Adtec Pre No.18   Feb 09
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

Adtec Pre No.18 Feb 09

on

  • 978 views

 

Statistics

Views

Total Views
978
Views on SlideShare
966
Embed Views
12

Actions

Likes
0
Downloads
3
Comments
0

2 Embeds 12

http://www.arkamonline.com 10
http://arkamonline2.blogspot.com 2

Accessibility

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Adtec Pre No.18 Feb 09 Presentation Transcript

  • 1. LAPORAN KEMAJUAN PROJEK NO.18 ‘FEBUARY 2009’ PROJEK ADTEC TAIPING KEMENTERIAN SUMBER MANUSIA JABATAN KERJA RAYA MALAYSIA KAMALBINA SDN. BHD PEMILIK PEGARAH PROJEK KONTRAKTOR R&B
  • 2. ADTEC TAIPING LOKASI PROJEK
  • 3. BANGUNAN PENTADBIRAN BENGKEL TEK. MAKLUMAT & JAMIN KUALITI DEWAN BESAR PUSAT SUMBER DEWAN KULIAH LOBI UTAMA KAFETERIA MIKRO ELEKTRONIK KOMPOSIT PLASTIK M&E PLANT ROOM 1 TNB SUB STATION SERAMIK M&E PLANT ROOM 2 GARAJ KENDERAAN ASRAMA LELAKI ASRAMA PEREMPUAN DEWAN MAKAN SURAU KELAS F KELAS G KUARTERS B, C, C&D PELAN TAPAK ADTEC TAIPING
  • 4. KEMAJUAN KERJA FIZIKAL JADUAL : 70.88% SEBENAR : 67.03% KESELURUHAN : -3.85% TARIKH LAPORAN : 12 FEB 2009
  • 5. KEMAJUAN KERJA KEWANGAN JADUAL : 74.78% SEBENAR : 68.50% KESELURUHAN : -6.28% @ 45 HARI (LEWAT ) TARIKH LAPORAN : 12 FEB 2009
  • 6.  
  • 7. KEMAJUAN KERJA FIZIKAL - DEWAN BESAR BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 98.98% 65.52% - 33.46% FEB 09’ 99.12% 67.42% - 31.70% MECHANICAL PLANNED ACTUAL AIR COND 100.00% 50.00% FIRE FIGHTING 100.00% 26.74% KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 100.00% 65.00% SUBMAIN CABLE 100.00% 71.00% DB 100.00% 0.00% LUMINAIRE 100.00% 0.00% MAIN S/BOARD 100.00% 0.00% LPS NA NA PA 100.00% 2.12% SMATV 100.00% 21.25% CCTV NA NA ICT 100.00% 12.65%
  • 8. DEWAN BESAR
  • 9. DEWAN BESAR
  • 10. KEMAJUAN KERJA FIZIKAL – LOBI BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 93.25% 78.68% -14.57% FEB 09’ 95.00% 90.85% -4.15% MECHANICAL PLANNED ACTUAL AIR COND NA NA FIRE FIGHTING NA NA KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 100.00% 75.00% SUBMAIN CABLE 100.00% 90.00% DB 100.00% 0.00% LUMINAIRE 100.00% 0.00% MAIN S/BOARD NA NA LPS NA NA PA 100.00% 65.37% SMATV NA NA CCTV 100.00% 0.00% ICT NA NA
  • 11. LOBI UTAMA
  • 12. KEMAJUAN KERJA FIZIKAL – DEWAN KULIAH UTAMA BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 73.49% 66.39% -7.10% FEB 09’ 83.03% 70.04% -12.99% MECHANICAL PLANNED ACTUAL AIR COND 50.00% 74.50% FIRE FIGHTING 41.70% 49.64% KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 100.00% 65.00% SUBMAIN CABLE 56.25% 88.00% DB 100.00% 0.00% LUMINAIRE 0.00% 0.00% MAIN S/BOARD 100.00% 0.00% LPS 91.09% 0.00% PA 100.00% 19.31% SMATV NA NA CCTV NA NA ICT 97.21% 0.00%
  • 13. DEWAN KULIAH UTAMA
