• Like
Ilab 5 of 7
Upcoming SlideShare
Loading in...5
×
Uploaded on

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
31
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. CIS/339 iLab 5 of 7Your analysis phase of the SRS project went well and your team feels good about their Functional,Structural, and Behavioral models. You also discussed the result of your analysis with the School ofProsperity (SoP) administration and they seem to be in line with your analysis models.Now is the time to start the design phase where you generate specific directions forthe implementation of the system by the software development group. The first step in the designphase is to examine the SRS class diagram and to try to simplify its organization using a packagediagram. The package diagram ensures that classes that belong together are grouped into a singlepackage and thus simplify the development of these classes and their maintenance.Your deliverable this week is to generate a package diagram for the SRS system. Create a package diagram of the SRS system (to simplify the SRS class diagram) using the Rational Software Architect software on the Citrix iLab environment. Explain your work and the decisions you made to arrive at your proposed solution.CLICK HERE TO GET THE SOLUTION !!!!!!!!!