SlideShare a Scribd company logo
1 of 6
Download to read offline
Overcoming Commercial, Design & Technical Challenges in
   Engineering Floating Liquefaction & Regasification Projects

23 - 25 October 2012 Seoul, South Korea • www.offshorelngasia.com

Unprecedented Representation From Owners, Operators,
EPCs And Subcontractors Involved In Floating Liquefaction
          and Floating Regasification Projects




                                                                                15 80
                                                                                    OVER                  OVER
 Featuring the Following Experts:

                Trym Tveitness                          Heinz Bauer
                CTO                                     Vice President
                FLEX LNG                                LINDE AG                PRESENTATIONS          ATTENDEES



                Ari Adji
                Director – Technical
                & Operations
                PT NUSANTARA
                                                        Ki il Nam
                                                        Principal Engineer
                                                        HYUNDAI HEAVY
                                                                                ONE ONE
                                                                                   ALL NEW            DRILLED DOWN
                REGAS                                   INDUSTRIES                EXCLUSIVE           LNG TRANSFER
                                                                                  SITE VISIT             SYSTEM
                                                                                                       WORKSHOP



     FOR THE FIRST TIME EVER:
     AN EXCLUSIVE SITE VISIT!!!
                               HOST: KOGAS
                               VENUE: INCHEON LNG TERMINAL, SEOUL




Researched and developed by:           Sponsors:                                    Media Partners:




   “Very good project status and advancement updates with excellent qualified speakers.”
                                                   Director, Hess Corporation
The Complete Line Up of
Industry Highlights                                                                World Reowned experts:
Petronas of Malaysia approves FLNG project                                                 Trym Tveitness                       Jason Waldie
Petronas of Malaysia has reached a final investment decision for                           CTO,                                 Associate Director,
floating LNG project in Sarawak which it aims to bring online in 2015.                     FLEX LNG                             DOUGLAS
The company is assessing the feasibility of constructing a second LNG                                                           WESTWOOD
import terminal in southern Johor, and a third terminal in Lahad Datu                      Heinz Bauer
                                                                                           Vice President,                      Gerard van der
in east Malaysia is set to be commissioned in 2015.
                                                                                           LINDE AG                             Weijde
5 June 2012, www.lngworldnews.com
                                                                                                                                Project Manager,
                                                                                           Ki il Nam                            Structural Dynamics,
Hyundai develops FLNG model                                                                Principal Engineer,                  TNO SCIENCE AND
                                                                                           HYUNDAI HEAVY                        INDUSTRY
Hyundai Heavy Industries, the world’s largest shipbuilder, has just
                                                                                           INDUSTRIES
announced completion their Floating Liquefied Natural Gas Plant
                                                                                                                                Kazuo Watanabe
(FLNG) concept model. Designed in association with Germany’s                               Ari Adji                             Project Manager, IHI
industrial gases and engineering company Linde AG, the offshore                            Director – Technical                 MARINE UNITED
facility will, theoretically, be able to produce, liquify and offload                      & Operations,
natural gas directly to an LNG carrier.                                                    PT NUSANTARA                         Simon Davies
5 January 2012, www.gCaptain.com                                                           REGAS                                Director, ANZ
For more details, refer to Day One, 14:25 session.
                                                                                           Chris Mole                           Tony Regan
FMC Technologies awarded offshore loading                                                  Global                               Principal Consultant,
                                                                                           Hydrocarbons                         TRI ZEN
arms systems contract                                                                      Select Director,                     CONSULTANTS
FMC Technologies, Inc. /quotes/zigman/282674/quotes/nls/fti FTI                            WORLEYPARSONS
+0.96% announced today that it has signed an agreement with                                                                     Senior
Technip France, on behalf of the Technip Samsung Consortium (TSC),                         Daniel C S Ahn                       Representative,
to supply offshore loading arm systems as part of the Shell Prelude                        Technical Advisor,                   CAMERON PROCESS
Floating Liquefied Natural Gas (FLNG) project                                              SAMSUNG                              SYSTEMS
12 May 2012, www.marketwatch.com                                                           ENGINEERING
                                                                                                                                Chie Wakatsuki
                                                                                           Dinar Indriana                       Deputy Division Chief,
Excelerate Energy to build first floating                                                  Khoiriah                             JAPAN BANK FOR
liquefaction export facility in the United States                                          Senior Project                       INTERNATIONAL
                                                                                           Coordinator, Planning                COOPERATION
Excelerate Energy® L.P. is moving forward with the development of the                      & Coordination
first floating liquefaction facility in the United States utilizing its Floating           Department, INPEX                    Senior
Liquefaction Storage Offloading vessel (FLSO(TM)) technology. The Lavaca                   MASELA LTD,                          Representative, ABS
Bay LNG project will be located in Port Lavaca, situated between Galveston
and Corpus Christi on the Texas Gulf Coast, and will be designed to export                 Kristian Utkilen           Anthony Lavery
liquefied natural gas (LNG) to markets worldwide by 2017.                                  Managing Director,         Director – Natural
15 May 2012, www.marketwatch.com                                                           KANFA ARAGON               Resources and Energy,
For more updates, visit the Download Centre at                                             AS                         SOCIETE GENERALE
www.offshorelngasia.com.

Indonesia’s first FSRU to start operations soon                                    Invest Your Marketing Bucks Wisely!!
Indonesia’s first LNG receiving and regasification terminal is                     It is obvious that Australasia will forge ahead with floating
expected to start operation soon as Regas Satu Floating Storage and                LNG and FSRU developments and prospects for such projects
Regasification Unit (FSRU) set sail from Jurong Shipyard in Singapore              in this region have never been hotter than it is today. With
heading to Jakarta Bay. The FSRU release ceremony was conducted                    more proposed projects approaching the FID stage, the time is
by the President Director of PT Pertamina (Persero) Karen Agustiawan,              perfect to profile your brand in the industry.
acting as the President Commissioner of PT Nusantara Regas, which is
the operator of Regas Satu FSRU.
12 April 2012, www.worldmaritimenews.com                                           What can you do?
For more details, refer to Day Two, 09:10 session.
                                                                                   Thought Leadership at the Conference: Email us at
  “This event has a comprehensive insight on                                       sponsorship@iqpc.com.sg if you have an innovative
                                                                                   solution for the offshore LNG industry.
  FLNG economics, engineering and construction
  challenges and future construction.”                                             An Exclusive Exhibition Space: Display your solutions and
                                                                                   reach out to the industry with an exclusive stand for your
                                       Country Manager, HALLIBURTON
                                                                                   company. Email us at sponsorship@iqpc.com.sg to reserve
                                                                                   an exhibition slot.
                                                                                   IQPC also encourages creative ideas to get commercially associated
                                                                                   with the event to enhance your branding. Call us at 65 6722 9388
                                                                                   or email sponsorship@iqpc.com.sg to explore how.




               T: +65 6722 9388 F: +65 6720 3804 E: enquiry@iqpc.com.sg W: www.offshorelngasia.com
23rd October, 2012 | 09:00 – 15:00                                       23rd October, 2012 | 16:00 – 19:00

 SITE VISIT A:                                                              WORKSHOP B:
 INCHEON LNG TERMINAL                                                       A COMPREHENSIVE ANALYSIS OF
 HOSTED BY: KOGAS                                                           TECHNOLOGIES AVAILABLE FOR
                                                                            FLOATING LNG TRANSFER SYSTEMS


                                                                         Rationale:
                                                                         A safe and reliable method of transferring the LNG product from the FLNG
                                                                         vessel to a tanker is a critical requirement. The use of flexible hoses is an
 About the Facility:                                                     option considered by many of the proposed projects as it is believed to
                                                                         allow operations to be performed under severe environmental conditions.
 The Korea Gas Corporation (KOGAS) completed their LNG                   However, this is not the only option being reviewed in the industry. This
 terminal in Incheon, South Korea in mid-2002. The Incheon               workshop will analyse the various transfer systems available for offloading
 LNG terminal is one of the biggest in the world and began its           LNG and discuss in-depth the merits and demerits of each of them.
 operation with three storage tanks (each 100,000m³) and 360t/
 hour of regasification capacity in 1996.
                                                                         Discussion Points:
 In order to meet increased LNG demand, the terminal has                 16:00 - 17:30: Highlighting the lessons learned from predicting the
 been continuously expanded ever since. The terminal now                 mechanical behavior and qualification of LNG transfer hoses
 operates 22 sets of LNG storage tanks – ten above-ground
 full containment tanks and 12 in-ground tanks – with a total            17:30 - 18:15: Outlining the various factors to be considered before
 storage capacity of three million cubic metres. Two of the 12 in-       the choice and implementation of an LNG transfer system
 ground tanks, with a capacity of 200,000m³, were constructed
 by Hyundai Engineering Company (HEC) as part of a further               18:15 - 19:00: Providing an insight into technical considerations for
 round of expansion. They were opened in June 2009.                      safe and reliable transfer systems with optimal performance
 Currently, the terminal has a 3,870t/hour regasification capacity.      Top 3 Benefits of Attending:
 It was able to provide the Seoul metropolitan area with 14 million      1.	Narrow down on the right choice of offloading system for your
 tonnes per annum (Mtpa) of natural gas by 2004.                         	 offshore LNG project
 (www.hydrocarbons-technology.com)                                       2.	Understand how to mitigate the impact of adverse environmental
                                                                         	 effects on your offloading system
 Why Should You Attend?                                                  3.	Improve the overall safety of your FLNG vessel

