8802 -MUNGER RAIL CUM ROAD BRIDGE
PROJECT
SAFE WORK

SAVE LIFE

SAFETY MONTH CELEBRATION NOVEMBER,2013
Developing a positi...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Flag Hoisting By Our Project
Manager Mr. P.K.Dasgupta(GIL)

Mr...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Occupational Health Checkup for Workers & Staff
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Inspection Of All PPEs By Line Mangers Of P&R (Sub Contractor)...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Inspection of Plants and Equipment's, Vehicles, lifting equipm...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Inspection And Verification Of Competency Of Drivers By Senior...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Verification of legal documents by Mr.S.K.Behera (GIL safety )...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Fire Extinguished By Worker During Fire
Mock Drill

Demonstrat...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

The Victim Sent To Site First Aid Center By
Ambulance

Mr. R.K...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Inspection Of Electrical Panel And Transformer Led By Mr. Pank...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Inspection Of Welding Machines And Electrical Power Driven Mac...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Inspection Of Fire Extinguishers By Mr. S.K.Behera (A.M. I GIL...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

5S Audit At Q.C Lab & Store of GIL Led By Mr. Ashis Yadav (Pla...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Material stacking at GIL store

5S Audit At P&R Store Led By M...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Mr. R.K.P.Singh (Safety I/C) Briefing The
Workers About Safety...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Different Safety Videos From Gammon’s HO
And Recent Site Obser...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Mr. R.K.Singh(D.M.I,GIL),Mr. A.K.Singh(DM I,GIL),Mr. A.Kapra(G...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Mr. R.K.P Singh(Safety I/C) & Mr.
S.K.Behera(A.M .I,GIL Safety...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Mr. R.K.P Singh(safety I/C) & Mr.
S.K.Behera(A.M .I GIL Safety...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Mr. R.K.Singh(D.M -I, GIL) Inspecting The
Safety Posters

Mr. ...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Mr. Pankaj Kumar (Plant I/C,GIL) And Mr. Samrendra Sinha (GIL ...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Mr. S.K.Behera (GIL Safety) , Mr. Chetan Chouhan (GIL Admin) &...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

All Dept. In-charges, Engineers &
Supervisors Participated in ...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Mr.R.K.Singh(DM-1,GIL),
Mr.R.K.P.Singh(Safety I/C) Leading the...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Mr. S.K.Behera (AM-I) & Mr. Chetan Chauhan
(GIL Admin) Leading...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Brief Description Of Closing Day Ceremony
By Mr. R.K.P.Singh (...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Mr. P.K.Dasgupta (Project I/c ,GIL)
Welcomes Mr. Praveen Kumar...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Safety Pledge By Our Honorable Guest Mr. Praveen Kumar Alok (X...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Safety speech by our chief guest Mr. R.P
Kausher (Dy. Chief En...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Safety Speech By Our Honorable Guest Mr. Praveen Kumar Alok (X...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Safety Speech By Mr. R.K.Singh (DM-1,GIL )and Mr. A.Kapra GM (...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Safety Speech By Mr. S.Chakraborthy (GIL )and Mr. Nikhilesh Si...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Dy. Chief Railway Engineer ,our chief guest with other dignita...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Mr. R.P Kausher (Dy. Chief Engineer, East
Central Railway) Giv...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Mr. Praveen Kumar Alok (X.E.N. /CON/MGB) of East
Central Railw...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Mr. S.K.Behera (GIL safety) receiving the certificate of appre...
5 th Safety Month Celebration
Nov-2013 At Munger 8802 Site

Vote of thanks by Mr. S.K.Behera (A.M.:-I
GIL Safety)

Sweet D...
Upcoming SlideShare
Loading in...5
×

Safety month celebration at Munger Ganga Bridge, North End

381

Published on

Gammon India Ltd celebrate his own safety month in November every month.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
381
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Safety month celebration at Munger Ganga Bridge, North End

