OKI Congestion Management Proces March 2009 Interim Report

Loading...

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

0 comments

Post a comment

    Post a comment
    Embed Video
    Edit your comment Cancel

    Favorites, Groups & Events

    OKI Congestion Management Proces March 2009 Interim Report - Presentation Transcript

    1. OKI Congestion Management Process (CMP) Evaluating Transportation System Performance April 2009 Interim Report
    2. What is the CMP? Required by SAFETEA-LU   Provides for the systematic review of transportation system performance  Identify and evaluate strategies to address roadway congestion  In air quality nonattainment areas, no Federal funds for new SOV capacity unless addressed through CMP.
    3. Performance Measures Travel Model (Base Year and  Forecasted) ◦ level-of–service ◦ Peak travel times Observed  ◦ Peak travel times ◦ Travel speed ◦ Travel Delay ◦ Comparison with previously observed conditions ◦ ARTIMIS – annual vehicle delay due to
    4. Observed Data: Collection Methodology Staff use of GPS units   Vehicle position recorded once per second.  AM and PM peak measurements  Mid-day peak measurement  Only “typical” travel conditions
    5. Sources of Congestion - US Other NonRecurring Bottlenecks 5% 40% Poor Signals 5% Traffic Incidents Work Zones Weather 25% 10% 15%
    6. Delay in OKI Region Daily person hours of delay   2001-2004 ≈ 49,000 hours  2004-2007 ≈ 51,000 hours Daily cost of delay   2001-2004 ≈ $746,000  2004-2007 ≈ $784,000
    7. Forecasted Change in Travel Times 40 37 35 32 29 28 30 25 21 22 minutes 20 2005 20 17 2030 15 10 PM Peak 5 0 Cincinnati CBD Cincinnati CBD Anderson to Sharonville to to CVG to Kings Island Kenwood NKU
    8. CMP Schedule September 2007 – CMP Report with Findings  and Analysis  Observed Data Collection (performed Oct- Dec annually) ◦ 2007 - Group 1 ◦ 2008 - Group 2 ◦ 2009 - Group 3 ◦ 2010 - Group 4 September 2011 – Next CMP report   September 2011 thru May 2012 = Development of Regional Transportation Plan
    9. CMP Improvements Identify and evaluate problem  intersections  More detail on non-recurring congestion (incidents)  Multi-modal performance measures  Examine specific causes of congestion
    10. CMP Integration into Planning Process Congestion maps assist in project  prioritization for TIP and Plan  Evaluation matrix of CMP strategies screens alternatives  2030 traffic forecast and level-of- service maps used in Plan development  Observed speeds used for model calibration
    11. OKI TIP/Plan CMP Strategies Transportation Demand 1) Management strategies ◦ OKI RideShare ◦ Strategic Regional Policy Plan
    12. OKI TIP/Plan CMP Strategies 2) Traffic Operational Improvements  Dixie Hwy Access Management  Anderson Twp. CFI  Traffic Signal interconnect (Mason/Lockland/Cincinnati)
    13. OKI TIP/Plan CMP Strategies 3) ITS Technologies  ARTIMIS expansion  I-74 ramp meters
    14. OKI TIP/Plan CMP Strategies 4) Public Transportation  New Park & Ride lots  New transit centers  Metro Bus-on-shoulder  Rail Transit (Oasis Line)
    15. OKI TIP/Plan CMP Strategies 5) New Road Capacity  I-75 widening  South Airfield Connector
    16. Interim Data Collection Findings Group 1 facilities (Interstates) only  (Fall‟04 vs. Fall‟07) ◦ Total Vehicle Delay 16% ◦ AM travel time 4% ◦ PM travel time 3% Group 2 facilities only (Fall„05 vs.  Fall„08) ◦ Total Vehicle Delay 6% ◦ AM travel time 1% ◦ PM travel time 2%
    17. U.S. Annual Vehicle-Distance Traveled (Billion Miles) thru January 2009 3,150 3,100 3,050 3,000 2,950 2,900 2,850 2,800 2,750 2,700 2,650 Vehicle-Distance Traveled (Billion Miles) 2,600 2,550 2,500 2,450 2,400 2,350 2,300 2,250 2,200 2,150 2,100 2,050 2,000 1,950 1,900 1,850 1,800 1,750 1,700 1,650 1,600 1,550 1,500 1,450 1,400 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 Year
    18. More Information September 2007 CMP Analysis Report www.oki.org/transportation/index.html Andy Reser, AICP OKI 513-621-6300 x146 areser@oki.org
    SlideShare Zeitgeist 2009

    + Andrew ReserAndrew Reser Nominate

    custom

    185 views, 0 favs, 0 embeds more stats

    March 2009 Interim Report on OKI\'s Congestion Mana more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 185
      • 185 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 0
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories