDGET CONSULTING 305.813 USD PROMOTER - ADMINISTRADORA BOLIVIANA DE CARRETERAS GENERAL INFORMATION: - TOTAL LENGTH: 71+248 KM - ROAD WIDTH: 10 METERS ( 2 BERMS TO BOTH SIDES OF 1 METER LANE, AND 4 METRES OF TWO-WAY LANE). - PAVEMENT TYPE: RIGID PAVEMENT WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES CONTROL AND SUPERVISION
  13. 13. control and supervision ROAD DEPARTMENT ACTIVITY ZUDAÑEZ - PADILLA BUDGET 204.391.690,57 USD BUDGET CONSULTING 989.200 USD PROMOTER - ADMINISTRADORA BOLIVIANA DE CARRETERAS GENERAL INFORMATION: - TOTAL LENGTH: 68 + 688 KILÓMETROS. - ROAD WIDTH: 7 METERS ( 2 BERMS TO BOTH SIDES OF 1 METER LANE, AND 3,5 METRES OF TWO-WAY LANE). - PAVEMENT TYPE: double superficial treatment 204.391.690,57 BS of contract from contractor company. CONTROL AND SUPERVISION ZUDAÑEZ-PADILLA
  14. 14. INFRASTRUCTURE AND CIVIL ENGINEERING - PLANNING & PROJECTS - CONTROL AND SUPERVISION RAILWAY DEPARTMENT www.atjconsultores.com SAUDI ARABIA-ARGENTINA-BOLIVIA-COLOMBIA SPAIN-PARAGUAY- PERU-URUGUAY
  15. 15. SANTA CATALINA PLANNING & PROJECT RAILWAY DEPARTMENT ACTIVITY SANTA CATALINA STATION CONSTRUCTION PROJECT. BUDGET 8.756.428 USD BUDGET CONSULTING 327.942,29 USD PROMOTER - CANARY ISLAND GOVERNMENT LOCATION OF THE STATION WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES PLANNING & PROJECT
  16. 16. ZARAGOZA-TERUEL control and supervision RAILWAY DEPARTMENT ACTIVITY CANOPIES INSTALLATION AND ADEQUEACY OF PEDESTRIAN ZONES. TERUEL-ZARAGOZA RAILWAY. BUDGET 18.833.163 USD BUDGET CONSULTING 1.204.371 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE ESTADO DE PLANIFICACIÓN Y ESTRUCTURAS. - DIRECCIÓN GENERAL DE INFRAESTRUCTURAS FERROVIARIAS. GRAPHIC DOCUMENTATION : GENERAL INFORMATION: - LENGHT: 200 KILOMETERS - RAILWAY TYPE: TWO-TRACK RAIL LINE - TRAFIC: GOODS AND PASSENGERS CONTROL AND SUPERVISION
  17. 17. control and supervision RAILWAY DEPARTMENT PICAMOIXONSRODA DE BARA ACTIVITY SUPPRESSION OF LEVEL CROSSING AT THE PLANA DE PICAMOIXONS-RODA DE BARÀ LINE. SECTION: KILOMETER POINTS 0/049, 0/715, 8/453, 10/470, 15/200, 16/964, 20/970, 23/174, 24/628 BUDGET 15.200.120 USD BUDGET CONSULTING 1.838.180 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE INFRAESTRUCTURAS FERROVIARIAS. GENERAL INFORMATION: - NUMBER OF LEVEL CROSSING: 10 - RAILWAY TYPE: Two-track rail line - TRAFFIC: GOODS AND PASSENGERS WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES CONTROL AND SUPERVISI0N
  18. 18. CHINCHILLACARTAGENA control and supervision RAILWAY DEPARTMENT ACTIVITY CONTROL AND SUPERVISION OF THE CONSTRUCTION “IMPROVEMENT OF ROADS AND ANCILLARY CONSTRUCTIONS AT CHINCHILLACARTAGENA LINE, SECTION: CHINCHILLA-AGRAMON” AND L.C. SUPPRESSION AT: CHINCHILLA-TOBARRA TOBARRA-ABRAMON BUDGET 90.761.646 USD BUDGET CONSULTING 1.693.128 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE ESTADO DE PLANIFICACIÓN Y ESTRUCTURAS. - DIRECCIÓN GENERAL DE INFRAESTRUCTURAS FERROVIARIAS. GRAPHIC DOCUMENTATION : CONTROL AND SUPERVISION
  19. 19. INFRASTRUCTURE AND CIVIL ENGINEERING - PLANNING & PROJECTS - CONTROL AND SUPERVISION HYDRAULIC PROJECTS DEPARTMENT www.atjconsultores.com SAUDI ARABIA-ARGENTINA-BOLIVIA-COLOMBIA SPAIN-PARAGUAY- PERU-URUGUAY
  20. 20. CUENCA PLANNING & PROJECT HYDRAULIC PROJECTS DEPARTMENT ACTIVITY TECHNICAL ASSISTANCE FOR DRAFTING SANTA MARINA´S TANK CONSTRUCTION PROJECT. BUDGET 15.565.928 USD BUDGET CONSULTING 1.300.562 USD PROMOTER - AGUA DE LAS CUENCAS DEL SUR PIPELINE SECTION TANK VIEW GENERAL INFORMATION: CROSS SECTION WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES 8000 m3 TANK CAPACITY DIVIDED INTO TWO EQUAL VESSELS AND WITH A PUMPING SYSTEM WITH A MAXIMUM FLOW OF 446,4 m3/H AND 33 mETERS OF MANOMETRIC HEIGHT. THIS DEPOSIT WILL SUPLY FROM THE “MANCOMUNIDAD DE GIRASOL” DRINKING-WATER TREATMENT PLANT, THROUGH A 200 METERS DIAMETER DUCTIL IRON PIPELINE, INCLUDED WITHIN THE PERIMETER RING CONSTRUCTION IN TARANCON. PLANNING & PROJECT