 1.	 Find out the strategies to mitigate challenges encountered                      Workshop Leader:
 	during operation of both underground and above the                                 Gerard van der Weijde
 	 ground storage tanks                                                              Project Manager, Structural Dynamics
 2.	 Cognize the operational characteristics of the double                           TNO SCIENCE AND INDUSTRY
 	 berth system                                                          As the Project Manager for structural dynamics with TNO, Gerard is extensively involved in
 3.	 Fathom the safe tie-in mechanisms in place to ensure                research surrounding reliable transfer systems. He is an expert in predicting the behaviour
                                                                         of composite hoses as an offloading solution for offshore and onshore applications.
 	 hassle free operation                                                 Gerard will bring all his expertise into this workshop to evoke a constructive discussion on
 4.	 Analyse vaporisation optimisation procedures using                  all the critical factors that determine the choice of an efficient offloading solution.
 	 low seawater temperature during winter
 5.	 Track the future expansion plans of the facility                            The post conference workshops alone at last year’s
                                                                               summit attracted close to 40 attendees. Make sure you
                                                                                register early for the workshops when registering for
 Why is the Incheon Terminal Extraordinary?                                                      the main conference.
 An extraordinary fact about this terminal is that KOGAS has built
 this man-made island, solely for the purpose of this terminal. The
 Incheon terminal is about eight km apart from the coast and has                                                 Benefit from the
 10 in-ground LNG tanks for the same purpose.
                                                                                                                 Knowledge Library;
 The decision to place the terminal away from the coast is to avoid                                              Access the Download
 opposition by residents who do not want to see a terminal at                                                    Centre Today!
 their back yard.
                                                                         Kristian Utkilen, Managing Director for Kanfa Aragon AS, José Esteve
 Why Should You Register Early?                                          Otegui, Marine Division Manager of Bureau Veritas, Joe Rosseau, Director
                                                                         of ABS SINGAPORE & Dr. Heinz Bauer VP Technology for LNG, from Linde
 Please note that the site visit is open to the first 25 registrations   Engineering examine the topside engineering challenges for FLNG projects.
 only. Email enquiry@iqpc.com.sg to book your seat.
 Facilitated By: Senior Representative, KOGAS                            Download this and many other interesting articles, white papers and
                                                                         past presentations www.offshorelngasia.com



            T: +65 6722 9388 F: +65 6720 3804 E: enquiry@iqpc.com.sg W: www.offshorelngasia.com
CONFERENCE AGENDA DAY ONE, 24TH OCTOBER, 2012
08:30	 Registration Begins                                                                                 Jason Waldie, Associate Director, DOUGLAS WESTWOOD
                                                                                                           Jason heads DW’s Singapore office from where he is responsible for the
09:00	 Welcome Address from the Chairman                                                                   firm’s activities throughout the Asia/ Australasia region. Previously he spent
                                                                                                           four years as Group Head of Business Development for a major energy
                                                                                               industry information services provider in Singapore. Earlier posts were with Samsung
                     FLNG Project Updates                                                      Corporation and Asiana Airlines in Seoul, Korea. Jason holds a Bachelor’s Degree in
                                                                                               Economics and Political Science, an MBA from the University of Melbourne and a
09:10 	 Overcoming Commercial and Technical Challenges to
                                                                                               Master of Energy Management from the Institut Français du Pétrole; ESCP Europe;
	       Implement an FLNG Project
                                                                                               Handelshøyskolen BI joint programme.
	       •	 Providing an update on upcoming FLEX’s upcoming FLNG
		 projects, projected timelines for FID etc
	       •	 Drawing synergies between small scale and large scale                               14:25	 Unfolding the Recently Announced Hyundai Model to
		 FLNG projects                                                                               	      Implement an FLNG
	       •	 Developing a cost based approach towards these projects to                          	      •	 Outlining the major advancements and technology used in the
		 establish the best FLNG solution                                                            		 Hyundai FLNG model
                                                                                               	      •	 Providing a comparison of the indigenous Hyundai model and
            Trym Tveitness, CTO, FLEX LNG                                                      		 how it differs from the other existing models
            Trym Tveitnes is a co-founder of FLEX LNG and serves as the company’s              	      •	 Detailing the efficient and economical production capabilities
            CTO. Prior to FLEX LNG Mr. Tveitnes held positions in Liquiline, Höegh             		 that exist in the model
            LNG and Det Norske Veritas. His work experience include onshore small
scale gas infrastructure, development of floating regas terminals and Arctic LNG                           Ki il Nam, Principal Research Engineer,
transportation concepts as well as technology qualification related to large LNG carriers
                                                                                                           HYUNDAI HEAVY INDUSTRIES
and floating LNG terminals. Mr. Tveitnes holds a degree in Naval Architecture and a
PhD in Hydrodynamics from the University of Glasgow.                                                       Kiil Nam has worked with Hyundai Heavy Industries for 18 years as a
                                                                                                           research engineer for offshore system engineering and a process engineer
09:55	 Achieving Stakeholder Engagement with the Local Government                              participating in commercial projects. He is the leader of R&D projects to develop
	      to Ensure Hassle Free Implementation of FLNG Projects                                   revolutionary systems including, the FSRU, the LNG carriers, the offshore oil & gas
	      •	 Highlighting key milestones achieved during the Masela FLNG                          production platform, and FPSO. He is involved in the development of the Hyundai
		 project implementation                                                                      FLNG with Linde AG and the development of the Korean FLNG with KOGAS.
	      •	 Discussing the challenges in managing government relations for
		 the Masela FLNG Project and strategies to overcome the same                                 15:10 	 Networking Break
	      •	 Outlining the engagement structure, approach and decision-
		 making process in the project from exploration to date                                       Offshore LNG Technical Considerations
            Dinar Indriana Khoiriah, Senior Project Coordinator,                               15:40	 Session Reserved for Cameron Process Systems
            Planning & Coordination Department, INPEX MASELA LTD
             INPEX acquired a 100% participating interest in the Masela Block in                                        Senior Representative,
             November 1998 through a public tender conducted by the Indonesian                                          CAMERON PROCESS SYSTEMS
Government. The Abadi-1 exploratory well was drilled in 2000 and confirmed the
presence of gas and condensate. In September 2008, based on the results of Pre-FEED
of a floating LNG, a development plan was submitted to the Indonesian Government               16:25 	 Establishing Key Considerations to Perform an Effective
and approval in principle was granted. After a thirdparty evaluation, approval for the         	       FLNG Topside FEED Study
plan of development (POD-1) was granted in December 2010 for commencement of                   	       •	 Detailing WorleyParson’s role in performing a topside FEED study
LNG production of 2.5 million tons/year. www.inpex.co.jp                                       		 for the FLNG project in PNG
                                                                                               	       •	 Discussing the key challenges when choosing the right technology
10:40	 Networking Break                                                                        		 for topsides in FLNG
                                                                                               	       •	 Addressing the main roadblocks in ensuring smooth transition to
    Specific Focus on Korean Shipyards                                                         		 FID for the project

11:10	 Analysing the Current Capabilities of Korean Shipyards to                                           Chris Mole, Global Hydrocarbons Select Director, WORLEYPARSONS
	      Benefit from Opportunities Presented by Floating LNG Projects                                      Chris has over twenty two years oil and gas industry experience and
	      •	 Outlining the technological readiness of the Korean shipyards to                                is currently the Global Hydrocarbons Director for Select, the specialist
		 cash in on the FLNG boom                                                                               front end division of WorleyParsons which provides advice to clients
	      •	 Detailing the transformation needed in existing infrastructure to                    on project viability, assessment and selection. Within WorleyParsons he has
		 cope with the demands of the floating liquefaction projects                                 previously held a number of positions including Director of LNG and FLNG and
	      •	 Highlighting the challenging aspects of FLNG fabrication with                        General Manager of Process and Technology. He has spent over ten years in the
		 respect to hull and topsides                                                                LNG industry working on projects ranging from conceptual, first of a kind, studies
                                                                                               on floating and GBS based LNG, through to revamping of existing LNG plants and
            Daniel C S Ahn, Technical Advisor, SAMSUNG ENGINEERING                             development of conventional large scale grass roots facilities
             Over the previous thirty years, Dr Ahn has held several executive management
             positions within the offshore and plant industries. Dr Ahn was the founder of     17:10	 Studying the Effects of Multi - Composite Hoses to Achieve
             today’s Offshore and Engineering Division at Hyundai Heavy Industries Co.,
Ltd. (“HHI”) and was instrumental in the growth of HHI that led to it become a leading         	      Sale and Reliable LNG Transfer System Operations
contractor in the worldwide offshore oil & gas industry and President of HHI until 2005. Dr.   	      •	 Outlining the advantages of composite hoses as a method of
Ahn holds a B.S. from Korea Maritime University, an M.S. in Meteorology, an M.S. in Naval      		 LNG transfer over other proposed systems
Architecture and a Ph.D. in Ocean Engineering, all from MIT.                                   	      •	 Discussing the ability of composite hoses to provide safe
                                                                                               		 operations under severe operational conditions
11:55 	 Session Reserved for ABS                                                               	      •	 Analysing the mechanical and flow behavior at ambient and
                                                                                               		 cryogenic operating conditions
            Senior Representative, ABS
                                                                                                           Gerard van der Weijde, Project Manager, Structural Dynamics,
12:40 	 Networking Lunch                                                                                   TNO SCIENCE AND INDUSTRY
                                                                                                          Reliable transfer systems are a key element in developing floating
13:40 	 Monetising Stranded Gas - What Does the Offshore LNG                                              LNG and the small scale LNG market. Multi-composite hoses may
	       Future Offer?                                                                          prove to be a reliable and cost effective solution for offshore, near- and on-shore
	       •	 Providing an overview of the global FLNG market progress and                        applications. TNO, the Dutch contract research organization, has executed an
		 how it impacts FLNG developments                                                            extensive test program on the multi-composite hose of Gutteling B.V. for Ship-to-
	       •	 Determining the key stakeholders, prospects and developments                        Ship (STS) LNG transfers.
		 in the FLNG market
	       •	 Assessing the increasing growth of the FSRU industry in Asia                        17:50 	 Close of Conference




