13.mechanical design (apr 18)

609 views

Published on

13.mechanical design (Apr 18)
WALTER GONZALES ARNAO

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
609
On SlideShare
0
From Embeds
0
Number of Embeds
69
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

13.mechanical design (apr 18)

  1. 1. MECHANICAL DESIGN (Apr 18)STUDENT: WALTER HECTOR GONZALES ARNAO Fab academy 2012 UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
  2. 2. summary This week was held the election of the theme to work.AND WAS THE MTM (MACHINE MACHINE TO MAKE SNAP). FabTHAT BROUGHT THE CREATORS OF THE MTM (NADYA AND JHONATAN), IN WHICH LEFTINCOMPLETE FAB 7. THAT TIME IS WITH OXIDEhttp://mtm.cba.mit.edu/machines/mtm_snap-lock/ academyCLASS 13: mechanical design (Apr 18) UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
  3. 3. FIRST STEP. An inventory of the parts of MTM, the structureCLASS 13: mechanical design (Apr 18) Fab academy UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
  4. 4. STEP 2. Fab -the electronics was packaged, and agree to ordain importance -then proceeded to clean allCLASS 13: mechanical design (Apr 18) academy UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
  5. 5. Fab academySTEP 3.-once clean.-MTM is assembled UNIVERSIDAD NACIONAL DE INGENIERÍA CLASS 13: mechanical design (Apr 18) FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
  6. 6. Fab academySTEP 4.-the installation of shafts and guides was done carefully and accurately CLASS 13: mechanical design (Apr 18) UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
  7. 7. FabSTEP 5. academywas performed twice the installation of the axles..Failure in armed CLASS 13: mechanical design (Apr 18) UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
  8. 8. Fab academySTEP 6.- testing was performed moving partsCLASS 13: mechanical design (Apr 18) UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
  9. 9. Fab academySTEP 7.-was calibrated parties that support the moving parts 2012 UNIVERSIDAD NACIONAL DE INGENIERÍACLASS 13: mechanical design (Apr 18) FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
  10. 10. Fab academySTEP 8.was placed on the workpiece motor CellCLASS 13: mechanical design (Apr 18) 2012 UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
  11. 11. Fab academySTEP 9.-will place the last pieceCLASS 13: mechanical design (Apr 18) 2012 UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
  12. 12. UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES Fab academySTEP 10.because is employed tools they need experience 2012CLASS 13: mechanical design (Apr 18)
  13. 13. Fab academySTEP 11.-proceeds has to verify that all parts are complete to completethe assemblyPUSH 2012 UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE ARQUITECTURA, URBANISMO Y ARTESCLASS 13: mechanical design (Apr 18)
  14. 14. part 1 part 2 part 3 Fab academySTEP 12.-support were manufactured engines 1, 2 and 3-Diego was manufactured in acrylicCLASS 13: mechanical design (Apr 18) 2012 UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
  15. 15. Conclusions.1. coordinate schedules between the hours of work, was difficult.2. the assembly is difficult because of lack of parts. Fab3. el sistema de ensambles del MTM requiere 2 personas4. experience has helped to know in detail this machine academy STEP 13. MTM shows the armed CLASS 13: mechanical design (Apr 18) 2012 UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES

×