  • 14. KEMAJUAN KERJA FIZIKAL – PUSAT SUMBER/PERPUSTAKAAN BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 84.29% 84.41% 0.12% FEB 09’ 93.37% 89.98% -3.39% MECHANICAL PLANNED ACTUAL AIR COND 87.60% 80.18% FIRE FIGHTING 33.90% 90.24% KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 100.00% 90.00% SUBMAIN CABLE 100.00% 88.00% DB 100.00% 0.00% LUMINAIRE 100.00% 25.00% MAIN S/BOARD 100.00% 0.00% LPS 100.00% 73.47% PA 100.00% 34.79% SMATV 100.00% 57.16% CCTV NA NA ICT 29.27% 0.00%
  • 15. PUSAT SUMBER / PERPUSTAKAAN
  • 16. KEMAJUAN KERJA FIZIKAL – PENTADBIRAN & PENGURUSAN SUMBER BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 82.12% 77.52% -4.60% FEB 09’ 91.35% 84.29% -7.06% MECHANICAL PLANNED ACTUAL AIR COND 71.21% 63.09% FIRE FIGHTING 45.46% 38.79% KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 100.00% 82.50% SUBMAIN CABLE 100.00% 78.00% DB 100.00% 0.00% LUMINAIRE 78.57% 25.00% MAIN S/BOARD 100.00% 0.00% LPS 93.03% 69.22% PA 100.00% 15.96% SMATV 100.00% 52.05% CCTV 62.56% 2.13% ICT 72.81% 0.00%
  • 17. BANGUNAN PENTADBIRAN & PENGURUSAN SUMBER
  • 18. KEMAJUAN KERJA FIZIKAL - KAFETARIA BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 72.24% 89.11% 16.88% FEB 09’ 84.36% 94.85% 10.49% MECHANICAL PLANNED ACTUAL AIR COND 0.00% 43.00% FIRE FIGHTING 12.65% 29.54% KITCHEN EQUIP. 0.00% 6.51% LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 100.00% 90.00% SUBMAIN CABLE 100.00% 90.00% DB 83.33% 0.00% LUMINAIRE 0.00% 25.00% MAIN S/BOARD NA NA LPS 64.46% 56.58% PA 98.14% 22.79% SMATV 81.61% 50.29% CCTV NA NA ICT 100.00% 0.00%
  • 19. KAFETERIA
  • 20. KEMAJUAN KERJA FIZIKAL – BENGKEL TEKNOLOGI MAKLUMAT BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 79.02% 84.02% 5.01% FEB 09’ 85.84% 89.53% 3.69% MECHANICAL PLANNED ACTUAL AIR COND 23.57% 66.78% FIRE FIGHTING 27.70% 33.67% KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 100.00% 90.00% SUBMAIN CABLE 100.00% 50.00% DB 100.00% 25.00% LUMINAIRE 0.00% 45.00% MAIN S/BOARD 86.67% 0.00% LPS 99.49% 74.62% PA 100.00% 42.43% SMATV 99.68% 59.11% CCTV 54.53% 33.71% ICT 20.74% 0.00%
  • 21. BENGKEL TEKNOLOGI MAKLUMAT
  • 22. KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (PLASTIK) BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 68.69% 86.03% 17.33% FEB 09’ 78.05% 93.28% 15.23% MECHANICAL PLANNED ACTUAL AIR COND 30.27% 80.11% FIRE FIGHTING 24.65% 53.54% KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR 14.29% 75.00% DUST CONTROL NA NA PROCESS COOLING 7.60% 0.00% ELECTRICAL PLANNED ACTUAL WIRING 53.57% 90.00% SUBMAIN CABLE 0.00% 80.00% DB 0.00% 0.00% LUMINAIRE 0.00% 45.00% MAIN S/BOARD 0.00% 0.00% LPS 69.14% 74.65% PA 22.31% 46.85% SMATV NA NA CCTV 37.46% 49.69% ICT 4.96% 0.00%
  • 23. BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)