                 T: +65 6722 9388 F: +65 6720 3804 E: enquiry@iqpc.com.sg W: www.offshorelngasia.com
CONFERENCE AGENDA DAY TWO, 25TH OCTOBER, 2012
08:30 Registration Begins                                                                  12:40	 Lunch Break

09:00 Welcome Address from the Chairman
                                                                                                    Financing Trends for Offshore
         FSRUs / Bridging the Onshore –                                                                     LNG Projects
                 Offshore Divide                                                           13:40	   Highlighting Key Drivers To Create a Bankable
                                                                                           	        Offshore LNG Project
09:10	 Mapping the FSRU Sector To Understand Indonesian                                    	        •	 Plotting what goes behind financing an offshore LNG project
	      FSRU Growth Opportunities                                                           	        •	 Addressing the risk factors involved in FLNG financing mechanisms
	      •	 Reviewing the rationale for choosing FSRU over an onshore facility               	        •	 Analysing how lucrative is financing the burgeoning FSRU market
	      •	 Identifying potential issues during project development
	      •	 What are the strategies in place to tackle LNG supply and gas offtake?                       Simon Davies, Director, ANZ
	      •	 Learning from a successful project case study: The West Java                                  Simon joined ANZ in 2011 to head the group’s Offshore Oil & Gas
		 FSRU project                                                                                         Infrastructure business. Simon has 23 years’ experience in structured leasing
                                                                                                        and asset financing, structured capital markets and capital structuring both
                                                                                           as a principle and as an advisor to bank and corporate clients in Europe and Asia.
           Ari Adji, Director – Technical & Operations, PT NUSANTARA REGAS
           Ari Adji obtained his Bachelor’s degree in Physical Engineering at Bandung
           Institute of Technology in 1983. Prior to joining PT Nusantara Regas, He        14:25	 Integrating FLNG into the LNG Chain to Establish
           has served as Operation Manager in Badak LNG Plant, Bontang, East               	      Commercial Viability of Projects
Kalimantan, where he spent most of his career there. He has held various technical         	      •	 Discussing the recent outburst in the number of proposed
and managerial positions in plant maintenance, logistics planning & controlling, project   		 FLNG projects
development & execution and plant operation within PT Badak NGL Bontang. Ari Adji          	      •	 Will FLNG projects be able to usurp the conventional ones to
joined PT Nusantara Regas as Technical & Operation Director in May 2010.                   	      	 address increasing LNG demand?
                                                                                           	      •	 Predicting the role of LNG as a marine fuel and discussing 	
09:55	 Plotting the Onshore to Offshore Transformation to                                  		 associated challenge
	      Expedite Efficient Offshore LNG Projects                                            	      •	 Analysing the role of FLNG in the field of LNG bunkering
	      •	 Highlighting the lessons learnt from existing onshore liquefaction
		 and regasification facilities                                                                       	Tony Regan, Principal Consultant, TRI ZEN LTD
	      •	 Analysing what goes behind transforming the expertise available                              Tony has extensive international oil and gas experience, much of it gained
		 onshore into a floating concept                                                                     during 25 years with Shell International and more recently with Nexant
	      •	 Revealing Linde’s experiences in the successfully implementing                               where he was a Principal responsible for their gas practices in Asia. With
		 offshore liquefaction technologies                                                      Shell he developed several new businesses and held senior management positions in
                                                                                           Europe and Asia. He was first introduced to the world of LNG in the early 1990’s when
           Heinz Bauer, Vice President, LINDE AG                                           he held the position of Vice President, Energy with Shell Korea and arranged the first
           After graduation at the Technical University Munich as PhD in Applied           spot cargoes of LNG into Korea from Australia and Brunei and facilitated discussions
           Physics, Dr Heinz Bauer joined Linde Engineering 30 years ago. He               that led to KOGAS becoming a lead customer in Oman LNG.
           worked in different positions in process design as well as sales and
marketing. His focus has been on all kind of cryogenic gas processing including            15:10	 Networking Break
cracked gases, synthesis gas, refinery off-gases and of course natural gas. Heinz has
contributed with many papers to international conferences and is co-author of the          15:40	 Evoking a Financing Dialogue for Evaluating Funding
book ‘Industrial Gases Processing’. He holds several patents in the area of cryogenic      	      Structures for FLNG
gas processing. Presently he is responsible as Vice President for technology of LNG &      	      •	 Analysing the pros, the cons and the opportunities provided by
gas processing plants
                                                                                           		 floating LNG finanacing
                                                                                           	      •	 Will FLNG follow the oil FPSO contracting model? How big an
10:40	 Networking Break                                                                    		 impact does the commercial framework have on financing
                                                                                           		 such projects
Offshore LNG Technical Considerations                                                      	      •	 Discussing the post financial crisis resurgence in the banking market
                                                                                           	      •	 Overcoming the challenges posed by production risks and
11:10	 Choosing the Right Offshore Liquefaction Model for                                  		 redeployment risks in funding floating LNG projects
	      Cost Efficient FLNG Design
	      •	 Addressing the importance of removal of CO2 and sulphur in an                    Anthony Lavery, Director – Natural Resources and Energy,
		 LNG liquefaction facility                                                               SOCIETE GENERALE
	      •	 Highlighting the various liquefaction mechanisms available                       Anthony is currently responsible for marketing and transaction execution in energy -
		 including the nitrogen dual expander liquefaction process                               oil & gas and power - and energy infrastructure project financings. He was previously
                                                                                           responsible for project finance, limited recourse debt and mezzanine finance;
	      •	 Achieving a tradeoff between the vessel size and that of the
                                                                                           infrastructure debt and equity and M&A types of transactions in the energy, utilities,
		 process plant and the corresponding impact of these changes on                          natural resources and other infrastructure sectors with National Australia Bank.
		 the shipyards
	      •	 Highlighting the technologies available to assist the                            16:25	 Introducing Export Credit Approaches to Secure
		 liquefaction process                                                                    	      Financing for Offshore LNG Projects
                                                                                           	      •	 Introducing the modus operandi of JBIC financing for
           Kristian Utkilen, Managing Director, KANFA ARAGON                               		 offshore projects
            A joint venture comprising WorleyParsons Europe Limited, U.K., and
                                                                                           	      •	 Providing an overview of the scope of intervention of all lenders
            KANFA Aragon AS, Norway, was selected by Samsung Heavy Industries
            Co., Ltd. in Korea to perform a field specific Front End Engineering Design    		 and borrowers in export credit financing schemes
(FEED) for FLEX LNG’s fixed floating LNG production project for InterOil Corporation       	      •	 Discussing JBIC’s experiences with financing FSRUs and FLNGs
and Pacific LNG Operations for operations in Papua New Guinea.
                                                                                                       Chie Wakatsuki, Deputy Division Chief, JAPAN BANK FOR
11:55	 Designing Efficient Cargo Containment Systems for                                               INTERNATIONAL COOPERATION
	      Floating LNG Projects                                                                         Ms. Wakatsuki is JBIC’s Deputy Division Chief of Marine and Aerospace
	      •	 Discussing the pros and cons of the IHI SPB technology                                     Finance Department and is based in Tokyo. Prior to joining JBIC in 2007,
	      •	 Devising a robust design of cargo containment systems in FLNG                    Ms. Wakatsuki worked for the Industrial Revitalization Corporation of Japan as a fund
                                                                                           manager. Ms. Wakatsuki holds an MBA from Johns Hopkins University, U.S.
		 projects and highlighting the accompanying challenges
	      •	 Developing strategies to mitigate sloshing effects in the SPB
                                                                                           17:10	 Close of Conference
		 technology containment systems
	      •	 Highlighting the ways to ensure ease of operability and ease of
		 maintenance in FLNG cargo containment systems
                                                                                              “A comprehensive FLNG event. Excellent speakers
           Kazuo Watanabe, Project Manager, IHI MARINE UNITED
           Kazuo WATANABE joined IHI in 1977 and has been working in designing                and brainstorming technical discussions.”
           and development activity for IHI-SPB type LNGC and LPG-FSO/FPSO
           offshore floating structure. Kazuo has been an active presenter in
conferences and shows worldwide on promoting the advantages of the IHI SPB
                                                                                                                                               VP-FLNG, BW OFFSHORE
technology for offshore LNG projects


                 T: +65 6722 9388 F: +65 6720 3804 E: enquiry@iqpc.com.sg W: www.offshorelngasia.com
5 WAYS TO REGISTER
                                                                                                                        Online	:	 www.offshorelngasia.com
                                                                                                                        Email	:	 enquiry@iqpc.com.sg
                                                                                                                        Phone	:	 (65) 6722 9388
                                                                                                                        Fax	 :	 (65) 6720 3804
                                                                                                                        Post	 :	 IQPC Worldwide Pte Ltd, 61 Robinson Road #14-01 Robinson Centre
                                                                                                                        		 Singapore 068893

                                                                                                                            TEAM DISCOUNTS
                                                                                                                        IQPC recognises the value of learning in teams. Group bookings at the same time
     Conference: 23 - 25 October 2012                                                                                   from the same company receive these discounts:
     Venue: Seoul, South Korea                                www.offshorelngasia.com
                                                                                                                            3 or more 7%            5 or more 10%      8 or more 15%
My booking code is: 16494.009                                                                                           This offer is exclusive of the early bird discount. Call us for a special discount rate for
Please complete in BLOCK CAPITALS as information is used to produce delegate badges.                                    teams of 10 and above. Not applicable to workshop(s) only bookings.
Please photocopy for multiple bookings.
                                                                                                                            CONFERENCE DOCUMENTATION & AUDIO CD
Please do not remove this label even if it is not addressed to you.
                                                                                                                          	 I am registering as a delegate, please send me an extra set of Conference
                                                                                                                        	 Documentation with Audio CD with a SGD100 discount: SGD699.
                                                                                                                          	 I cannot attend the event, please send me the Conference Documentation and
                                                                                                                        	 Audio CD at SGD799.
                                                                                                                          	 I cannot attend the event, please send me the Conference Documentation
                                                                                                                        	 only at SGD549.
                                                                                                                        Orders without immediate payment or credit card details will incur a
                                                                                                                        processing fee of SGD99 per order.
                                                                                                                        (N.B. Advance orders will determine whether or not this conference will be recorded -
                                                                                                                        Please enclose payment with your order.)
                                                                                                                        Any custom duties & taxes imposed on the shipment of order/s shall be borne
                                                                                                                        by the recipient.

