Your SlideShare is downloading. ×
Curriculum vitae
Curriculum vitae
Curriculum vitae
Curriculum vitae
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
910
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
8
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Curriculum Vitae Name: Sigve Hamilton Aspelund Degree: M.Sc. Petroleum engineering with applied science programme – Sivilingeniør, Teknisk realfag Position: Project reservoir engineer consultant Company: ACE ODIN (Org.nr: 995188341) Nationality: Norwegian Date of birth: 29.01.1976 Language: Norwegian, English Last updated: 19.10.2010 Contact details: Reevegen 43, 4340 Bryne Phone: +47 92 64 71 29, email: sigve.aspelund@lyse.net Nettworks (iCV):http://www.linkedin.com/in/aspelundsigve (Dynamic CV) Website: http://sigvehamiltonaspelund.wordpress.com/about/ Naymz : http://www.naymz.com/sigve_hamilton_aspelund_2854464 • Entrepreneurship • Market knowledge and business insight • Clearly and distinctly oral presentation skills • Dedicated to creating and maintaining both internal and external relationships • Exceptional knowledge and interest in IT and disciplines within the oil exploration and production industry Work experience: 11.2008- today: Project reservoir engineer consultant at ACE ODIN • Project: Mathematics, physics and chemistry teacher consultant at Akademiet • Administrative and drilling project for Frank`s international • Advising expert consultation within norwegian drilling service market for Gerson Lehrman Group • Business research • Creating alliances • Connecting business worldwide • Security Interviewed Gunnar Berge in order to optimize offshore security. Attended and held an security- presentation at the seminar: Bringing businesses from east and west together by TransEuropean Centre at Rica Forum • Developing network: Linkedin (3k+) (1M in 2nd. 15M in 3rd.), Plaxo (1.3k+), Naymz (200+), WLM (800+), Twitter (800+flws), Facebook (500+) and sorting business cards (200+). Export/Import contacts to Outlook and Skype for communication • Created the open Linkedin groups: Networking for creating opportunities (350+) and Networking for creating business (90+) • Business development: ACE ODIN 08.2009- 12.2009: Consultant at Stavanger kommune (Rogaland fylkeskommune) 1
  • 2. Teaching at Stavanger Offshore Tekniske Fagskole: Teaching: • Production technique 1 & 2 • Drilling technology • Geology and formation evaluation • Health, Safety and Environment for the oil industry • Well control • Drilling fluids • Operating and control systems • Mathematics • Chemistry prosess • Alternative energy Consulting students at PetroChallenge Norway 2009 @ University of Stavanger Managing event expedition to Weatherford oil field base in Forus Leading students expeditions at oil museum in Stavanger and Ullrigg @ International Research Institute of Stavanger 11.2008-07.2009: Production engineer consultant at Oilfield Technology Group Production engineer consultant at StatoilHydro (Grane) Responsible for: • Production steering • Well testing and analysis. Displaying results in OFM. • Production analysis with Flow manager • P&I plan Analysis of market for Swath 03. 2007- 10.2008: Production engineer at Talisman: Optimising oil production Sub project leading: Subsurface within integrated operations (TENAS operation project) Production supervising with PI process book designing and real time allocation programming with PI excel Responsible for: • Annual and monthly reports • Well allocation including production analysis • Well testing and well test analysis • Weekly production & injection planning and morning meetings with the communication tool GoToMeeting • Real time production analysis with PI process book • Production optimizing with Prosper and GAP Planning well operations: o Mechanical operations: Increased oil production from 600 Sm3 /d to 1200Sm3 /d in a well by increase reservoir pressure by increasing water injection and changing the choke, stabilized 2 slugging wells by changing gas lift valves (Stabilized total production) o PLT, Water shut of and perforations (Increased oil production from 100 Sm3 /d to 250 Sm3 /d). • Production optimizing including field visits offshore at Petrojarl Varg and Varg A • Organized a team building, presentations and a seminar • Production forecasting Attending all multidisciplinary team work: Representing for PTIL and partners, exploration, development ++ 2
