Urban Design Project 2
Upcoming SlideShare
Loading in...5
×
 

Urban Design Project 2

on

  • 1,642 views

the ECO IRGAH VALLY PROJECT

the ECO IRGAH VALLY PROJECT

Statistics

Views

Total Views
1,642
Views on SlideShare
1,641
Embed Views
1

Actions

Likes
1
Downloads
115
Comments
0

1 Embed 1

http://www.linkedin.com 1

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Urban Design Project 2 Urban Design Project 2 Presentation Transcript

  • ECO IRGAHVALEYStudent name : Salman AltuwairkiNO. : 428102630Course : Urban design project 2Date : 2011Supervisor : Dr. Ziad Alameddine
  • Course : Urban design project 2 Student name : Salman Altuwairki Date : 2011 NO. : 428102630 Supervisor : Dr. Ziad Alameddine Introduction :The importance of the site drives from being linked with king Abdullah Road ,As well as its proximity to KSU , DQ , Historical Irgah city . In addition The siteis characterized by the natural features of wadi Hanifa . During the initialsurvey of the study area it’s noticed that there are urban problems such asrandom planning , the absence of regulations in addition to the incompletefacilities . There for . It’s most important to establish a clear vision to thedevelopment of the area based on comprehensive urban design process . Urban process : Goals and overall objectives of Data Preparing Preparing the collection the master details plan 1 – the project: To identify the urban problems in the study area and resolutions . plan 2 - To improving the area by raising the aesthetic value . 3 –To Enhancing the environmental and sustainability aspects . • Selection of study • Urban details area • Study of urban design • Lots patterns 4 - To raise the value of the region economically . • Site analysis consideration • Preparation of the • Case studies • Set backs • Building mass 5 – To add character to the area . • Design alternatives project program • Land use plan • Urban codes 6 - To connecting the area in a better way . • Road network , pedestrian movement and public spaces
  • Location surveys  location : Project area : Historical studies N The most Direct way Makah Road West Ring Road N King Abdullah Road East Ring Road King Fahd Road Salbouk Road Strategic location Its in the west of Riyadh city near to The project area is surrounded by natural & man Old Irgah is an ancient town was known King Saud university and the made features , To the north , south and east before Islam .its total area 12 Sq. Km Diplomatic Quarter . About 30 Irgah valley . And to the west , The site is . And still some of these signs of the old minutes from the airport (42Km) surrounded by high voltage Electrical Towers . city remain . Despite the existence of the .And its surrounded by major study area in the range of . Roads. Study area ( 2.4 Sq. km ) * Source : http://www.ergah.com/ergah/3/3/1/  Topology :The study area is flat land . It is surrounded by Hanifa  Climate : Old Irgah districtvalley which has a beautiful topography & natural Riyadh climate is characterized by an extremely hot inelements summer and cold in winter and it is characterized by low humidity throughout the year about (40 – 49 ) %, especially in the summer, the great difference between  Valley The number of population in Irgah is +643 temperatures during the day and night. The rate of community: by The Municipality . about 46000 people +655 Study area rainfall is between 10 and 13.1 centimeters . 43% are males & 57 % are females . Also 85 Rain water Stream line sunrise % are Saudis & 15 % are foreign . And 28 % Wadi stream direction N sunset are singles & 72 % are married . Current +655 population density is about 15000 people . Desirable +640 wind Undesirable  Economy : wind land prices in the commercial streets Sun movement are between 2000 – 3000 SR & in the residential between 1300 – 1700 . All the study area is private properties ,55 % are rented . winter summer
  • THE URBAN ASSEMBLY KITGrain of building Building mass Large buildings Medium buildings Small buildings Area : 9580 Sq. m Area : 1350 Sq. m Area : 300 Sq. mBlock pattern Block lots Public open Area : 48000 sq. m Area : 82000 sq. m Number of lots : 61 space Area : 51000 sq. m Number of lots : 77 Area starts from : 44000 sq. m Number of lots : 63 Number of lots : 38 Vehicles PedestrianFramework of movement streets Hi density Active ways Mid density Inactive ways low density Meeting pointsCurrent Irgah A A B B
  • THE URBAN ASSEMBLY KIT Land use : The most useage in the area is residential then the utilities . And very little commercial or mix use to serve the area .  Building The study area can be divide into three conditions : condition: 1- Old building 2- Modern building ( less than 5 years old ) . 3- New building ( less than 1 year or under construction ) Old Building Old building Modern building New building Land use percentage 2% 17% 9% 5% 67% Modern Building Residential Mixed use Mosques Services Warehouses  Building Most of building in the area is made of concrete and  Building heights: materialsbuildings have there are few of :The majority of the buildings are 2 levels . There aresome higher building like the schools & hospital . New Building 1-2 floors 3-4 floors 5 floors and more Concrete BuildingLocal mosque Hospital Service Public school Privateschool Service ranges ranges Service ranges Service ranges