                                                                                                                        IQPC CANCELLATION, POSTPONEMENT AND SUBSTITUTION POLICY
                                                                                                                        • You may substitute delegates at any time by providing reasonable advance notice to IQPC.
                                                                                                                        • For any cancellations received in writing not less than eight (8) days prior to the conference,
                                                                                                                        you will receive a 90% credit to be used at another IQPC conference which must occur
                                                                                                                        within one year from the date of issuance of such credit. An administration fee of 10% of
                                                                                                                        the contract fee will be retained by IQPC for all permitted cancellations. No credit will be
                                                                                                                        issued for any cancellations occurring within seven (7) days (inclusive) of the conference. •
*Register and Pay in full no later than 10 August 2012 to qualify for the Early Bird Discount.                          In the event that IQPC postpones an event for any reason and the delegate is unable or
**Prices below are quoted in USD$                                                                                       unwilling to attend in on the rescheduled date, you will receive a credit for 100% of the
                                                                                                                        contract fee paid. You may use this credit for another IQPC event to be mutually agreed
                                                                                                                        with IQPC, which must occur within one year from the date of postponement. • Except
                                                                                                                        as specified above, no credits will be issued for cancellations. There are no refunds given
                                                                                                                        under any circumstances. • IQPC is not responsible for any loss or damage as a result of
                                                                                                                        a substitution, alteration or cancellation/postponement of an event. IQPC shall assume no
                                                                  EARLY BIRD                           REGULAR          liability whatsoever in the event this conference is cancelled, rescheduled or postponed due
                                                                                                                        to a fortuitous event, Act of God, unforeseen occurrence or any other event that renders
                                                       Book and Pay before 10 August 2012               PRICE           performance of this conference impracticable, illegal or impossible. For purposes of this
                                                                                                                        clause, a fortuitous event shall include, but not be limited to: war, fire, labor strike, extreme
                                                                                                                        weather or other emergency. • Please note that while speakers and topics were confirmed at
 Primary Market                                                                                                         the time of publishing, circumstances beyond the control of the organizers may necessitate
                                                                                                                        substitutions, alterations or cancellations of the speakers and/or topics. As such, IQPC reserves
 Conference Only                                                 2,999 (save 400)                         3,399         the right to alter or modify the advertised speakers and/or topics if necessary without any
                                                                                                                        liability to you whatsoever. Any substitutions or alterations will be updated on our web page
 Conference +      Site tour A or        Workshop B              3,799 (save 699)                   4,250 (save 248)    as soon as possible.

 Conference + Site tour A + Workshop B                          4,399 (save 1,198)                  4,950 (save 647)    DISCOUNTS: All ‘Early Bird’ Discounts require payment at time of registration and before the
                                                                                                                        cutoff date in order to receive any discount. Any discounts offered whether by IQPC (including
                                                                                                                        team discounts) must also require payment at the time of registration. All discount offers cannot
 Vendor Market                                                           –                                  –           be combined with any other offer.
 Conference Only                                                 3,899 (save 400)                         4,299         YOUR DETAILS: Please email our Database Manager at enquiry@iqpc.com.sg and inform them
                                                                                                                        of any incorrect details which will be amended accordingly.
 Conference +      Site tour A or        Workshop B              4,650 (save 748)                   5,150 (save 248)    DATA PROTECTION: Personal data is gathered in accordance with the Data Protection Act
                                                                                                                        1984. Your data may be passed to other companies who wish to communicate with you offers
 Conference + Site tour A + Workshop B                          5,251 (save 1,247)                  5,850 (save 647)    related to your business activities. If you do not wish to receive these offers, please tick the
                                                                                                                        box below.
                                                                                                                          	 Please do not pass my information to any third party.
*Discounts DO NOT apply to workshop(s)-only bookings
*Singapore companies, please add prevailing GST.                                                                            PAYMENT TERMS
*Registrations without immediate payment or credit card details will incur a processing fee of SGD99 per registration   Registrations/orders received without immediate payment or credit card details will incur a
                                                                                                                        processing fee of SGD99 per registration/order. Payment is due in full upon receipt of invoice. Full
                                                                                                                        payment prior to the event is mandatory for attendance.
                                                                                                                        IQPC WORLDWIDE PTE. LTD.
                                                                                                                        Company Registration No: 199702288Z
 DELEGATE DETAILS                                                                                                       Copyright@ 2010 IQPC Worldwide Pte. Ltd. All rights reserved. This brochure may not be copied,
                                                                                                                        photocopied, reproduced, translated, or converted to any electronic or machine-readable form in
Please photocopy for additional delegates and/or delegate with different addresses                                      whole or in part without prior written approval of IQPC Worldwide Pte. Ltd

Salutation: Mr         Mrs              Ms     Dr     Other                                                                 PAYMENT METHOD
                                                                                                                        PAYMENT POLICY: Payment is due in full upon booking. Full payment is mandatory
Name:                                                                                                                   for admission to the event.
                                                                                                                          	 By Cheque/Bank Draft: Made payable to IQPC Worldwide Pte Ltd
Email:	Telephone:                                                                                                         	 By Direct Transfer: Please quote 16494.009 with remittance advice
                                                                                                                        	 IQPC Bank details:
Job Title: 	                                                        Department:                                         	 Account Name: IQPC Worldwide Pte Ltd
                                                                                                                        	 Bank Number: 7232          Account Number: 260-085824-690
                                                                                                                        	 Swift Code: HSBCSGSG
Organisation	                                                       Nature of Business                                  	 The Hong Kong and Shanghai Banking Corporation, 21 Collyer Quay, 	
                                                                                                                        	 #08-01 HSBC Building, Singapore 049320
Address:				                                                                                                            	 Correspondent Bank: HSBC Bank USA, New York
                                                                                                                        	 Swift Code: MRMDUS33
                                                                                                                        	 All bank charges to be borne by payer: Please ensure that IQPC receives
Country:                                                                                                                	 the full invoiced amount.
                                                                                                                           	 By Credit Card:
Postcode:	Fax:                                                                                                          	 Please debit my credit card:     Visa      MasterCard        Amex
                                                                                                                        	
                                                                                                                        	    Card No: 			
Approving manager’s name:           	                               Job Title:
                                                                                                                        	    Expiry Date:		                                 (MM/YY)	
Address
                                                                                                                        	    Name of Cardholder:	

                                                                                                                        	    Signature:
                                                                                                                        	    (Signature is Mandatory)


                                                                                                                            VENUE & ACCOMODATION
                                                                                                                        To be confirmed

Signature:	                                                         Date:
                                                                                                                        Hotel accommodation and travel costs are not included in the registration fee. A reduced
I agree to IQPC’s payment terms and cancellation policy. Please note: If you have already registration and              corporate room rate will be arranged for attendees at this conference. To take advantage of
                                                                                                                        this special rate, please process the hotel room reservation form provided upon confirmation
acknowledgement before the conference, please call us to confirm your booking.
                                                                                                                        of your attendance



                    T: +65 6722 9388 F: +65 6720 3804 E: enquiry@iqpc.com.sg W: www.offshorelngasia.com

More Related Content

What's hot

Nuclear construction us11_v6
Nuclear construction us11_v6Nuclear construction us11_v6
Nuclear construction us11_v6Dean Murphy
 
3rd Annual Nuclear Construction Summit
3rd Annual Nuclear Construction Summit3rd Annual Nuclear Construction Summit
3rd Annual Nuclear Construction Summitetully
 
Apresentação Pontus de Laval | OIS 2011 | Painel: Cooperação internacional e ...
Apresentação Pontus de Laval | OIS 2011 | Painel: Cooperação internacional e ...Apresentação Pontus de Laval | OIS 2011 | Painel: Cooperação internacional e ...
Apresentação Pontus de Laval | OIS 2011 | Painel: Cooperação internacional e ...Allagi Open Innovation Services
 
Mm360 Media Package
Mm360 Media PackageMm360 Media Package
Mm360 Media Packagetepaddock
 
Innovations™ Magazine April - June 2014
Innovations™ Magazine April - June 2014 Innovations™ Magazine April - June 2014
Innovations™ Magazine April - June 2014 T.D. Williamson
 

What's hot (6)

Nuclear construction us11_v6
Nuclear construction us11_v6Nuclear construction us11_v6
Nuclear construction us11_v6
 
3rd Annual Nuclear Construction Summit
3rd Annual Nuclear Construction Summit3rd Annual Nuclear Construction Summit
3rd Annual Nuclear Construction Summit
 
Apresentação Pontus de Laval | OIS 2011 | Painel: Cooperação internacional e ...
Apresentação Pontus de Laval | OIS 2011 | Painel: Cooperação internacional e ...Apresentação Pontus de Laval | OIS 2011 | Painel: Cooperação internacional e ...
Apresentação Pontus de Laval | OIS 2011 | Painel: Cooperação internacional e ...
 
