Commodore Condominiums
Honolulu, HI


Photos Taken : August. 27, 2001...
Client: Couch Distributing          Dealer: Dinyari Construction
         Watsonville, CA            Project:: 49,000 squa...
Client: Minute Maid (Cold Storage)        Dealer: Florida Exterior Coatings
        Auburndale, Florida               Proj...
Client: Neo-Plan           Dealer: CCI-Commercial Roofing
         Brownsville, TX   Project Square Footage:
             ...
Client: Ernest N. Morial Convention Center   Dealer: Continental Roofing
         New Orleans, LA                     Proj...
Client: Port of Pensacola    Dealer: Gulf Coast Thermal Coatings
        Pensacola, Florida   Project:: 88,825 sq. ft. Roo...
Pro-Line Boats
Crystal River, FL
Sept. 2000




                                                            The Pro-Line B...
Pro-Line Boats
Pg.2




                                                              All horizontal and vertical seams we...
Client:: Queen of Peace Church   Dealer: George Taylor Thermal Coatings
         Ocala, Florida          Project:: 35,000 ...
Client: Roanoke Industrial Park   Dealer: Wicks Painting
        Roanoke, VA               Project: 68,320 sq. ft.
Client: Washington Square Center      Dealer: Thermacoat
        Denver, Colorado              Project: 14,000 sq. ft. sid...
Upcoming SlideShare
Loading in …5
×

Astec Project Updates

395 views

Published on

Updates to previous Astec projects

Published in: Technology, Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
395
On SlideShare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
8
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Astec Project Updates

  1. 1. PROJECT UPDATE Commodore Condominiums Honolulu, HI Photos Taken : August. 27, 2001 Project completed—1995
  2. 2. Client: Couch Distributing Dealer: Dinyari Construction Watsonville, CA Project:: 49,000 square feet Before project commencement During project - After waterproofing of seams and before ceramic finish coats Completed project
  3. 3. Client: Minute Maid (Cold Storage) Dealer: Florida Exterior Coatings Auburndale, Florida Project: 82,825 sq. ft. side walls All chalking and surface oxidation is removed and primed with ASTEC #4000 Surface Conditioner FINISH COAT BEING APPLIED BEFORE AFTER BEFORE AFTER AFTER AFTER
  4. 4. Client: Neo-Plan Dealer: CCI-Commercial Roofing Brownsville, TX Project Square Footage: Roof-239,367 , Walls 66,473 = Total of 305,840
  5. 5. Client: Ernest N. Morial Convention Center Dealer: Continental Roofing New Orleans, LA Project: 364,200 square feet
  6. 6. Client: Port of Pensacola Dealer: Gulf Coast Thermal Coatings Pensacola, Florida Project:: 88,825 sq. ft. Roof & Side walls II
  7. 7. Pro-Line Boats Crystal River, FL Sept. 2000 The Pro-Line Boat manufacturing facility in West- Central Florida was plagued with numerous leaks. The main culprit was a roof sprinkling system used in an attempt to cool the fiberglass fabrication building. This large pumping system was used to pump large amounts of water to the roof. This created rust and corrosion problems as well as compounding the leaking roof problem. Roof had several roof fans that could not be used. The movement of air would have been a production and health problem from fiberglass fibers blowing around. The roof fans were re- moved. The roof also has many sky- lights. Another one of three buildings the were treated with the Astec System Temperatures inside the fabricating building were sometimes near 100 degrees.
  8. 8. Pro-Line Boats Pg.2 All horizontal and vertical seams were repaired as needed and sealed. Skylights were sealed. Roof top fans were removed and new metal installed. Employees said they could feel an immediate drop in the inside temperature as the coating was being applied. Aerial view of the fiberglass fabricating building Arrows indicate the three buildings receiving the Astec System. Pro-Line has since asked for a bid on their other facilities (Do nzi) in south Florida.
  9. 9. Client:: Queen of Peace Church Dealer: George Taylor Thermal Coatings Ocala, Florida Project:: 35,000 Sq. Ft Sidewalls
  10. 10. Client: Roanoke Industrial Park Dealer: Wicks Painting Roanoke, VA Project: 68,320 sq. ft.