  1. 1. Industrial Summer Training at NTPC Badarpur <ul><li>Anuj Kumar </li></ul><ul><li>Electronics & Communication </li></ul>
  2. 2. Introduction 10/31/11
  3. 3. Overview of NTPC <ul><li>NTPC was set up in the central sector in the 1975. </li></ul><ul><li>NTPC has installed capacity of 29,394 MW. It plans to be a 75,000 MW company by 2017. </li></ul><ul><li>NTPC Badarpur station has also bagged ISO 9001/ ISO 14001 certification. </li></ul><ul><li>Today NTPC contributes more than 3 / 5th of the total power generation in India </li></ul>
  4. 4. Overview of NTPC
  5. 5. NTPC Badarpur
  6. 6. Overview of BTPS <ul><ul><li>BTPS MEETS MORE THAN 24% OF DELHI’S ELECTRICITY </li></ul></ul><ul><li>CONSUMPTION </li></ul><ul><ul><li>INSTALLED CAPACITY 720 MW </li></ul></ul><ul><ul><li>DERATED CAPACITY 705 MW </li></ul></ul><ul><li> (3x95 + 2x210MW) </li></ul><ul><li>OWNED BY GOVT. OF INDIA, MINISTRY OF POWER </li></ul><ul><li>BEING MANAGED BY NTPC FOR THE LAST 26 YEARS SINCE 1st APRIL 1978 </li></ul><ul><li>NTPC adjudged as the 3rd best employer in India </li></ul>
  7. 7. NTPC Badarpur <ul><li>BTPS was conceived in 1965 to meet the growing electricity demand of Northern Region. </li></ul><ul><li>The site construction activities started in 1968. </li></ul><ul><li>The plant became operational with the commissioning of its first unit on 26th July 1973, 2nd unit in ;74 , 3rd unit in ’75 , 4th unit in ’78 & 5th unit in ’81. </li></ul>
  8. 8. Basic Principle There are basically three main units of a thermal power plant: 1. Steam Generator or Boiler 2. Steam Turbine 3. Electric Generator
  9. 9. Electricity from Coal
  10. 10. C&I LABS Control and Instrumentation Department has following labs:   1. Manometry Lab 2. Protection and Interlocks Lab 3. Automation Lab 4. Electronics Lab 5. Water Treatment Plant 6. Furnaces Safety Supervisory System Lab
  11. 11. OPERATION AND MAINTAINANCE This control & instrumentation is the brain of the plant because from the relays to transmitters followed by the electronic computation chipsets and recorders and lastly the controlling circuitry, all fall under this. A View of Control Room at BTPS
  12. 12. CONTROL & MONITORING MECHANISMS There are basically two types of Problems faced in a Power Plant   1. Metallurgical   2. Mechanical
  13. 13. C&I Lab In C&I Lab parameters to be monitored are:   1. Speed   2. Temperature   3. Current   4. Voltage   5. Pressure   6. Flow of Gases   7. Vibration
  14. 14. IT Role & Responsibility <ul><ul><li>Maintenance Management </li></ul></ul><ul><ul><li>Materials & Contracts Management </li></ul></ul><ul><ul><li>Financial Accounting </li></ul></ul><ul><ul><li>Coal Monitoring & Accounting. </li></ul></ul><ul><ul><li>Operations & Generation Monitoring </li></ul></ul><ul><ul><li>Hospital Management </li></ul></ul><ul><ul><li>H R & TMS, T/S Management </li></ul></ul><ul><ul><li>Office Automation & communication. </li></ul></ul><ul><ul><li>E-Samadhan complaints Monitoring </li></ul></ul>
  15. 15. <ul><li>Why IT ? </li></ul><ul><li>Materials : 30,000 + items </li></ul><ul><ul><li>Transaction data. </li></ul></ul><ul><ul><li>Master data Material and Service </li></ul></ul><ul><li>Plant : 15,000 equipments </li></ul><ul><ul><li>Equipment master. Task list. </li></ul></ul><ul><li>Employees : 1100 + Personal and payroll data. </li></ul><ul><li>Finance : Accounting data. </li></ul><ul><li>Operation : Plant parameters history data </li></ul><ul><li>Vendors: 5000 + vendors. </li></ul>
  16. 20. Awards <ul><ul><li>MOP’s Meritorious Productivity Award : </li></ul></ul><ul><ul><ul><li>For calendar years 1987, 1988, 1990. </li></ul></ul></ul><ul><ul><ul><li>For financial years 92-93, 94-95 and 97-98 </li></ul></ul></ul><ul><ul><ul><li>Received Bronze medal in 1998-99 and </li></ul></ul></ul><ul><ul><ul><li>Received Silver shield and certificate of Meritorious performance for 2000-01. </li></ul></ul></ul><ul><ul><ul><li>Received Gold shield and Certificate for outstanding performance three consecutive years 01-02 & 02-03 , 03-04. the awards were presented by Hon’ble President of India and Hon’ble power Minister on 24 August 2004. </li></ul></ul></ul>
  17. 21. Awards
  18. 22. Awards
  19. 23. Awards <ul><ul><li>British safety award for 1988, 1994 and 1999. </li></ul></ul><ul><ul><li>One employee bagged the Vishwakarma Rashtriya Puraskar in 1994 from Ministry of Labour. Six employees have been given the same award for 1998. </li></ul></ul><ul><ul><li>6 BTPS employees were awarded under Delhi Shramik Sujhao Yojna Puraskar’97 . </li></ul></ul><ul><ul><li>Another 8 employees have been awarded under Delhi Shramik Sujhao Yojna Puraskar’98 at Vigyan Bhawan on 20th Aug’02 by Chief Minister of Delhi. </li></ul></ul>
  20. 24. BTPS awarded Silver shield in Thermal Power Sector for Outstanding Achievement in Safety management by Greentech foundation for 2003-04 <ul><ul><li>BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2002-03 </li></ul></ul><ul><ul><li>BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2003-04 </li></ul></ul><ul><ul><li>BTPS received golden peacock award for IT Innovations for 2003-04 </li></ul></ul>
  21. 25. BTPS received golden peacock award for IT innovations for 2003-04
  22. 26. Conclusion <ul><li>The BTPS IT has come a long way from lagging to leading in IT enablement among NTPC power stations. IT Vision realized, making BTPS highly information enabled plant. </li></ul>10/31/11
  23. 27. Reference <ul><li>TRAINING REPORTS OF PAST YEARS AT NALANDA LIBRARY </li></ul><ul><li>INTERNET </li></ul><ul><li>DOCUMENTS OF IT DEPARTMENT </li></ul>