  • 3. 01.2006-02.2007: Reservoir engineer at IOR Chemco Analyzing of the world marked (High water cut reservoirs and sand producing reservoirs) Consultant: Project within petrophysics and geology for Badger Explorer. Data collection and data base development. Representation at ONS Reporting (Inteligel progress at IRIS) to Norwegian Research Council, Total, Statoil and Norsk Hydro Screening of Espoir operated by Canadian Natural Recourses 05-11.06: Project research: Optimisation of mSand (chemicals for sand consolidation) at International Research Institute of Stavanger: Petrophystical measurements: PV, permeability, porosity and RRFw • Field manager: mGel reservoir stimulation for increased oil recovery at Gullfaks C including: Quality assurance of treatment, photographing onsite and reporting • Application to ONS innovation award (Was nominated to the award) • Articles published at OTC (Offshore & Energy) and ONS (Scandinavian oil and gas magazine) • Representation at IOR 2006 in Tulsa Oklahoma (SPE) • PowerPoint designing for sales meetings and reporting • Presentation for potential customers in Aberdeen • Contact developing (Gained 15 business meetings in Aberdeen over a short period) • Marked analyzing of the British shelf (High water cut sand reservoirs) • Screening of projects including well log investigation and reservoir evaluation: Brage (Norsk Hydro), Gullfaks (Statoil) • Further information at following web site: forskning.no > Intelligent gelé skal redde oljefelt 02.2003-12.2005: Mudlogging geologist at Geoservices • Well monitoring: Pit volume control and gas control • Maintaining sensors and repairing equipment • Reporting of geology • Geology: Catching samples, lithology analyze, cuttings and cavings description and calcimetry analysis and core handling • Logistics: Sending equipment and samples onshore. • See projects last page 03.2002-09.2002: Laboratory engineer at ResLab Special Core Analysis: Measurement of petrophysical data: Permeability, porosity and capillary pressure/resistivity curves 09.2001-02.2002: Geoscientist at Roxar Reservoir Modelling: System helpdesk (RMS 6.2) Software error localization: Importing Eclipse grid files for inspection in RMS 7.0 Technical Qualifications: 2003: Post-qualifying education, Reservoir engineering - Rogaland University (HiS). 1999-2001: Sivilingeniør (M.Sc.) Petroleum Engineering - HiS. Main discipline: Petroleum engineering with applied science programme. 1998-1999: Petroleum engineering (HiS) Candidatus Magisterii (B. Sc.) – Norwegian University of Technology and Science (NTNU), HiS (petroleum engineering) and University of Bergen (UiB). 1998: Examen philosophicum - UiB. 1997-1998: Navy: Naval diving school and security guard 1995-1997: Elementary courses in mathematics and physics – NTNU 3
  • 4. 1992-1995: High School – Bryne gymnas (Student of confidence) Offshore experience: Geoservices: Norway Statoil Deep Sea Trym 34/10-4-2H 2003 Statoil Deep Sea Trym 24/10-M-3BH 2003 Total Scarabeo 6 25/5-C-1H 2003 Norske Shell Deep Sea Trym 6407/9-E-2H 2003 Statoil Transocean Searcher 15/9-E-3H 15-9-E-1H 2004 Statoil Snorre B 34/4-1-1H 2004 Statoil Tr. Searcher 15/9-E-4H 6506/12-Q-2H 2004 Statoil West Navigator 65/07-3-4 2004 Statoil Stena Don 6608/10-B-4BH 2004 Talisman Gyda 2/1-A16 AY1 2004 Statoil Borgland Dolphin 34/10-F-2 Y1H 2004 3-1/11-A11 2004 Talisman Gyda 2/1-A16 AY1/T2 2004 Eni Norge Ocean Vanguard 6406/1-3 2004 HPHT Statoil West Alpha 6506/11-P-3 H 2005 BP Vallhall IP 2/8-G-10 T3 2005 Statoil Snorre B 34/4-K-7 H 2005 Statoil Sleipner A 15/9-A-23 A 2005 BP Ula 7/12-A-5 B 2005 BP Vallhall 2/8-G-11-T4/TS 2005 BP Ula 7/12-a-05b-t2 2005 Statoil Sleipner A 15/9-A-19 2005 Statoil Sleipner A 15/9-A19T2 2005 Hydro TR. Leader 6605/8-1 2005 Comment: I have experienced both wildcats with a very fast drill rate and advanced production wells and been lucky to work with many different reservoirs both sandstone and chalk. IOR Checmo: Statoil Gullfaks: Water shut of treatment with emulsified polymers 2006 Talisman: Varg/Petrojarl Varg: Improved oil recovery methods: PLT & gaslift 2007/2008 My business card: 4

×