• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Assignment 2 Project Breakdown
 

Assignment 2 Project Breakdown

on

  • 624 views

 

Statistics

Views

Total Views
624
Views on SlideShare
606
Embed Views
18

Actions

Likes
0
Downloads
5
Comments
0

2 Embeds 18

http://ifolio.ukm.my 9
http://www.ifolio.ukm.my 9

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Assignment 2 Project Breakdown Assignment 2 Project Breakdown Document Transcript

    • CONSTRUCTION OF AN ADMINISTRATIVE BLOCK AND A HOSTEL BLOCK OFTWO STOREY BUILDING AND EXTERNAL WORKSFOR MEDICAL FACULTY TRAINING CENTRE IN BANGI Starting Date: 1st Feb 2012 Completion Date: 30th June 2013No Tasks Cost Sub Tasks Main Tasks 1 Site possession 0.00 2 Preliminaries and General Conditions 340,000.00 Initial 143,000.00 Recurring 197,000.00 3 Site Clearing and Earthwork 929,000.00 Site Clearing 33,000.00 Survey work 5,000.00 Temporary earth drain & sediment control work 5,000.00 Excavation and embankment 886,000.00 4 Piling Work 1,440,000.00 Setting out 10,000.00 Mobilization & Setting up Piling Equipment 40,000.00 Initial Pile 15,000.00 Load Test 40,000.00 Piling Work 1,300,000.00 PDA Test 20,000.00 Cut Off Pile 15,000.00 5 Substructure Work Pile Cap 210,000.00 Excavation 7,000.00 Form Work 15,000.00 Lean Concrete 5,000.00 Reinforcement 82,000.00 Concrete Works 88,000.00 Dismantling Formwork - Anti Termite 7,000.00 Backfill 6,000.00 Stump 62,000.00 Form Work 8,000.00 Concrete Works 54,000.00 Dismantling Formwork - Ground beam 197,000.00 Excavation 2,000.00 Form Work 51,000.00 Lean Concrete 4,000.00 Reinforcement 91,000.00 Concrete Works 49,000.00 Dismantling Formwork - Ground Slab 122,000.00 Backfill 4,000.00 Hardcore 10,000.00 Form Work 5,000.00
    • Lean Concrete 10,000.00 Damp proof Layer 3,000.00 Reinforcement 53,000.00 Concrete Works 37,000.00 Dismantling Formwork -6 Superstructure Work for two storey blocks Ground Column 56,000.00 Reinforcement 33,000.00 Form Work 5,000.00 Concrete Works 18,000.00 Dismantling Formwork - Ist Floor Beam and Slab 235,000.00 Reinforcement 74,000.00 Form Work 91,000.00 Concrete Works 70,000.00 Dismantling Formwork - 1st Floor Column 56,000.00 Reinforcement 34,000.00 Form Work 5,000.00 Concrete Works 17,000.00 Dismantling Formwork - 2nd Floor Beam and Slab 235,000.00 Reinforcement 74,000.00 Form Work 91,000.00 Concrete Works 70,000.00 Dismantling Formwork - Roof beams 69,000.00 Reinforcement 25,000.00 Form Work 23,000.00 Concrete Works 21,000.00 Dismantling Formwork - Trusses Design and submission - 0.007 Roofing 303,000.00 Trusses Installation 135,000.00 Fascia Board 8,000.00 Covering & Finishes 90,000.00 Gutters and Rain water downpipes 70,000.008 Covered Walkway 36,000.00 Structue Work 19,000.00 Finishes Work 17,000.009 Architectural Finishes Brickworks 303,000.00 Ground Floor 101,000.00 1st Floor 101,000.00 2nd Floor 101,000.0010 Windows and External Door Frame 250,000.0011 Internal Wall Finishes 247,000.0012 Internal Floor Finishes 260,000.0013 Steps and Railing 20,000.0014 Ceiling Finishes 128,000.00
    • 15 External Wall Finishes 90,000.0016 External Floor Finishes 18,000.0017 Internal Painting 64,000.0018 External Painting 36,000.0019 Door & Window Panel 127,000.0020 Sanitary Fittings & Finishes 37,000.0021 Apron & perimeter drains 82,000.0022 Electrical and Mechanical Services 1,134,000.00 a) Cold water services 170,000.00 b) Sanitary services 90,000.00 c) Fire protection system 92,000.00 d) Air conditioning and ventilation system 160,000.00 e) Internal electrical services 322,000.00 f) Internal telephone services 40,000.00 g) External electrical services 190,000.00 h) External telephone services 70,000.0023 External Works 1,000,000.00 a) Road and car parks 450,000.00 b) Surface water drainage 390,000.00 c) Water reticulation 60,000.00 d) Sewerage system and treatment plant 100,000.0024 Final inspection25 Testing & commissioning26 Handing over Total Project Cost 8,086,000.00
    • `