Your SlideShare is downloading. ×
Summer training projects
Summer training projects
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Summer training projects

77

Published on

CETPA INFOTECH PVT LTD is one of the IT education and training service provider brands of India that is preferably working in 3 most important domains. It includes IT Training services, software and …

CETPA INFOTECH PVT LTD is one of the IT education and training service provider brands of India that is preferably working in 3 most important domains. It includes IT Training services, software and embedded product development and consulting services.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
77
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. 656152044MATLAB Based ProjectSr No. Project Name Duration1. Implementation OFDM 2-3 Days System Using MATLAB/Simulink2. Image Processing Using 2-3 Days Neural Network Toolbox3. Image Compression Using 2-3 Days Wavelet Toolbox4. Implementation of CDMA 2-3 Days System in MATLAB/SimulinkVHDL Based ProjectsSr No. Project Name Duration1. 16-Bit Microprocessor 4-5 Days2. Microcontroller Design 5-6 Days3. Simulation of Huffman Coding 5-6 Days4. Landline Switching System 4-5 Days Design5. UART Design 4-5 Days6. Neuron Design 4-5 Days7. Digital Clock Design 2-3 Days8. 16 Bit ALU Design 2-3 Days
  • 2. EMBEDDED SYSTEM PROJECT:S. no. Project name Duration1. Digital Bus 3-4 Days2. Metro Train Prototype 3-4 Days3. Automatic Lift System 3-4 Days4. Password Based Door 3-4 Days Locking System5. Electronic Voting Machine 3-4 Days6. Automatic Parking system 3-4 Days7. Temperature Sensing with 3-4 Days Buzzer7. Line follower robot 3-4 Days8. RF based robot 4-5 Days9. RF based electrical appliance 4-5 Days control10. DTMF base projects 4-5days11. Frequency measurement 3-4days12. Relay base projects 3-4days

×