• Share
  • Email
  • Embed
  • Like
  • Private Content
Astute Case Study - HCM 9.1 Upgrade in Record Time for Fabless Semiconductor Company
 

Astute Case Study - HCM 9.1 Upgrade in Record Time for Fabless Semiconductor Company

on

  • 205 views

Semiconductor Company ...

Semiconductor Company
Gets Seamless System Upgrade In Record Time
PeopleSoft HCM system
needed to be upgraded
in 90 days
• Astute performs upgrade
along with required
customizations without
disrupting client operationsa

Statistics

Views

Total Views
205
Views on SlideShare
205
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Astute Case Study - HCM 9.1 Upgrade in Record Time for Fabless Semiconductor Company Astute Case Study - HCM 9.1 Upgrade in Record Time for Fabless Semiconductor Company Document Transcript

    • BackgroundCustomer RequirementsSemiconductor CompanyGets Seamless System Upgrade In Record Time• PeopleSoft HCM system needed to be upgraded in 90 days• Astute performs upgrade along with required customizations without disrupting client operationsa huge amount of data that needed to beintegrated into the new system. It also neededa large number of customizations and requiredthe new system to integrate seamlessly with itscurrent third party application.The challenge was to perform the requiredupgrade concurrently with the customizationsand the development phases within therequired timeframe – without disruptingBusiness-as-Usual.• PeopleSoft HCM Upgrade from 8.8 to 9.0 in 90 days.• Complete customizations of online and offline objects• Design of new interfaces for integrating “eTrack” (a 3rd party application) data with PeopleSoft HCM.A global leader in semiconductors withannual revenues of $2.5B was operatingunder a tight deadline. It needed toupgrade its PeopleSoft HCM 8.8 system toPeopleSoft 9.0 within a short timeframe.As the industry’s leading provider ofhardware system-on-a-chip and softwaresolutions to manufacturers of mobiledevices, computers and networkingequipment, the client understandably had
    • 4637 Chabot Drive, Suite 220 • Pleasanton • CA 94588• E: info@beAstute.com • T: 925.924.1400Astute recommended its proprietary 90-Day Accelerated Upgrade Methodologywhich leveraged both its Onsite andOffshore resources to:• Deliver a low-cost PeopleSoft HCM upgrade within the required timeframe.• Integrate the data from the 3rd party application, eTrack, into the PeopleSoft system using AE and CI programs• Apply complex customizations for implementing PeopleSoft 9.0 features and facilitating future upgradesThe client’s support systems made asmooth transition to the upgraded systemwith no downtime and no changes in theuser experience.The whole upgrade process was doneefficiently and seamlessly within therequired timeframe.This resulted in no losses for the clientdue to downtime, as the upgrade wasperformed without disrupting Business-as-Usual.Astute SolutionsCustomer BenefitsAbout Astute Business SolutionsThe client’s supportsystems made a smoothtransition to the upgradedsystem with no downtimeand no changes in theuser experience.Astute is dedicated to providing innovative solutions that address our clients’ unique andindustry-specific pain points. We specialize in extending the out-of-the-box functionality ofenterprise applications using our seamless add-on solutions so our clients can be spared theburden of messy and difficult-to-maintain customizations. Our unique combination of onsite,offsite and offshore resources enable us to provide best-in-class service and support to ourclients at significant cost savings.