Cutting fins with the ban-saw
Just finished gluing in the bulkheadin the altimeter section of the rocket
Inserting the altimeter tube andmounting ring
Gluing in the bulkhead for the bottom ofthe payload section
Letting the glue set for the first fin
Measuring the distance between thethree fins
Gluing the second fin on the rocket
Setting out the components for theengine reload
Placing the delay and O-rings in the topportion of the engine
The engine reload is complete
Drilling a hole for the shock cord to theairframe parachute
Tying off the parachute to thealtimeter/payload section
Finally, gluing the last fin on therocket
Packaging the eggs for thepayload section
All the finalcomponents ofthe rocket
The final product!!!
Senior Project Photo Album
Upcoming SlideShare
Loading in …5
×

Senior Project Photo Album

218 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
218
On SlideShare
0
From Embeds
0
Number of Embeds
32
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Senior Project Photo Album

  1. 1. Cutting fins with the ban-saw
  2. 2. Just finished gluing in the bulkheadin the altimeter section of the rocket
  3. 3. Inserting the altimeter tube andmounting ring
  4. 4. Gluing in the bulkhead for the bottom ofthe payload section
  5. 5. Letting the glue set for the first fin
  6. 6. Measuring the distance between thethree fins
  7. 7. Gluing the second fin on the rocket
  8. 8. Setting out the components for theengine reload
  9. 9. Placing the delay and O-rings in the topportion of the engine
  10. 10. The engine reload is complete
  11. 11. Drilling a hole for the shock cord to theairframe parachute
  12. 12. Tying off the parachute to thealtimeter/payload section
  13. 13. Finally, gluing the last fin on therocket
  14. 14. Packaging the eggs for thepayload section
  15. 15. All the finalcomponents ofthe rocket
  16. 16. The final product!!!

×