  • Site analysis  character analysis : WINDOWS & DOORS PATTERNS Villas Rectangular shape arc shape Openings & signs Sky lines types Mix use Buildings Side entrance to residence , Different levels in roofs front to shops & irregular signsResidential Building Middle door to residence Straight roofs Type of Service instudy areas Education Medical Financial Temporary Religious Street furniture Trees & lightning High Voltage Electric platforms Garbage cans Tower
  • Site analysis movement analysis : Major problems No cross line in the streets Light column in the Street Unfinished asphalt & pavement Main streets 40m Sub-streets 20-30m Secondary street 15m Car movement Pedestrians movement Entrance& exits Critical intersection Ramp in the street Mosque in the island Critical intersect & not safe Amart Irgah.ST
  • Visual surveys Mental map : residential Ibin Kaldoon School node Mix use Irgah Hospital Haifa valley Alrajhi Bank Riyadh city view services Paths Skyline : Empty land EdgesViews : Land marks : Vista :
  • Preparing The Master PlanOpportunities and Constraints : Opportunities Constraints Visual link to Old Irgah Built buildings Physical Link to the surrounding Hnifa Land prices valley Rise the commercial use in the area Hot weather of Riyadh city Suitable area for recreational use The possibility of reducing the privacy of the residential areas Physical Link to the current residential area B- Using zero emission transportation : Gathering the governmental uses The transportation for the developed area should not be producing CO2 . The area users will using electrical buses , moving walkway , bikes , Creating new character to the areaUrban design principles and consideration :1- sustainability : A- Using Solar power to generate electricity : all buildings will be covered with solar panels & using the new transparent solar technology in windows which directed to the sun 2- safety : Using a safe movement system which solve the issues of the pedestrian , handy caps , bikers and vehicles interaction . By separated lanes . Speed reduction , cross lines elements , etc. 3- Social: A- Maintain privacy B – linked communityB- Water treatment & reuse : All the buildings will have water treatment systems Development of project program :which will filter & reuse the gray water in toilets or in plantation then send the black usage Cultural Public Commercial Hotel Office Hosing Theme park Square Parking lots Roads Green Water Etc.water to the city water treatment 9.4 5.2 7.5 9 1 12.3 5.5 4.2 5 18.5 19.6 6.2 1.6 % plant.
  • Preparing The Master PlanUrban design alternative and concepts alternatives :First Concept Criteria Value evaluation Selection and development of the optimal alternative : Character 8% 5 Enclosure of space 8% 5 Clarity of public space 8% 7 Accessibility and 10% 5 permeability Legibility 8% 5 Adaptability 10% 4 Diversity 8% 5 Sustainability 15% 4 Enrich existing built 10% 7 natural environments Response to project 15% 8 program Total 100% 55Second Concept Criteria Value evaluation Character 8% 6 Enclosure of space 8% 3 Clarity of public space 8% 2 Accessibility and 10% 7 permeability Legibility 8% 5 Adaptability 10% 2 Diversity 8% 3 Sustainability 15% 5 Enrich existing built 10% 7 natural environments Response to project 15% 10 program Total 100% 50Third Concept Criteria Value evaluation Character 8% 7 Enclosure of space 8% 6 Clarity of public space 8% 6 Accessibility and 10% 10 permeability Legibility 8% 6 Adaptability 10% 4 Diversity 8% 5 Sustainability 15% 12 Enrich existing built 10% 7 natural environments Response to project 15% 9 program Total 100% 72
  • Land use & MovementLand uses Code Building type FAR No. Floor Site area Foot print No. sq. m sq. m parking 1 Museum .71 2 31240.76 11201.13 1000 2 Office 5.2 12 6657.6 3718.8 1390 3 Offices 3.2 12 8143.9 2646.8 1270 4 Offices 4.4 12 6028.5 2646.8 1270 2 2 5 commercial 3.4 10 8068.2 2769.8 1107 3 1 4 2 6 Offices 3.9 10 7957.0 3159.9 1264 8 2 5 7 Offices 4.5 10 6508.0 2950.6 1180 6 9 7 8 Offices 9 10 5911.4 5509.7 2200 12 11 10 9 Mosque .5 2 26193.6 7385 700 14 13 10 Schools .75 4 25373.7 4198.3 300 16 15 17 11 Offices 3.3 4 7484 6181.5 990 17 15 16 16 19 17 12 Offices 2.5 4 7658 4810.6 770 18 13 Offices 5.7 4 2188.3 3141.8 500 22 20 21 23 14 mall 1.8 5 105230 38023.4 1900 15 Office 2.3 5 6672.2 3075.7 615 16 Offices 2.6 5 7644.8 4086.7 817 17 Offices 3.8 6 5820.2 3737.5 897 18 Offices 3 6 6037.5 3053.8 733 24 19 commercial 1 6 1400 1050 252 20 Mosque .7 2 6654.5 2327.6 250 21 Offices 4.7 6 1346.2 1058.6 commercial Residential Mix Environmental Recreation Educational Heath Governmental center 22 school .87 4 25272.3 7358.4 400 museum Hotel 23 Gov. 1.78 8 28092 12509 500 24 hotel 2.5 13 43000 8500 150MovementVehicles , electrical buses , bikes , pedestrianPedestrians : The Bridge( moving walk ways )Pedestrians :Inside The projectPedestrians :From gardens
  • Sections and DetailsSections Details A B A Bridge measurements B Crossing details Section A – A / Scale 1 : 500 Section B- B / Scale 1: 500
  • perspectives
  • perspectives
  • perspectives