Your SlideShare is downloading. ×
  • Like
The Port of West Sacramento
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Now you can save presentations on your phone or tablet

Available for both IPhone and Android

Text the download link to your phone

Standard text messaging rates apply

The Port of West Sacramento

  • 289 views
Published

Presentation by the Port of West Sacramento at the Propeller Club of Northern California's event: The Role of Northern California Regional Ports, held July 17, 2012.

Presentation by the Port of West Sacramento at the Propeller Club of Northern California's event: The Role of Northern California Regional Ports, held July 17, 2012.

Published in Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
289
On SlideShare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
2
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. www.ENLIGNA.de ENLIGNA – Neues Format
  • 2. Facilities Overview North Terminal - 181 Acres Recreational Area Rowing, Boating 750,000 Mineral Export Terminal Covered Storage 2 million metric tons 6 Cargo Berths 600 feet each Two Rivers Cement Import Cemex Brusco 800,000 Metric Tons Cement /Aggregate Import Tug & Barge 2 million metric tons Rice Silos (2) 45,000 metric tonsAgrium Fertilizer Seaway Expansion Area Terminal 220 Developable Acres75,000 metric tons www.ENLIGNA.de ENLIGNA – Neues Format
  • 3. Current Major Projects July 2012 Sierra Northern Railway Sierra Energy Project West Coast Recycling Construction 2012-2013 300,000 Tons Recycled Metal (Export) (to be constructed 2012) Tenant Metals Containers Barge Iron Fines Export Service 1 million tons/4 years All Infrastructure Complete Starts 7/16/12 Start Service –Summer 2013 Two Rivers Lehigh Hansen Cement 800,000 tons cement Expanding to 2 Million Tons (Application Filed)www.ENLIGNA.de ENLIGNA – Neues Format
  • 4. PORT OF WEST SACRAMENTO Washington TransferRAIL FACILITIES MAP Completion2011-2012 Scheduled Improvements for September 30,2011Unit Train Service Washington Overpass Upgrade Scheduled Completion Fall 2012 Port Loop Track Planned Completion Fall 2012 Unit Train Track 2 Completed January ,2011 Unit Train Track 1 Existingwww.ENLIGNA.de ENLIGNA – Neues Format
  • 5. NEW HARBOR BOULEVARD FREEWAY INTERCHANGE• NEW $36M USD INTERCHANGE FOR PORT ACCESS (LESS THAN 0.8km)• EASY ACCESS TO INTERSTATE HIGHWAYS 5 & 80 (1.6 km)• DESIGNED FOR WIND EQUIPMENT AND HEAVY PROJECT CARGO
  • 6. SACRAMENTO/STOCKTON / OAKLAND CONTAINER BARGE PROJECT DOCK STRENGTHENING
  • 7. SACRAMENTO/STOCKTON / OAKLAND CONTAINER BARGE PROJECT MOBILE HARBOR CRANE
  • 8. CONTAINER FREIGHT BUILDING
  • 9. www.ENLIGNA.de ENLIGNA – Neues Format
  • 10. www.ENLIGNA.de ENLIGNA – Neues Format