• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Project preditor
 

Project preditor

on

  • 505 views

m8870, 8051 micro-controller Ics are used in this project. its a robot just as a robo cop

m8870, 8051 micro-controller Ics are used in this project. its a robot just as a robo cop

Statistics

Views

Total Views
505
Views on SlideShare
505
Embed Views
0

Actions

Likes
0
Downloads
1
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Project preditor Project preditor Presentation Transcript

    • PROJECT PROJECT PREDITORPREDITORTEAM PRESENTING:Asim HassanHussnain javaidFarzanaNeloferBrishna
    • ROBOTICS• Robotics is the branch of technology that deals with the design, construction, operation and application of robots and computer systems for their control, sensory feedback, and information processing. These technologies deal with automated machines that can take the place of humans, in hazardous or manufacturing processes, or simply just resemble humans. Many of todays robots are inspired by nature contributing to the field of bio-inspired robotics just as project predator is.• The concept in creation of machines that could operate autonomously dates back to classical times, but research into the functionality and potential uses of robots did not grow substantially until the 20th century. Throughout history, robotics has been often seen to mimic human behavior, and often manage tasks in a similar fashion. Today, robotics is a rapidly growing field, as we continue to research, design, and build new robots that serve various practical purposes, whether domestically, commercially, or militarily. Many robots do jobs that are hazardous to people such as defusing bombs, exploring shipwrecks, and mines.
    • INSPIRATION• After an avalanche smashed into a Pakistan Army camp, burying at least 124 soldiers and 11 civilians in “the world’s highest battleground”. A battleground from where they never came back.• What they left was just there families and an inspiration, to build a robot which can save life from deadly havocs and minimize any other incident in future.
    • ADVANTAGES OF• PROJECT DTMF controlling new innovation which will reduces cost of GSM controlling upto50%.• Surveillance Coverage of 360 degree view by cameras.• Injecting Morphine & then drag a person• Auto modes of surveillance.• Will be capable to Handle Ammunition.• Remote efficient and silent camouflaged machine• Mine detection (optional)• Capable to eliminate hurdles (up to funds)• FPGA optional (up to funds).• Speed up to 120Km/h optional (up to funds).
    • FUTURE BENEFITS• Will provide best Security & surveillance where implemented• First aid where no human can reach under hard circumstances• A new innovation regarding GSM controlling• Great scope of idea for Mini detection which can be extended to detect suicide bombers also• Emerges scope of robotics in Pakistan• Can be used by military in areas such as searching glacier• Can be used as a spy
    • NECESSIT• Y Pair Of Laptops• Pair Of Mobile phones• 4 Cameras• Conveyer Belt(18x4)• DTMF, micro-Controller etc• Motors• Welding Machine• Iron frame• Microcontroller• Suppressor• 70cc Engine• Misc.
    • MILESTONES AND DELIVERABLESs/no Elapsed time since start of Milestone Deliverable the project1 15 July 2012 Documentation, A logical view of robot diagrams, simulations, graphical views2 15 August 2012 The circuit hardware A physical set to show the with all controller controller equipment working)3 20 December 2012 The body of robot Frame of project conveyer belts etc4 20 January 2013 Complete robot A complete robot working5 15 April 2013 Testing robot for A complete project accuracy predator
    • 15-Apr-13 20 05 20-Jan-13 20 204 20-Dec-12 20 403 15-Aug-12 20 602 15-Jul-12 20 801 0 20 40 60 80 100 120 completed Remaining
    • 3D MAX VIEW
    • DUAL-TONEMULTI- FREQUENCY (DTMF)• Dual-tone multi-frequency (DTMF) signaling is used for telecommunication signaling over analog telephone lines in the voice-frequency band between telephone handsets and other communications devices and the switching center. The version of DTMF used for telephone tone dialing is known by the trademarked term Touch-Tone (canceled March 13, 1984), and is standardized by ITU-T Recommendation• As a method of in-band signaling, DTMF tones were also used by cable television broadcasters to indicate the start and stop times of local commercial insertion points during station breaks for the benefit of cable companies. Until better out-of-band signaling equipment was developed in the 1990s, fast, unacknowledged, and loud DTMF tone sequences could be heard during the commercial breaks of cable channels in the United States and elsewhere.
    • TELEPHONE KEYPAD• The contemporary keypad is laid out in a 3x4 grid, although the original DTMF keypad had an additional column for four now-defunct menu selector keys. When used to dial a telephone number, pressing a single key will produce a pitch consisting of two simultaneous pure tone sinusoidal frequencies. The row in which the key appears determines the low frequency, and the column determines the high frequency. For example, pressing the key will result in a sound composed of both a 697 and a 1209 hertz (Hz) tone. The original keypads had levers inside, so each button activated two contacts. The multiple tones are the reason for calling the system multi frequency. These tones are then decoded by the switching center to determine which key was pressed
    • DTMF Keypad Frequencies 1209 Hz 1336 Hz 1477 Hz 1633 Hz697 Hz 1 2 3 A770 Hz 4 5 6 B852 Hz 7 8 9 C941 Hz * 0 # D
    • CONTROLLER DIAGRAM
    • PROJECT IMPLEMENTATION• METHOD will Information We will Identify risk areas then we audit• we will Identify lobbyists for project• Our prime goal is to secure funds by making a business case, Project description, alternative options• We will Scope the system, Compare vendors and systems; even site visits.• Project governance structures, Folder hierarchy, Budgets.• Diagrammatic display of project• Implementation by which we mean to create the equipment• Will do the final review for accuracy