Ntpc badarpur training ppt
 

Ntpc badarpur training ppt

on

  • 20,473 views

this is a training report PPt for presentation to help the students.

this is a training report PPt for presentation to help the students.

Statistics

Views

Total Views
20,473
Views on SlideShare
20,444
Embed Views
29

Actions

Likes
8
Downloads
1,442
Comments
8

3 Embeds 29

http://www.slashdocs.com 24
http://www.docseek.net 4
http://www.docshut.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel

18 of 8 previous next Post a comment

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Ntpc badarpur training ppt Ntpc badarpur training ppt Presentation Transcript

    • Industrial Summer Training at NTPC Badarpur
      • Anuj Kumar
      • Electronics & Communication
    • Introduction 10/31/11
    • Overview of NTPC
      • NTPC was set up in the central sector in the 1975.
      • NTPC has installed capacity of 29,394 MW. It plans to be a 75,000 MW company by 2017.
      • NTPC Badarpur station has also bagged ISO 9001/ ISO 14001 certification.
      • Today NTPC contributes more than 3 / 5th of the total power generation in India
    • Overview of NTPC
    • NTPC Badarpur
    • Overview of BTPS
        • BTPS MEETS MORE THAN 24% OF DELHI’S ELECTRICITY
      • CONSUMPTION
        • INSTALLED CAPACITY 720 MW
        • DERATED CAPACITY 705 MW
      • (3x95 + 2x210MW)
      • OWNED BY GOVT. OF INDIA, MINISTRY OF POWER
      • BEING MANAGED BY NTPC FOR THE LAST 26 YEARS SINCE 1st APRIL 1978
      • NTPC adjudged as the 3rd best employer in India
    • NTPC Badarpur
      • BTPS was conceived in 1965 to meet the growing electricity demand of Northern Region.
      • The site construction activities started in 1968.
      • The plant became operational with the commissioning of its first unit on 26th July 1973, 2nd unit in ;74 , 3rd unit in ’75 , 4th unit in ’78 & 5th unit in ’81.
    • Basic Principle There are basically three main units of a thermal power plant: 1. Steam Generator or Boiler 2. Steam Turbine 3. Electric Generator
    • Electricity from Coal
    • C&I LABS Control and Instrumentation Department has following labs:   1. Manometry Lab 2. Protection and Interlocks Lab 3. Automation Lab 4. Electronics Lab 5. Water Treatment Plant 6. Furnaces Safety Supervisory System Lab
    • OPERATION AND MAINTAINANCE This control & instrumentation is the brain of the plant because from the relays to transmitters followed by the electronic computation chipsets and recorders and lastly the controlling circuitry, all fall under this. A View of Control Room at BTPS
    • CONTROL & MONITORING MECHANISMS There are basically two types of Problems faced in a Power Plant   1. Metallurgical   2. Mechanical
    • C&I Lab In C&I Lab parameters to be monitored are:   1. Speed   2. Temperature   3. Current   4. Voltage   5. Pressure   6. Flow of Gases   7. Vibration
    • IT Role & Responsibility
        • Maintenance Management
        • Materials & Contracts Management
        • Financial Accounting
        • Coal Monitoring & Accounting.
        • Operations & Generation Monitoring
        • Hospital Management
        • H R & TMS, T/S Management
        • Office Automation & communication.
        • E-Samadhan complaints Monitoring
      • Why IT ?
      • Materials : 30,000 + items
        • Transaction data.
        • Master data Material and Service
      • Plant : 15,000 equipments
        • Equipment master. Task list.
      • Employees : 1100 + Personal and payroll data.
      • Finance : Accounting data.
      • Operation : Plant parameters history data
      • Vendors: 5000 + vendors.
    •  
    •  
    •  
    •  
    • Awards
        • MOP’s Meritorious Productivity Award :
          • For calendar years 1987, 1988, 1990.
          • For financial years 92-93, 94-95 and 97-98
          • Received Bronze medal in 1998-99 and
          • Received Silver shield and certificate of Meritorious performance for 2000-01.
          • Received Gold shield and Certificate for outstanding performance three consecutive years 01-02 & 02-03 , 03-04. the awards were presented by Hon’ble President of India and Hon’ble power Minister on 24 August 2004.
    • Awards
    • Awards
    • Awards
        • British safety award for 1988, 1994 and 1999.
        • One employee bagged the Vishwakarma Rashtriya Puraskar in 1994 from Ministry of Labour. Six employees have been given the same award for 1998.
        • 6 BTPS employees were awarded under Delhi Shramik Sujhao Yojna Puraskar’97 .
        • Another 8 employees have been awarded under Delhi Shramik Sujhao Yojna Puraskar’98 at Vigyan Bhawan on 20th Aug’02 by Chief Minister of Delhi.
    • BTPS awarded Silver shield in Thermal Power Sector for Outstanding Achievement in Safety management by Greentech foundation for 2003-04
        • BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2002-03
        • BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2003-04
        • BTPS received golden peacock award for IT Innovations for 2003-04
    • BTPS received golden peacock award for IT innovations for 2003-04
    • Conclusion
      • The BTPS IT has come a long way from lagging to leading in IT enablement among NTPC power stations. IT Vision realized, making BTPS highly information enabled plant.
      10/31/11
    • Reference
      • TRAINING REPORTS OF PAST YEARS AT NALANDA LIBRARY
      • INTERNET
      • DOCUMENTS OF IT DEPARTMENT
    •