  • 24. KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT) BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 71.23% 83.64% 12.41% FEB 09’ 79.39% 93.66% 14.27% MECHANICAL PLANNED ACTUAL AIR COND 31.60% 79.74% FIRE FIGHTING 31.64% 59.65% KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR 20.00% 75.00% DUST CONTROL 17.20% 23.77% PROCESS COOLING 12.06% 0.00% ELECTRICAL PLANNED ACTUAL WIRING 60.71% 90.00% SUBMAIN CABLE 0.00% 75.00% DB 0.00% 0.00% LUMINAIRE 0.00% 45.00% MAIN S/BOARD 0.00% 0.00% LPS 64.14% 67.88% PA 25.13% 40.39% SMATV NA NA CCTV 54.68% 50.54% ICT 13.80% 0.00%
  • 25. BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)
  • 26. KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (SERAMIK) BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 71.02% 79.96% 8.84% FEB 09’ 76.14% 93.08% 16.93% MECHANICAL PLANNED ACTUAL AIR COND 15.58% 78.29% FIRE FIGHTING 27.33% 55.87% KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR 28.57% 75.00% DUST CONTROL 3.37% 28.75% PROCESS COOLING 15.20% 0.00% ELECTRICAL PLANNED ACTUAL WIRING 71.43% 90.00% SUBMAIN CABLE 0.00% 85.00% DB 0.00% 0.00% LUMINAIRE 0.00% 45.00% MAIN S/BOARD 0.00% 0.00% LPS 56.92% 73.14% PA 39.65% 41.63% SMATV NA NA CCTV 43.10% 57.16% ICT 11.76% 0.00%
  • 27. BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)
  • 28. KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. JAMINAN KUALITI BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 77.16% 77.74% 0.58% FEB 09’ 80.11% 87.32% 7.21% MECHANICAL PLANNED ACTUAL AIR COND 25.39% 55.00% FIRE FIGHTING 37.17% 37.23% KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR 88.57% 75.00% DUST CONTROL 33.88% 27.27% PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 100.00% 82.50% SUBMAIN CABLE 94.44% 50.00% DB 0.00% 0.00% LUMINAIRE 0.00% 0.00% MAIN S/BOARD 0.00% 0.00% LPS 70.85% 71.76% PA 97.59% 22.19% SMATV 68.57% 34.14% CCTV 44.98% 40.48% ICT 16.57% 0.00%
  • 29. BENGKEL KEJ. JAMINAN KUALITI
  • 30. KEMAJUAN KERJA FIZIKAL – BENGKEL MIKRO ELEKTRONIK BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 72.73% 78.27% 5.54% FEB 09’ 79.37% 86.86% 7.49% MECHANICAL PLANNED ACTUAL AIR COND 24.09% 75.00% FIRE FIGHTING 16.09% 39.65% KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR 45.71% 75.00% DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 92.86% 82.50% SUBMAIN CABLE 9.52% 50.00% DB 0.00% 0.00% LUMINAIRE 0.00% 0.00% MAIN S/BOARD 0.00% 0.00% LPS 65.33% 72.28% PA 56.33% 26.46% SMATV 63.35% 46.25% CCTV 58.47% 52.62% ICT 18.14% 0.00%
  • 31. BENGKEL MIKRO ELEKTRONIK
  • 32. KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘B’ BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 80.19% 96.63% 16.44% FEB 09’ 90.43% 96.63% 6.20% MECHANICAL PLANNED ACTUAL AIR COND 100.00% 90.00% FIRE FIGHTING NA NA KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 100.00% 90.00% SUBMAIN CABLE 100.00% 90.00% DB 100.00% 75.00% LUMINAIRE 0.00% 65.00% MAIN S/BOARD 100.00% 0.00% LPS 97.60% 0.00% PA NA NA SMATV 100.00% 32.27% CCTV 99.75% 34.02% ICT 100.00% 75.00%
  • 33. KUARTERS KELAS ‘B’