PLIM & PLEX CONFERENCE
PLIM & PLEX CONFERENCEPLIM & PLEX CONFERENCE
PLIM & PLEX CONFERENCE
 
Mm360 Media Package
Mm360 Media PackageMm360 Media Package
Mm360 Media Package
 
Innovations™ Magazine April - June 2014
Innovations™ Magazine April - June 2014 Innovations™ Magazine April - June 2014
Innovations™ Magazine April - June 2014
 

Similar to 9th offshore lng brochure

Global Floating LNG Summit 2011 - Agenda
Global Floating LNG Summit 2011 - AgendaGlobal Floating LNG Summit 2011 - Agenda
Global Floating LNG Summit 2011 - AgendaGlobalFLNGSummit
 
Flng - Tapping the potential of floating lng
Flng - Tapping the potential of floating lng Flng - Tapping the potential of floating lng
Flng - Tapping the potential of floating lng GlobalFLNGSummit
 
HYUNDAI MIPO DOCKYARD_HHI_SPECIAL SHIPBUILDING
HYUNDAI MIPO DOCKYARD_HHI_SPECIAL SHIPBUILDINGHYUNDAI MIPO DOCKYARD_HHI_SPECIAL SHIPBUILDING
HYUNDAI MIPO DOCKYARD_HHI_SPECIAL SHIPBUILDINGDRP Joint
 
Small GTL Joint Industry Project
Small GTL Joint Industry ProjectSmall GTL Joint Industry Project
Small GTL Joint Industry ProjectCyril Stahl
 
Wind Lift Brochure Web
Wind Lift Brochure   WebWind Lift Brochure   Web
Wind Lift Brochure Webgm330
 
Ian Ahrens CV Jan2016
Ian Ahrens CV Jan2016Ian Ahrens CV Jan2016
Ian Ahrens CV Jan2016Ian Ahrens
 
Npc reff 0910_neil_douglas
Npc reff 0910_neil_douglasNpc reff 0910_neil_douglas
Npc reff 0910_neil_douglasngdouglas
 
New base 12 june 2018 energy news issue 1180 by khaled al awadi
New base 12 june 2018 energy news issue   1180  by khaled al awadiNew base 12 june 2018 energy news issue   1180  by khaled al awadi
New base 12 june 2018 energy news issue 1180 by khaled al awadiKhaled Al Awadi
 
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projectsP07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projectsHabibie Razak, ACPE., AE
 
Hogan Greg 20100624
Hogan Greg 20100624Hogan Greg 20100624
Hogan Greg 20100624Greg Hogan
 
Offshore Operations Maintenance[2]
Offshore Operations Maintenance[2]Offshore Operations Maintenance[2]
Offshore Operations Maintenance[2]gm330
 
Future Offshore Foundations Web
Future Offshore Foundations WebFuture Offshore Foundations Web
Future Offshore Foundations Webgm330
 
6th Mobile Offshore Production Drilling Units call for papers 2017
6th Mobile Offshore Production Drilling Units call for papers 20176th Mobile Offshore Production Drilling Units call for papers 2017
6th Mobile Offshore Production Drilling Units call for papers 2017Jaquilyn Nicole Dela Pena
 

Similar to 9th offshore lng brochure (20)

Global Floating LNG Summit 2011 - Agenda
Global Floating LNG Summit 2011 - AgendaGlobal Floating LNG Summit 2011 - Agenda
Global Floating LNG Summit 2011 - Agenda
 
Flng - Tapping the potential of floating lng
Flng - Tapping the potential of floating lng Flng - Tapping the potential of floating lng
Flng - Tapping the potential of floating lng
 
HYUNDAI MIPO DOCKYARD_HHI_SPECIAL SHIPBUILDING
HYUNDAI MIPO DOCKYARD_HHI_SPECIAL SHIPBUILDINGHYUNDAI MIPO DOCKYARD_HHI_SPECIAL SHIPBUILDING
HYUNDAI MIPO DOCKYARD_HHI_SPECIAL SHIPBUILDING
 
Small GTL Joint Industry Project
Small GTL Joint Industry ProjectSmall GTL Joint Industry Project
Small GTL Joint Industry Project
 
Wind Lift Brochure Web
Wind Lift Brochure   WebWind Lift Brochure   Web
Wind Lift Brochure Web
 
Vedam Designs. Company Profile
Vedam Designs. Company ProfileVedam Designs. Company Profile
Vedam Designs. Company Profile
 
London Conference
London ConferenceLondon Conference
London Conference
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
Dutta Resume
Dutta ResumeDutta Resume
Dutta Resume
 
Ian Ahrens CV Jan2016
Ian Ahrens CV Jan2016Ian Ahrens CV Jan2016
Ian Ahrens CV Jan2016
 
Steve banks woodside browse ukti aog presentation
Steve banks   woodside browse ukti aog presentationSteve banks   woodside browse ukti aog presentation
Steve banks woodside browse ukti aog presentation
 
Npc reff 0910_neil_douglas
Npc reff 0910_neil_douglasNpc reff 0910_neil_douglas
Npc reff 0910_neil_douglas
 
New base 12 june 2018 energy news issue 1180 by khaled al awadi
New base 12 june 2018 energy news issue   1180  by khaled al awadiNew base 12 june 2018 energy news issue   1180  by khaled al awadi
New base 12 june 2018 energy news issue 1180 by khaled al awadi
 
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projectsP07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
 
Hogan Greg 20100624
Hogan Greg 20100624Hogan Greg 20100624
Hogan Greg 20100624
 
Offshore Operations Maintenance[2]
Offshore Operations Maintenance[2]Offshore Operations Maintenance[2]
Offshore Operations Maintenance[2]
 
ATB PE Portfolio2016
ATB PE Portfolio2016ATB PE Portfolio2016
ATB PE Portfolio2016
 
Future Offshore Foundations Web
Future Offshore Foundations WebFuture Offshore Foundations Web
Future Offshore Foundations Web
 
6th Mobile Offshore Production Drilling Units call for papers 2017
6th Mobile Offshore Production Drilling Units call for papers 20176th Mobile Offshore Production Drilling Units call for papers 2017
6th Mobile Offshore Production Drilling Units call for papers 2017
 
shell_0
shell_0shell_0
shell_0
 

More from Asia IQPC

14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement SummitAsia IQPC
 
Dredging brochure
Dredging brochureDredging brochure
Dredging brochureAsia IQPC
 
Fatca brochure
Fatca brochureFatca brochure
Fatca brochureAsia IQPC
 
Offshore RMB brochure
Offshore RMB brochureOffshore RMB brochure
Offshore RMB brochureAsia IQPC
 
Asset integrity 2012 pdfw9(6pp)
Asset integrity 2012 pdfw9(6pp)Asset integrity 2012 pdfw9(6pp)
Asset integrity 2012 pdfw9(6pp)Asia IQPC
 
Desktop copy gdi 2012
Desktop copy gdi 2012Desktop copy gdi 2012
Desktop copy gdi 2012Asia IQPC
 

More from Asia IQPC (6)

14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit
 
Dredging brochure
Dredging brochureDredging brochure
Dredging brochure
 
Fatca brochure
Fatca brochureFatca brochure
Fatca brochure
 
Offshore RMB brochure
Offshore RMB brochureOffshore RMB brochure
Offshore RMB brochure
 
Asset integrity 2012 pdfw9(6pp)
Asset integrity 2012 pdfw9(6pp)Asset integrity 2012 pdfw9(6pp)
Asset integrity 2012 pdfw9(6pp)
 
Desktop copy gdi 2012
Desktop copy gdi 2012Desktop copy gdi 2012
Desktop copy gdi 2012
 

Recently uploaded

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCRalexsharmaa01
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 

Recently uploaded (20)