  21. 21. ORENSE CONTROL AND SUPERVISION HYDRAULIC PROJECTS DEPARTMENT ACTIVITY IMPROVING CONTAINMENT DEFENSE ELEMENTS ON THE “RIAS BAIXAS” FREEWAY. SECTIONS: A-52, K.P. 112,230 TO 267,100 PROVINCE OF ORENSE (SPAIN). BUDGET 38.480.000 USD BUDGET CONSULTING 1.066.399 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE ESTADO DE PLANIFICACIÓN Y ESTRUCTURAS. - DIRECCIÓN GENERAL DE CARRETERAS. GRAPHIC DOCUMENTATION : GRAPHIC DOCUMENTATION : CONTROL AND SUPERVISION
  22. 22. CONTROL AND SUPERVISION HYDRAULIC PROJECTS DEPARTMENT VELILLA ACTIVITY TECHNICAL ASSISTANCE FOR THE DEVELOPMENT OF TERTIARY TREATMENT CONSTRUCTION (VELILLA DE SAN ANTONIO Y ARANJUEZ NORTH´S WWTP-WASTEWATER TREATMENT PLANT) AND IRRIGATION WATER SUPPLY WITH RECLAIMED WATER (MUNICIPALITIES OF ARANJUEZ AND TRES CANTOS, MADRID, SPAIN) BUDGET 12.565.235 USD BUDGET CONSULTING 605.308 USD PROMOTER - CANAL DE ISABEL II GRAPHIC DOCUMENTATION : GENERAL INFORMATION: PROVIDE THE VELILLA DE SAN ANTONIO´S (MADRID) WASTEWATER TREATMENT PLANT WITH A TERTIARY TREATMENT THAT ALLOWS THE REUSE OF THE TREATED WATER FOR THE PUBLIC GREEN ZONES IRRIGATION IN THE MUNICIPALITIES OF SAN ANTONIO AND MEJORADA DEL CAMPO, SPAIN. THE TERTIARY TREATMENT WILL BE SIZE FOR A CAPACITY OF 3.000 m3/DAY. THE PLANT WILL BE IMPLEMENTED IN CIVIL CONSTRUCTION FOR THE FUTURE FLOW AND ONLY WILL BE EQUIPPED FOR THIS FIRST PHASE, SO THAT IN THE FUTURE EXTENSION ONLY THE REQUIRED EQUIPMENT SHOULD BE PLACED. WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES CONTROL AND SUPERVISION
  23. 23. RIVAS VACIAMADRID CONTROL AND SUPERVISION HYDRAULIC PROJECTS DEPARTMENT ACTIVITY TECHNICAL ASSISTANCE SERVICE TO PROJECTS OF REUSING CONSTRUCTIONS (NETWORKS AND TERTIARY). TERTIARY TREATMENT OF SUR ORIENTAL´S (RIVAS VACIAMADRID, SPAIN) WWTP. BUDGET 7.379.000 USD BUDGET CONSULTING 456.617 USD PROMOTER - CANAL DE ISABEL II GRAPHIC DOCUMENTATION : TERTIARY TREATMENT INFLUENT PARAMETERS EFFLUENT PARAMETERS Caudales Actual Parámetro Unidad Valor límite Parámetro Unidad Valor límite Metro diario (m2/día) Nº de horas de 7000 12 funcionamiento (h) Medio horario (m2/h) 583.3 DBO2 DQO SST Reducción mg/l mg/l mg/l % <=25.0 <=125.0 <=35.0 =>80.0 de fósforo pH DBO2 SST Turbidez pH Coliformes mg/l mg/l NTU UFC/100 ml <=5.0 <=5.0 <=10.0 6.0<=pH<=9.0 <=200 - 6.0<=pH<=9.0 fecales Nematodos huevos/10 l <=1.0 intestinales Cloro residual mg/l CONTROL AND SUPERVISION >=0.6
  24. 24. Contact web address: www.atjconsultores.com email: international@atjconsultores.com HEADQUARTERS (HQ) La Coruña, 13. 3º Planta. 28020 Madrid, Spain Contact.: 91 556 38 54 - Fax: 91 556 65 SPAIN Mallorca, 221. 6é-2a 08008 Barcelona Contact.: 93 454 06 11 Joaquim Auger, 64-66 08830 Sant Boi de Llobregat Adelfas, 17 35260 Las Palmas de Gran Canaria (Agüimes) Contact.: 676 22 39 44 Clariano, Nº 32-2º-4º 46021 Valencia Contact.: 96 369 70 75 SAUDI ARABIA Al Khobar/Al-Salah Tower #701. P.Faisal Bin Fahad Road Contact.: +966(55).732.8851 ARGENTINA Sarmiento, 654. Piso 10 Dpto C B1878GEN, Buenos Aires Contact.: +54.11.4139.8785 BOLIVIA Chaco, Pasaje 824. nº 2088. Zona Sopocachi, La Paz Contact.: +73007086 URUGUAY Charrua, 2027 11200, Montevideo Contact.: +59.122.42.45.49 PARAGUAY Asunción Boquerón, 594 Contact.: +595.21.224.131 PERU Jr. Brasil 370 Chosica, 15. Lima Contact.: +511.767.05.29
  25. 25. WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES

×