  • 34. KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C’ BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 81.59% 96.76% 15.16% FEB 09’ 88.42% 96.76% 8.33% MECHANICAL PLANNED ACTUAL AIR COND 100.00% 90.00% FIRE FIGHTING NA NA KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 90.48% 90.00% SUBMAIN CABLE 0.00% 90.00% DB 100.00% 90.00% LUMINAIRE 8.33% 90.00% MAIN S/BOARD 100.00% 0.00% LPS 83.45% 0.00% PA NA NA SMATV 89.67% 24.75% CCTV NA NA ICT 98.54% 51.68%
  • 35. KUARTERS KELAS ‘C’
  • 36. KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C+D’ BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 69.32% 96.38% 27.06% FEB 09’ 84.31% 96.38% 12.07% MECHANICAL PLANNED ACTUAL AIR COND 100.00% 90.00% FIRE FIGHTING NA NA KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 100.00% 90.00% SUBMAIN CABLE 100.00% 90.00% DB 100.00% 90.00% LUMINAIRE 85.71% 90.00% MAIN S/BOARD 100.00% 0.00% LPS 96.87% 0.00% PA NA NA SMATV 100.00% 32.27% CCTV NA NA ICT 100.00% 75.00%
  • 37. KUARTERS KELAS ‘C’ + ‘D’
  • 38. KEMAJUAN KERJA FIZIKAL – KUATERS KELAS F ( 1 BLOK 4 TINGKAT & I BLOK 5 TINGKAT) BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 73.69% 91.08% 17.39% FEB 09’ 77.45% 93.57% 16.12% MECHANICAL PLANNED ACTUAL AIR COND NA NA FIRE FIGHTING NA NA KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 90.48% 90.00% SUBMAIN CABLE 0.00% 90.00% DB 0.00% 75.00% LUMINAIRE 0.00% 90.00% MAIN S/BOARD 0.00% 0.00% LPS 100.00% 83.97% PA NA NA SMATV 100.00% 73.58% CCTV NA NA ICT 100.00% 54.65%
  • 39. KUARTERS KELAS ‘F’ ( 4 TINGKAT )
  • 40. KUARTERS KELAS ‘F’ ( 5 TINGKAT )
  • 41. KEMAJUAN KERJA FIZIKAL – KUATERS KELAS G (1 BLOK 4 TINGKAT & 1 BLOK 5 TINGKAT) BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 73.24% 92.63% 19.39% FEB 09’ 77.88% 93.41% 15.53% MECHANICAL PLANNED ACTUAL AIR COND NA NA FIRE FIGHTING NA NA KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 100.00% 90.00% SUBMAIN CABLE 38.10% 90.00% DB 0.00% 75.00% LUMINAIRE 0.00% 90.00% MAIN S/BOARD 0.00% 0.00% LPS 100.00% 83.97% PA NA NA SMATV 100.00% 73.58% CCTV NA NA ICT 100.00% 58.20%
  • 42. KUARTERS KELAS ‘G’ ( 5 TINGKAT )
  • 43. KUARTERS KELAS ‘G’ ( 4 TINGKAT )
  • 44. KEMAJUAN KERJA FIZIKAL – DEWAN MAKAN BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 96.42% 94.87% -1.55% FEB 09’ 98.16% 97.32% -0.84% MECHANICAL PLANNED ACTUAL AIR COND 100.00% 90.00% FIRE FIGHTING 100.00% 45.63% KITCHEN EQUIP. 0.00% 5.66% LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 100.00% 90.00% SUBMAIN CABLE 100.00% 75.00% DB 100.00% 0.00% LUMINAIRE 100.00% 90.00% MAIN S/BOARD 100.00% 0.00% LPS 100.00% 84.63% PA 100.00% 42.65% SMATV 100.00% 60.35% CCTV NA NA ICT 100.00% 0.00%
  • 45. DEWAN MAKAN