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 

9th offshore lng brochure

  • 1. Overcoming Commercial, Design & Technical Challenges in Engineering Floating Liquefaction & Regasification Projects 23 - 25 October 2012 Seoul, South Korea • www.offshorelngasia.com Unprecedented Representation From Owners, Operators, EPCs And Subcontractors Involved In Floating Liquefaction and Floating Regasification Projects 15 80 OVER OVER Featuring the Following Experts: Trym Tveitness Heinz Bauer CTO Vice President FLEX LNG LINDE AG PRESENTATIONS ATTENDEES Ari Adji Director – Technical & Operations PT NUSANTARA Ki il Nam Principal Engineer HYUNDAI HEAVY ONE ONE ALL NEW DRILLED DOWN REGAS INDUSTRIES EXCLUSIVE LNG TRANSFER SITE VISIT SYSTEM WORKSHOP FOR THE FIRST TIME EVER: AN EXCLUSIVE SITE VISIT!!! HOST: KOGAS VENUE: INCHEON LNG TERMINAL, SEOUL Researched and developed by: Sponsors: Media Partners: “Very good project status and advancement updates with excellent qualified speakers.” Director, Hess Corporation
  • 2. The Complete Line Up of Industry Highlights World Reowned experts: Petronas of Malaysia approves FLNG project Trym Tveitness Jason Waldie Petronas of Malaysia has reached a final investment decision for CTO, Associate Director, floating LNG project in Sarawak which it aims to bring online in 2015. FLEX LNG DOUGLAS The company is assessing the feasibility of constructing a second LNG WESTWOOD import terminal in southern Johor, and a third terminal in Lahad Datu Heinz Bauer Vice President, Gerard van der in east Malaysia is set to be commissioned in 2015. LINDE AG Weijde 5 June 2012, www.lngworldnews.com Project Manager, Ki il Nam Structural Dynamics, Hyundai develops FLNG model Principal Engineer, TNO SCIENCE AND HYUNDAI HEAVY INDUSTRY Hyundai Heavy Industries, the world’s largest shipbuilder, has just INDUSTRIES announced completion their Floating Liquefied Natural Gas Plant Kazuo Watanabe (FLNG) concept model. Designed in association with Germany’s Ari Adji Project Manager, IHI industrial gases and engineering company Linde AG, the offshore Director – Technical MARINE UNITED facility will, theoretically, be able to produce, liquify and offload & Operations, natural gas directly to an LNG carrier. PT NUSANTARA Simon Davies 5 January 2012, www.gCaptain.com REGAS Director, ANZ For more details, refer to Day One, 14:25 session. Chris Mole Tony Regan FMC Technologies awarded offshore loading Global Principal Consultant, Hydrocarbons TRI ZEN arms systems contract Select Director, CONSULTANTS FMC Technologies, Inc. /quotes/zigman/282674/quotes/nls/fti FTI WORLEYPARSONS +0.96% announced today that it has signed an agreement with Senior Technip France, on behalf of the Technip Samsung Consortium (TSC), Daniel C S Ahn Representative, to supply offshore loading arm systems as part of the Shell Prelude Technical Advisor, CAMERON PROCESS Floating Liquefied Natural Gas (FLNG) project SAMSUNG SYSTEMS 12 May 2012, www.marketwatch.com ENGINEERING Chie Wakatsuki Dinar Indriana Deputy Division Chief, Excelerate Energy to build first floating Khoiriah JAPAN BANK FOR liquefaction export facility in the United States Senior Project INTERNATIONAL Coordinator, Planning COOPERATION Excelerate Energy® L.P. is moving forward with the development of the & Coordination first floating liquefaction facility in the United States utilizing its Floating Department, INPEX Senior Liquefaction Storage Offloading vessel (FLSO(TM)) technology. The Lavaca MASELA LTD, Representative, ABS Bay LNG project will be located in Port Lavaca, situated between Galveston and Corpus Christi on the Texas Gulf Coast, and will be designed to export Kristian Utkilen Anthony Lavery liquefied natural gas (LNG) to markets worldwide by 2017. Managing Director, Director – Natural 15 May 2012, www.marketwatch.com KANFA ARAGON Resources and Energy, For more updates, visit the Download Centre at AS SOCIETE GENERALE www.offshorelngasia.com. Indonesia’s first FSRU to start operations soon Invest Your Marketing Bucks Wisely!! Indonesia’s first LNG receiving and regasification terminal is It is obvious that Australasia will forge ahead with floating expected to start operation soon as Regas Satu Floating Storage and LNG and FSRU developments and prospects for such projects Regasification Unit (FSRU) set sail from Jurong Shipyard in Singapore in this region have never been hotter than it is today. With heading to Jakarta Bay. The FSRU release ceremony was conducted more proposed projects approaching the FID stage, the time is by the President Director of PT Pertamina (Persero) Karen Agustiawan, perfect to profile your brand in the industry. acting as the President Commissioner of PT Nusantara Regas, which is the operator of Regas Satu FSRU. 12 April 2012, www.worldmaritimenews.com What can you do? For more details, refer to Day Two, 09:10 session. Thought Leadership at the Conference: Email us at “This event has a comprehensive insight on sponsorship@iqpc.com.sg if you have an innovative solution for the offshore LNG industry. FLNG economics, engineering and construction challenges and future construction.” An Exclusive Exhibition Space: Display your solutions and reach out to the industry with an exclusive stand for your Country Manager, HALLIBURTON company. Email us at sponsorship@iqpc.com.sg to reserve an exhibition slot. IQPC also encourages creative ideas to get commercially associated with the event to enhance your branding. Call us at 65 6722 9388 or email sponsorship@iqpc.com.sg to explore how. T: +65 6722 9388 F: +65 6720 3804 E: enquiry@iqpc.com.sg W: www.offshorelngasia.com
  • 3. 23rd October, 2012 | 09:00 – 15:00 23rd October, 2012 | 16:00 – 19:00 SITE VISIT A: WORKSHOP B: INCHEON LNG TERMINAL A COMPREHENSIVE ANALYSIS OF HOSTED BY: KOGAS TECHNOLOGIES AVAILABLE FOR FLOATING LNG TRANSFER SYSTEMS Rationale: A safe and reliable method of transferring the LNG product from the FLNG vessel to a tanker is a critical requirement. The use of flexible hoses is an About the Facility: option considered by many of the proposed projects as it is believed to allow operations to be performed under severe environmental conditions. The Korea Gas Corporation (KOGAS) completed their LNG However, this is not the only option being reviewed in the industry. This terminal in Incheon, South Korea in mid-2002. The Incheon workshop will analyse the various transfer systems available for offloading LNG terminal is one of the biggest in the world and began its LNG and discuss in-depth the merits and demerits of each of them. operation with three storage tanks (each 100,000m³) and 360t/ hour of regasification capacity in 1996. Discussion Points: In order to meet increased LNG demand, the terminal has 16:00 - 17:30: Highlighting the lessons learned from predicting the been continuously expanded ever since. The terminal now mechanical behavior and qualification of LNG transfer hoses operates 22 sets of LNG storage tanks – ten above-ground full containment tanks and 12 in-ground tanks – with a total 17:30 - 18:15: Outlining the various factors to be considered before storage capacity of three million cubic metres. Two of the 12 in- the choice and implementation of an LNG transfer system ground tanks, with a capacity of 200,000m³, were constructed by Hyundai Engineering Company (HEC) as part of a further 18:15 - 19:00: Providing an insight into technical considerations for round of expansion. They were opened in June 2009. safe and reliable transfer systems with optimal performance Currently, the terminal has a 3,870t/hour regasification capacity. Top 3 Benefits of Attending: It was able to provide the Seoul metropolitan area with 14 million 1. Narrow down on the right choice of offloading system for your tonnes per annum (Mtpa) of natural gas by 2004. offshore LNG project (www.hydrocarbons-technology.com) 2. Understand how to mitigate the impact of adverse environmental effects on your offloading system Why Should You Attend? 3. Improve the overall safety of your FLNG vessel 1. Find out the strategies to mitigate challenges encountered Workshop Leader: during operation of both underground and above the Gerard van der Weijde ground storage tanks Project Manager, Structural Dynamics 2. Cognize the operational characteristics of the double TNO SCIENCE AND INDUSTRY berth system As the Project Manager for structural dynamics with TNO, Gerard is extensively involved in 3. Fathom the safe tie-in mechanisms in place to ensure research surrounding reliable transfer systems. He is an expert in predicting the behaviour of composite hoses as an offloading solution for offshore and onshore applications. hassle free operation Gerard will bring all his expertise into this workshop to evoke a constructive discussion on 4. Analyse vaporisation optimisation procedures using all the critical factors that determine the choice of an efficient offloading solution. low seawater temperature during winter 5. Track the future expansion plans of the facility The post conference workshops alone at last year’s summit attracted close to 40 attendees. Make sure you register early for the workshops when registering for Why is the Incheon Terminal Extraordinary? the main conference. An extraordinary fact about this terminal is that KOGAS has built this man-made island, solely for the purpose of this terminal. The Incheon terminal is about eight km apart from the coast and has Benefit from the 10 in-ground LNG tanks for the same purpose. Knowledge Library; The decision to place the terminal away from the coast is to avoid Access the Download opposition by residents who do not want to see a terminal at Centre Today! their back yard. Kristian Utkilen, Managing Director for Kanfa Aragon AS, José Esteve Why Should You Register Early? Otegui, Marine Division Manager of Bureau Veritas, Joe Rosseau, Director of ABS SINGAPORE & Dr. Heinz Bauer VP Technology for LNG, from Linde Please note that the site visit is open to the first 25 registrations Engineering examine the topside engineering challenges for FLNG projects. only. Email enquiry@iqpc.com.sg to book your seat. Facilitated By: Senior Representative, KOGAS Download this and many other interesting articles, white papers and past presentations www.offshorelngasia.com T: +65 6722 9388 F: +65 6720 3804 E: enquiry@iqpc.com.sg W: www.offshorelngasia.com