  1. 1. 8802 -MUNGER RAIL CUM ROAD BRIDGE PROJECT SAFE WORK SAVE LIFE SAFETY MONTH CELEBRATION NOVEMBER,2013 Developing a positive safety culture’ “एक सकारातमक सुरका संसकृ ित के िवकास की ओर” BY SAFETY DEPARTMENT 8802 ,MRRB SITE
  2. 2. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Flag Hoisting By Our Project Manager Mr. P.K.Dasgupta(GIL) Mr. R.K.P.Singh Site Safety I/c ) declaring 5th safety month celebration Program
  3. 3. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Occupational Health Checkup for Workers & Staff
  4. 4. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Inspection Of All PPEs By Line Mangers Of P&R (Sub Contractor) Led By Mr. B.P.Singh (P&R) And Guided By Mr. S.K.Behera (GIL Safety)
  5. 5. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Inspection of Plants and Equipment's, Vehicles, lifting equipment and gear by line managers and preparation of report. Guidance by Safety personnel.
  6. 6. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Inspection And Verification Of Competency Of Drivers By Senior Site Management Of GIL And P&R (Sub Contractors) Guided By GIL Safety
  7. 7. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Verification of legal documents by Mr.S.K.Behera (GIL safety )& Mr. Vaibhav Kumar (Gil Planning )
  8. 8. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Fire Extinguished By Worker During Fire Mock Drill Demonstration of CPR By Mr. G.K.Patnaiak (GIL Safety) During Fire Mock Drill
  9. 9. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site The Victim Sent To Site First Aid Center By Ambulance Mr. R.K.P.Singh (Safety I/C )Briefing About Fire Emergency To All
  10. 10. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Inspection Of Electrical Panel And Transformer Led By Mr. Pankaj Kumar (GIL Plant I/C) With Plant Staff Of P&R (sub-contractor) And Guided By GIL Safety Led By Mr. R.K.P Singh(GIL Safety I/C)
  11. 11. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Inspection Of Welding Machines And Electrical Power Driven Machines Led By Mr. Pankaj Kumar (GIL Plant I/C) With Plant Staff Of P&R (Sub-contractor) And Guided By GIL Safety Led By Mr. R.K.P Singh(GIL Safety I/C)
  12. 12. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Inspection Of Fire Extinguishers By Mr. S.K.Behera (A.M. I GIL Safety )& Mr. G.K.Patnaiak (Safety Officer GIL)
  13. 13. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site 5S Audit At Q.C Lab & Store of GIL Led By Mr. Ashis Yadav (Planning Eng. P &R ) and Guided By Mr. R.K.P Singh(Safety I/C)
  14. 14. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Material stacking at GIL store 5S Audit At P&R Store Led By Mr. Ashis Yadav (Planning Eng. P &R ) At P&R Store And Guided By Mr. S .K. Behera (GIL Safety)
  15. 15. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Mr. R.K.P.Singh (Safety I/C) Briefing The Workers About Safety Procedures To Work At Height And Gammon’s Safety Policy To Workers of Erection Site Mr. G.K.Patnaiak (Safety Officer GIL) Taking The Attendance Of Participants In Training Programme
  16. 16. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Different Safety Videos From Gammon’s HO And Recent Site Observation Videos Was Put On Show To The Participants Mr. S.K.Behera (A.M .GIL Safety) Explained The Safety Videos
  17. 17. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Mr. R.K.Singh(D.M.I,GIL),Mr. A.K.Singh(DM I,GIL),Mr. A.Kapra(GM , P&R),Mr. Pankaj Kumar(GIL Plant I/C),Mr . Sivaji Saw (GIL Store I/C )Were The Judges For Safety Quiz Programme
  18. 18. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Mr. R.K.P Singh(Safety I/C) & Mr. S.K.Behera(A.M .I,GIL Safety) Explaining The Questions To The Participants Participants Submitting The Answer Sheets
  19. 19. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Mr. R.K.P Singh(safety I/C) & Mr. S.K.Behera(A.M .I GIL Safety) Evaluating The Answer Sheets Of Participants Results Are Declared By Mr. Ganguly(GIL Regional Store Coordinator) & Mr. S.Chakraborthy
  20. 20. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Mr. R.K.Singh(D.M -I, GIL) Inspecting The Safety Posters Mr. R.K.Singh (D.M. I,GIL)giving The Marks To The Posters