  • 46. KEMAJUAN KERJA FIZIKAL – ASRAMA LELAKI A & B BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 81.74% 91.05% 9.30% FEB 09’ 86.42% 97.01% 10.59% MECHANICAL PLANNED ACTUAL AIR COND 100.00% 25.53% FIRE FIGHTING 91.54% 69.93% KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 64.29% 90.00% SUBMAIN CABLE 0.00% 75.00% DB 0.00% 0.00% LUMINAIRE 0.00% 75.00% MAIN S/BOARD 0.00% 0.00% LPS 85.58% 80.71% PA 99.21% 32.10% SMATV 72.16% 54.88% CCTV 37.44% 33.69% ICT 99.85% 0.00%
  • 47. ASRAMA LELAKI A & B
  • 48. KEMAJUAN KERJA FIZIKAL – ASRAMA PEREMPUAN C & D BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 72.72% 93.81% 21.09% FEB 09’ 81.04% 97.63% 16.58% MECHANICAL PLANNED ACTUAL AIR COND 0.00% 10.00% FIRE FIGHTING 24.94% 71.32% KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 80.95% 90.00% SUBMAIN CABLE 15.79% 75.00% DB 0.00% 0.00% LUMINAIRE 0.00% 90.00% MAIN S/BOARD 0.00% 0.00% LPS 79.12% 81.33% PA 6.35% 30.15% SMATV 5.81% 54.88% CCTV 88.52% 0.00% ICT 0.08% 16.54%
  • 49. ASRAMA PEREMPUAN C & D
  • 50. KEMAJUAN KERJA FIZIKAL - SURAU BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 74.66% 78.73% 4.07% FEB 09’ 77.94% 88.08% 10.14% MECHANICAL PLANNED ACTUAL AIR COND NA NA FIRE FIGHTING 0.00% 0.00% KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 23.81% 75.00% SUBMAIN CABLE 0.00% 50.00% DB NA NA LUMINAIRE 0.00% 0.00% MAIN S/BOARD 0.00% 0.00% LPS 43.92% 58.38% PA 18.31% 4.58% SMATV NA NA CCTV NA NA ICT NA NA
  • 51. SURAU
  • 52. KEMAJUAN KERJA FIZIKAL - ASTAKA BANGUNAN SOKONGAN MONTH PLANNED ACTUAL AHEAD / DELAY JAN 09’ 79.98% 87.62% 7.64% FEB 09’ 91.60% 98.95% 7.35% MECHANICAL PLANNED ACTUAL AIR COND NA NA FIRE FIGHTING 0.00% 0.00% KITCHEN EQUIP. NA NA LPG INSTALL. NA NA COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 100.00% 90.00% SUBMAIN CABLE 100.00% 90.00% DB 100.00% 0.00% LUMINAIRE 100.00% 50.00% MAIN S/BOARD 100.00% 0.00% LPS 59.67% 58.21% PA 100.00% 5.72% SMATV NA NA CCTV NA NA ICT NA NA
  • 53. BANGUNAN SOKONGAN ASTAKA
  • 54. KEMAJUAN KERJA FIZIKAL – M&E PLANT ROOM BANGUNAN SOKONGAN MONTH PLANNED ACTUAL AHEAD / DELAY FEB 09’ 87.44% 97.52% 10.08% MECHANICAL PLANNED ACTUAL AIR COND 91.70% 88.10% FIRE FIGHTING 70.07% 0.00% KITCHEN EQUIP. NA NA LPG INSTALL. 0.00% 0.00% COMPRES. AIR NA NA DUST CONTROL NA NA PROCESS COOLING NA NA ELECTRICAL PLANNED ACTUAL WIRING 100.00% 90.00% SUBMAIN CABLE 100.00% 20.00% DB 100.00% 0.00% LUMINAIRE 100.00% 50.00% MAIN S/BOARD 100.00% 0.00% LPS NA NA PA NA NA SMATV NA NA CCTV NA NA ICT NA NA
  • 55. BANGUNAN SOKONGAN M&E PLANT ROOM – PUSAT SUMBER
  • 56. BANGUNAN SOKONGAN M&E PLANT ROOM - BENGKEL
  • 57. DECORATIVE FENCE
  • 58. BANGUNAN SOKONGAN GARAJ KENDERAAN
  • 59. ELEVATED WATER TANK, PUMP HOUSE & SUCTION TANK
  • 60. WAKAF
  • 61. LALUAN BERBUMBUNG
  • 62. OPEN PLAZA
  • 63. KERJA INFRA – JALAN UTAMA
  • 64. GELANGGANG PERMAINAN - TENIS
  • 65. M&E INSTALLATION
  • 66. M&E INSTALLATION
  • 67. M&E INSTALLATION
  • 68. M&E INSTALLATION
  • 69.
    • SEKIAN TERIMA KASIH