  • 4. CONFERENCE AGENDA DAY ONE, 24TH OCTOBER, 2012 08:30 Registration Begins Jason Waldie, Associate Director, DOUGLAS WESTWOOD Jason heads DW’s Singapore office from where he is responsible for the 09:00 Welcome Address from the Chairman firm’s activities throughout the Asia/ Australasia region. Previously he spent four years as Group Head of Business Development for a major energy industry information services provider in Singapore. Earlier posts were with Samsung FLNG Project Updates Corporation and Asiana Airlines in Seoul, Korea. Jason holds a Bachelor’s Degree in Economics and Political Science, an MBA from the University of Melbourne and a 09:10 Overcoming Commercial and Technical Challenges to Master of Energy Management from the Institut Français du Pétrole; ESCP Europe; Implement an FLNG Project Handelshøyskolen BI joint programme. • Providing an update on upcoming FLEX’s upcoming FLNG projects, projected timelines for FID etc • Drawing synergies between small scale and large scale 14:25 Unfolding the Recently Announced Hyundai Model to FLNG projects Implement an FLNG • Developing a cost based approach towards these projects to • Outlining the major advancements and technology used in the establish the best FLNG solution Hyundai FLNG model • Providing a comparison of the indigenous Hyundai model and Trym Tveitness, CTO, FLEX LNG how it differs from the other existing models Trym Tveitnes is a co-founder of FLEX LNG and serves as the company’s • Detailing the efficient and economical production capabilities CTO. Prior to FLEX LNG Mr. Tveitnes held positions in Liquiline, Höegh that exist in the model LNG and Det Norske Veritas. His work experience include onshore small scale gas infrastructure, development of floating regas terminals and Arctic LNG Ki il Nam, Principal Research Engineer, transportation concepts as well as technology qualification related to large LNG carriers HYUNDAI HEAVY INDUSTRIES and floating LNG terminals. Mr. Tveitnes holds a degree in Naval Architecture and a PhD in Hydrodynamics from the University of Glasgow. Kiil Nam has worked with Hyundai Heavy Industries for 18 years as a research engineer for offshore system engineering and a process engineer 09:55 Achieving Stakeholder Engagement with the Local Government participating in commercial projects. He is the leader of R&D projects to develop to Ensure Hassle Free Implementation of FLNG Projects revolutionary systems including, the FSRU, the LNG carriers, the offshore oil & gas • Highlighting key milestones achieved during the Masela FLNG production platform, and FPSO. He is involved in the development of the Hyundai project implementation FLNG with Linde AG and the development of the Korean FLNG with KOGAS. • Discussing the challenges in managing government relations for the Masela FLNG Project and strategies to overcome the same 15:10 Networking Break • Outlining the engagement structure, approach and decision- making process in the project from exploration to date Offshore LNG Technical Considerations Dinar Indriana Khoiriah, Senior Project Coordinator, 15:40 Session Reserved for Cameron Process Systems Planning & Coordination Department, INPEX MASELA LTD INPEX acquired a 100% participating interest in the Masela Block in Senior Representative, November 1998 through a public tender conducted by the Indonesian CAMERON PROCESS SYSTEMS Government. The Abadi-1 exploratory well was drilled in 2000 and confirmed the presence of gas and condensate. In September 2008, based on the results of Pre-FEED of a floating LNG, a development plan was submitted to the Indonesian Government 16:25 Establishing Key Considerations to Perform an Effective and approval in principle was granted. After a thirdparty evaluation, approval for the FLNG Topside FEED Study plan of development (POD-1) was granted in December 2010 for commencement of • Detailing WorleyParson’s role in performing a topside FEED study LNG production of 2.5 million tons/year. www.inpex.co.jp for the FLNG project in PNG • Discussing the key challenges when choosing the right technology 10:40 Networking Break for topsides in FLNG • Addressing the main roadblocks in ensuring smooth transition to Specific Focus on Korean Shipyards FID for the project 11:10 Analysing the Current Capabilities of Korean Shipyards to Chris Mole, Global Hydrocarbons Select Director, WORLEYPARSONS Benefit from Opportunities Presented by Floating LNG Projects Chris has over twenty two years oil and gas industry experience and • Outlining the technological readiness of the Korean shipyards to is currently the Global Hydrocarbons Director for Select, the specialist cash in on the FLNG boom front end division of WorleyParsons which provides advice to clients • Detailing the transformation needed in existing infrastructure to on project viability, assessment and selection. Within WorleyParsons he has cope with the demands of the floating liquefaction projects previously held a number of positions including Director of LNG and FLNG and • Highlighting the challenging aspects of FLNG fabrication with General Manager of Process and Technology. He has spent over ten years in the respect to hull and topsides LNG industry working on projects ranging from conceptual, first of a kind, studies on floating and GBS based LNG, through to revamping of existing LNG plants and Daniel C S Ahn, Technical Advisor, SAMSUNG ENGINEERING development of conventional large scale grass roots facilities Over the previous thirty years, Dr Ahn has held several executive management positions within the offshore and plant industries. Dr Ahn was the founder of 17:10 Studying the Effects of Multi - Composite Hoses to Achieve today’s Offshore and Engineering Division at Hyundai Heavy Industries Co., Ltd. (“HHI”) and was instrumental in the growth of HHI that led to it become a leading Sale and Reliable LNG Transfer System Operations contractor in the worldwide offshore oil & gas industry and President of HHI until 2005. Dr. • Outlining the advantages of composite hoses as a method of Ahn holds a B.S. from Korea Maritime University, an M.S. in Meteorology, an M.S. in Naval LNG transfer over other proposed systems Architecture and a Ph.D. in Ocean Engineering, all from MIT. • Discussing the ability of composite hoses to provide safe operations under severe operational conditions 11:55 Session Reserved for ABS • Analysing the mechanical and flow behavior at ambient and cryogenic operating conditions Senior Representative, ABS Gerard van der Weijde, Project Manager, Structural Dynamics, 12:40 Networking Lunch TNO SCIENCE AND INDUSTRY Reliable transfer systems are a key element in developing floating 13:40 Monetising Stranded Gas - What Does the Offshore LNG LNG and the small scale LNG market. Multi-composite hoses may Future Offer? prove to be a reliable and cost effective solution for offshore, near- and on-shore • Providing an overview of the global FLNG market progress and applications. TNO, the Dutch contract research organization, has executed an how it impacts FLNG developments extensive test program on the multi-composite hose of Gutteling B.V. for Ship-to- • Determining the key stakeholders, prospects and developments Ship (STS) LNG transfers. in the FLNG market • Assessing the increasing growth of the FSRU industry in Asia 17:50 Close of Conference T: +65 6722 9388 F: +65 6720 3804 E: enquiry@iqpc.com.sg W: www.offshorelngasia.com
  • 5. CONFERENCE AGENDA DAY TWO, 25TH OCTOBER, 2012 08:30 Registration Begins 12:40 Lunch Break 09:00 Welcome Address from the Chairman Financing Trends for Offshore FSRUs / Bridging the Onshore – LNG Projects Offshore Divide 13:40 Highlighting Key Drivers To Create a Bankable Offshore LNG Project 09:10 Mapping the FSRU Sector To Understand Indonesian • Plotting what goes behind financing an offshore LNG project FSRU Growth Opportunities • Addressing the risk factors involved in FLNG financing mechanisms • Reviewing the rationale for choosing FSRU over an onshore facility • Analysing how lucrative is financing the burgeoning FSRU market • Identifying potential issues during project development • What are the strategies in place to tackle LNG supply and gas offtake? Simon Davies, Director, ANZ • Learning from a successful project case study: The West Java Simon joined ANZ in 2011 to head the group’s Offshore Oil & Gas FSRU project Infrastructure business. Simon has 23 years’ experience in structured leasing and asset financing, structured capital markets and capital structuring both as a principle and as an advisor to bank and corporate clients in Europe and Asia. Ari Adji, Director – Technical & Operations, PT NUSANTARA REGAS Ari Adji obtained his Bachelor’s degree in Physical Engineering at Bandung Institute of Technology in 1983. Prior to joining PT Nusantara Regas, He 14:25 Integrating FLNG into the LNG Chain to Establish has served as Operation Manager in Badak LNG Plant, Bontang, East Commercial Viability of Projects Kalimantan, where he spent most of his career there. He has held various technical • Discussing the recent outburst in the number of proposed and managerial positions in plant maintenance, logistics planning & controlling, project FLNG projects development & execution and plant operation within PT Badak NGL Bontang. Ari Adji • Will FLNG projects be able to usurp the conventional ones to joined PT Nusantara Regas as Technical & Operation Director in May 2010. address increasing LNG demand? • Predicting the role of LNG as a marine fuel and discussing 09:55 Plotting the Onshore to Offshore Transformation to associated challenge Expedite Efficient Offshore LNG Projects • Analysing the role of FLNG in the field of LNG bunkering • Highlighting the lessons learnt from existing onshore liquefaction and regasification facilities Tony Regan, Principal Consultant, TRI ZEN LTD • Analysing what goes behind transforming the expertise available Tony has extensive international oil and gas experience, much of it gained onshore into a floating concept during 25 years with Shell International and more recently with Nexant • Revealing Linde’s experiences in the successfully implementing where he was a Principal responsible for their gas practices in Asia. With offshore liquefaction technologies Shell he developed several new businesses and held senior management positions in Europe and Asia. He was first introduced to the world of LNG in the early 1990’s when Heinz Bauer, Vice President, LINDE AG he held the position of Vice President, Energy with Shell Korea and arranged the first After graduation at the Technical University Munich as PhD in Applied spot cargoes of LNG into Korea from Australia and Brunei and facilitated discussions Physics, Dr Heinz Bauer joined Linde Engineering 30 years ago. He that led to KOGAS becoming a lead customer in Oman LNG. worked in different positions in process design as well as sales and marketing. His focus has been on all kind of cryogenic gas processing including 15:10 Networking Break cracked gases, synthesis gas, refinery off-gases and of course natural gas. Heinz has contributed with many papers to international conferences and is co-author of the 15:40 Evoking a Financing Dialogue for Evaluating Funding book ‘Industrial Gases Processing’. He holds several patents in the area of cryogenic Structures for FLNG gas processing. Presently he is responsible as Vice President for technology of LNG & • Analysing the pros, the cons and the opportunities provided by gas processing plants floating LNG finanacing • Will FLNG follow the oil FPSO contracting model? How big an 10:40 Networking