Slide 1: B angkok 7 th M ay 2008 Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 2: Work measurement of universal human body movements as per M aynard Operations S equence Technique (M OS T) A verage effective working time worldwide = 480 minutes Combines multi-skilling /multi-stage /multi-functional activity Pro-active production line speed and workload balancing F inal customer focused Continuous improvements in all areas of operations S elf inspection, self handling and self maintenance by operator team On going training to update and enhance skills and knowledge of all employees, for sustained continuous performance improvement E mployee empowerment for process ownership and personnel motivation Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 3: M.O.R.A.L. Cycle: 3.Map 4.Observe 5.Record 6.Analyze 7.Lean A bove cycle is automized using MDA T S oftware (Most Data A cquisition Tool). Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 4: B asic M OS T M ini M OS T Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 5: Non-intrusive measurement of work brings knowledge without stress Through knowledge, factual decisions and improvements are made and control exercised … does not require a stop watch for manual process measurement . .. does not require performance rating … can be applied at design and concept stage of a new product, before production begins ... encourages improvements by motivating personnel They represent the sequence of events that occurs when an object is moved or a tool is used by an operator Predefined sequence models represent different types of activities: General M ove (moved freely through space) Controlled M ove (movement restricted; attached or in contact) Tool Use (using common hand tools) Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 6: S ub Operations for S ewing Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 7: Once processing time has been calculated for each sequence, optimization can begin: ◦ Change tools positioning to limit operator movement ◦ Rationalize supplies and spare parts to stop walking ◦ Change workflow to compress time needed for completing work Workflow can be automatically recalculated based on an unlimited number of parameters ◦ Operator instructions sheet is printed ◦ Complete production line becomes auto-adaptative and workload balanced Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 8: Crank Shaft Machining Before After No. of Work Centers 20 20 Process Operations 17 17 No. of Operators 17 10 Multi-Machine % 118 % 200 % Max. No. of Machines by One Operator 3 3 CW: Content of Work (Minutes) 52.17 LCW: Lean Content of Work (Minutes) 41.8 Line Speed 15.1 11.82 Production Quantity per Shift (465 Mins) 30 39 Productivity Improvement 121 % Duration for Study 5 Days Duration for Implementation 30 Days Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 9: Present M ethod and layout M anpower : 6 Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 10: New method and layout M anpower : 2 Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 11: ◦ Typical Through Put Time : Few Days to M onths Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 12: It is very difficult to apply traditional work measurement tools and technique in long cycle operations and to obtain reliable data Using computerized systems and knowledge of processes combined with technical specifications along with floor layout, one can easily measure any amount of work involved, with no limited parameters Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 13: Possible characteristics: ◦ 1. Each Product changes as per customer requirement ◦ 2. Defined sets of product and part variety Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 14: > 4000 variety of products B ase template products selected, 20 products represented the others for pilot study On the basis of these 20 products auto routing of remaining 4000+ products was completed within a week Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 15: At one of World’s largest manufacturer of Electronic Passive Components 1. Communication to all for General A wareness of M OS T. 2. Training to all employees & A pplicator Training. 3. Process M apping and Elemental data collection. 4. V alidation of elements by applicators. 5. A ctual Implementation. 6. Performance Monitoring. 7. Continual Improvements in Processes by KA IZENs. 8. Revised work content implementation by applicators. Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 16: Combined with L ean methodology, M OS T is the best tool to easily and scientifically: ◦ S horten production cycles, hence increasing profitability by cost cutting and maximizing resource usage ◦ M akes work easier for operators in labor-intensive manufacturing, increasing personnel motivation and work quality ◦ Provides immediate, measurable ROI Using computerized systems, one can easily measure any amount of work involved, with no limited parameters Online productivity KPIs are made available on Enterprise level, in real time Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 17: Contact M HZ (info@mobilehumanzone.com) for an on-site video audit of a singled-out manufacturing process , previously identified as a resource-consuming bottleneck V ideo of pilot process is sent to UM A S for analysis M odelized optimized workflow is sent back to client site for immediate implementation by M HZ Results are measured and ROI calculated Upon approval project scope is defined and M OS T roll-out begins with on-site training and remote support Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.
Slide 18: Unique M ost A pplication and S olutions Pvt. L td. in collaboration with M obile Human Zone L td.