  21. 21. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Mr. Pankaj Kumar (Plant I/C,GIL) And Mr. Samrendra Sinha (GIL Accounts) Inspecting And Giving Marks For Safety Slogans And Safety Speech Respectively
  22. 22. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Mr. S.K.Behera (GIL Safety) , Mr. Chetan Chouhan (GIL Admin) & Mr. Asish Yadav(P&R Planning) Inspection the Mess
  23. 23. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site All Dept. In-charges, Engineers & Supervisors Participated in Safety March Safety March starts from the site main office and moving towards work shop
  24. 24. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Mr.R.K.Singh(DM-1,GIL), Mr.R.K.P.Singh(Safety I/C) Leading the Safety March With Other Staffs in Work shop-1 Workers Are Watching The March And Also Reading The Safety Slogans
  25. 25. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Mr. S.K.Behera (AM-I) & Mr. Chetan Chauhan (GIL Admin) Leading The Safety March Towards Finishing Area Mr. R.K.P.Singh, Mr. G.K.Patnaiak & All The Staff Leading The Safety March Leading The Safety March Towards Sand Blasting Area
  26. 26. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Brief Description Of Closing Day Ceremony By Mr. R.K.P.Singh (Safety I/C) Mr. S.K.Behera (GIL safety ) providing the badges to honorable guests
  27. 27. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Mr. P.K.Dasgupta (Project I/c ,GIL) Welcomes Mr. Praveen Kumar Alok (X.E.N. /CON/MGB, ECR ) , East Central Railway The Main Client Of The Project Mr. A. Kapra (GM P&R) Welcomes Mr. Rajiv Kumar Singh. (DGM Of Our Client BBJ)
  28. 28. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Safety Pledge By Our Honorable Guest Mr. Praveen Kumar Alok (X.E.N. /CON/MGB) of East Central Railway ,The Main Client Of The Project With All Staff And Workers
  29. 29. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Safety speech by our chief guest Mr. R.P Kausher (Dy. Chief Engineer, East Central Railway) Safety Speech By Our Special Guest Mr. Rajiv Kumar Singh. (DGM Of Our Client BBJ)
  30. 30. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Safety Speech By Our Honorable Guest Mr. Praveen Kumar Alok (X.E.N. /CON/MGB) of East Central Railway & Mr. P.K. Dasgupta Project Incharge GIL
  31. 31. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Safety Speech By Mr. R.K.Singh (DM-1,GIL )and Mr. A.Kapra GM (P&R-our Sub Contractor)
  32. 32. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Safety Speech By Mr. S.Chakraborthy (GIL )and Mr. Nikhilesh Singh Safety Supervisor of SKS Enterprises our sub contractor for deck slab concreting
  33. 33. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Dy. Chief Railway Engineer ,our chief guest with other dignitaries visiting the exhibition of safety posters, slogans, songs, etc. He was very impressed with our Safety Month Programme and also workers are seeing
  34. 34. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Mr. R.P Kausher (Dy. Chief Engineer, East Central Railway) Giving Away The Prizes To Winners Of Safety Quiz Competition Mr. Praveen Kumar Alok (X.E.N. /CON/MGB) of East Central Railway Giving Away The Prizes To Winners Of Different Competitions
  35. 35. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Mr. Praveen Kumar Alok (X.E.N. /CON/MGB) of East Central Railway Giving Away The Prizes To Winners Of Different Competitions The Winner In The Safety Slogan/Safety Song Competitions Is Singing His Song In Front Of All Competitions Held For Held For Safety Quiz , Safety Posters, Safety Slogans , Safety Speech & Spot The Hazard. 51 No's Of Prizes Distributed.
  36. 36. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Mr. S.K.Behera (GIL safety) receiving the certificate of appreciation and also total of 33 persons(site safety staff ,electricians,drivers,rigging foremans , EOT operators and electricians are given certificate of appreciation for their contribution in implementing and maintaining safe practices)
  37. 37. 5 th Safety Month Celebration Nov-2013 At Munger 8802 Site Vote of thanks by Mr. S.K.Behera (A.M.:-I GIL Safety) Sweet Distribution To All
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×