Break impact does the commercial framework have on financing such projects Offshore LNG Technical Considerations • Discussing the post financial crisis resurgence in the banking market • Overcoming the challenges posed by production risks and 11:10 Choosing the Right Offshore Liquefaction Model for redeployment risks in funding floating LNG projects Cost Efficient FLNG Design • Addressing the importance of removal of CO2 and sulphur in an Anthony Lavery, Director – Natural Resources and Energy, LNG liquefaction facility SOCIETE GENERALE • Highlighting the various liquefaction mechanisms available Anthony is currently responsible for marketing and transaction execution in energy - including the nitrogen dual expander liquefaction process oil & gas and power - and energy infrastructure project financings. He was previously responsible for project finance, limited recourse debt and mezzanine finance; • Achieving a tradeoff between the vessel size and that of the infrastructure debt and equity and M&A types of transactions in the energy, utilities, process plant and the corresponding impact of these changes on natural resources and other infrastructure sectors with National Australia Bank. the shipyards • Highlighting the technologies available to assist the 16:25 Introducing Export Credit Approaches to Secure liquefaction process Financing for Offshore LNG Projects • Introducing the modus operandi of JBIC financing for Kristian Utkilen, Managing Director, KANFA ARAGON offshore projects A joint venture comprising WorleyParsons Europe Limited, U.K., and • Providing an overview of the scope of intervention of all lenders KANFA Aragon AS, Norway, was selected by Samsung Heavy Industries Co., Ltd. in Korea to perform a field specific Front End Engineering Design and borrowers in export credit financing schemes (FEED) for FLEX LNG’s fixed floating LNG production project for InterOil Corporation • Discussing JBIC’s experiences with financing FSRUs and FLNGs and Pacific LNG Operations for operations in Papua New Guinea. Chie Wakatsuki, Deputy Division Chief, JAPAN BANK FOR 11:55 Designing Efficient Cargo Containment Systems for INTERNATIONAL COOPERATION Floating LNG Projects Ms. Wakatsuki is JBIC’s Deputy Division Chief of Marine and Aerospace • Discussing the pros and cons of the IHI SPB technology Finance Department and is based in Tokyo. Prior to joining JBIC in 2007, • Devising a robust design of cargo containment systems in FLNG Ms. Wakatsuki worked for the Industrial Revitalization Corporation of Japan as a fund manager. Ms. Wakatsuki holds an MBA from Johns Hopkins University, U.S. projects and highlighting the accompanying challenges • Developing strategies to mitigate sloshing effects in the SPB 17:10 Close of Conference technology containment systems • Highlighting the ways to ensure ease of operability and ease of maintenance in FLNG cargo containment systems “A comprehensive FLNG event. Excellent speakers Kazuo Watanabe, Project Manager, IHI MARINE UNITED Kazuo WATANABE joined IHI in 1977 and has been working in designing and brainstorming technical discussions.” and development activity for IHI-SPB type LNGC and LPG-FSO/FPSO offshore floating structure. Kazuo has been an active presenter in conferences and shows worldwide on promoting the advantages of the IHI SPB VP-FLNG, BW OFFSHORE technology for offshore LNG projects T: +65 6722 9388 F: +65 6720 3804 E: enquiry@iqpc.com.sg W: www.offshorelngasia.com
  • 6. 5 WAYS TO REGISTER Online : www.offshorelngasia.com Email : enquiry@iqpc.com.sg Phone : (65) 6722 9388 Fax : (65) 6720 3804 Post : IQPC Worldwide Pte Ltd, 61 Robinson Road #14-01 Robinson Centre Singapore 068893 TEAM DISCOUNTS IQPC recognises the value of learning in teams. Group bookings at the same time Conference: 23 - 25 October 2012 from the same company receive these discounts: Venue: Seoul, South Korea www.offshorelngasia.com 3 or more 7% 5 or more 10% 8 or more 15% My booking code is: 16494.009 This offer is exclusive of the early bird discount. Call us for a special discount rate for Please complete in BLOCK CAPITALS as information is used to produce delegate badges. teams of 10 and above. Not applicable to workshop(s) only bookings. Please photocopy for multiple bookings. CONFERENCE DOCUMENTATION & AUDIO CD Please do not remove this label even if it is not addressed to you. I am registering as a delegate, please send me an extra set of Conference Documentation with Audio CD with a SGD100 discount: SGD699. I cannot attend the event, please send me the Conference Documentation and Audio CD at SGD799. I cannot attend the event, please send me the Conference Documentation only at SGD549. Orders without immediate payment or credit card details will incur a processing fee of SGD99 per order. (N.B. Advance orders will determine whether or not this conference will be recorded - Please enclose payment with your order.) Any custom duties & taxes imposed on the shipment of order/s shall be borne by the recipient. IQPC CANCELLATION, POSTPONEMENT AND SUBSTITUTION POLICY • You may substitute delegates at any time by providing reasonable advance notice to IQPC. • For any cancellations received in writing not less than eight (8) days prior to the conference, you will receive a 90% credit to be used at another IQPC conference which must occur within one year from the date of issuance of such credit. An administration fee of 10% of the contract fee will be retained by IQPC for all permitted cancellations. No credit will be issued for any cancellations occurring within seven (7) days (inclusive) of the conference. • *Register and Pay in full no later than 10 August 2012 to qualify for the Early Bird Discount. In the event that IQPC postpones an event for any reason and the delegate is unable or **Prices below are quoted in USD$ unwilling to attend in on the rescheduled date, you will receive a credit for 100% of the contract fee paid. You may use this credit for another IQPC event to be mutually agreed with IQPC, which must occur within one year from the date of postponement. • Except as specified above, no credits will be issued for cancellations. There are no refunds given under any circumstances. • IQPC is not responsible for any loss or damage as a result of a substitution, alteration or cancellation/postponement of an event. IQPC shall assume no EARLY BIRD REGULAR liability whatsoever in the event this conference is cancelled, rescheduled or postponed due to a fortuitous event, Act of God, unforeseen occurrence or any other event that renders Book and Pay before 10 August 2012 PRICE performance of this conference impracticable, illegal or impossible. For purposes of this clause, a fortuitous event shall include, but not be limited to: war, fire, labor strike, extreme weather or other emergency. • Please note that while speakers and topics were confirmed at Primary Market the time of publishing, circumstances beyond the control of the organizers may necessitate substitutions, alterations or cancellations of the speakers and/or topics. As such, IQPC reserves Conference Only 2,999 (save 400) 3,399 the right to alter or modify the advertised speakers and/or topics if necessary without any liability to you whatsoever. Any substitutions or alterations will be updated on our web page Conference + Site tour A or Workshop B 3,799 (save 699) 4,250 (save 248) as soon as possible. Conference + Site tour A + Workshop B 4,399 (save 1,198) 4,950 (save 647) DISCOUNTS: All ‘Early Bird’ Discounts require payment at time of registration and before the cutoff date in order to receive any discount. Any discounts offered whether by IQPC (including team discounts) must also require payment at the time of registration. All discount offers cannot Vendor Market – – be combined with any other offer. Conference Only 3,899 (save 400) 4,299 YOUR DETAILS: Please email our Database Manager at enquiry@iqpc.com.sg and inform them of any incorrect details which will be amended accordingly. Conference + Site tour A or Workshop B 4,650 (save 748) 5,150 (save 248) DATA PROTECTION: Personal data is gathered in accordance with the Data Protection Act 1984. Your data may be passed to other companies who wish to communicate with you offers Conference + Site tour A + Workshop B 5,251 (save 1,247) 5,850 (save 647) related to your business activities. If you do not wish to receive these offers, please tick the box below. Please do not pass my information to any third party. *Discounts DO NOT apply to workshop(s)-only bookings *Singapore companies, please add prevailing GST. PAYMENT TERMS *Registrations without immediate payment or credit card details will incur a processing fee of SGD99 per registration Registrations/orders received without immediate payment or credit card details will incur a processing fee of SGD99 per registration/order. Payment is due in full upon receipt of invoice. Full payment prior to the event is mandatory for attendance. IQPC WORLDWIDE PTE. LTD. Company Registration No: 199702288Z DELEGATE DETAILS Copyright@ 2010 IQPC Worldwide Pte. Ltd. All rights reserved. This brochure may not be copied, photocopied, reproduced, translated, or converted to any electronic or machine-readable form in Please photocopy for additional delegates and/or delegate with different addresses whole or in part without prior written approval of IQPC Worldwide Pte. Ltd Salutation: Mr Mrs Ms Dr Other PAYMENT METHOD PAYMENT POLICY: Payment is due in full upon booking. Full payment is mandatory Name: for admission to the event. By Cheque/Bank Draft: Made payable to IQPC Worldwide Pte Ltd Email: Telephone: By Direct Transfer: Please quote 16494.009 with remittance advice IQPC Bank details: Job Title: Department: Account Name: IQPC Worldwide Pte Ltd Bank Number: 7232 Account Number: 260-085824-690 Swift Code: HSBCSGSG Organisation Nature of Business The Hong Kong and Shanghai Banking Corporation, 21 Collyer Quay, #08-01 HSBC Building, Singapore 049320 Address: Correspondent Bank: HSBC Bank USA, New York Swift Code: MRMDUS33 All bank charges to be borne by payer: Please ensure that IQPC receives Country: the full invoiced amount. By Credit Card: Postcode: Fax: Please debit my credit card: Visa MasterCard Amex Card No: Approving manager’s name: Job Title: Expiry Date: (MM/YY) Address Name of Cardholder: Signature: (Signature is Mandatory) VENUE & ACCOMODATION To be confirmed Signature: Date: Hotel accommodation and travel costs are not included in the registration fee. A reduced I agree to IQPC’s payment terms and cancellation policy. Please note: If you have already registration and corporate room rate will be arranged for attendees at this conference. To take advantage of this special rate, please process the hotel room reservation form provided upon confirmation acknowledgement before the conference, please call us to confirm your booking. of your attendance T: +65 6722 9388 F: +65 6720 3804 E: enquiry@iqpc.com.sg W: www.offshorelngasia.com