• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Ferry   1000 T  330 Knots   6 Mn$   Roi  1600%
 

Ferry 1000 T 330 Knots 6 Mn$ Roi 1600%

on

  • 261 views

FAST FERRY 330 KNOTS ROI = 1200 %

FAST FERRY 330 KNOTS ROI = 1200 %

Statistics

Views

Total Views
261
Views on SlideShare
261
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft Word

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Ferry   1000 T  330 Knots   6 Mn$   Roi  1600% Ferry 1000 T 330 Knots 6 Mn$ Roi 1600% Presentation Transcript

    • FERRY 1000 T 330 KNOTS 6 Mn$ ROI 1600 %DOUBLE SPEED, 1/3 FUEL for SAME TON-HP6 X KMPL, 16.67 CO2e, DOUBLE RETURN ANDY TECHNOLOGY 1000 T 330 knots 20h 300 days Fare $1/50 km Revenue =144-48=96 mn$/yr Years 1 2 3 4 5 6 INV mn$ 6 mn$ 1 70 1,265 22,640 405,165Vessels no 5 mn$ 1 15 268 4,796 85,829 Profit mn$ 96.0 1,440.0 25,728.0 460,416.0 8,239,584.0Tax 12 % mn$ 11.5 172.8 3,087.4 55,249.9 988,750.1 Net mn$ 84.5 1,267.2 22,640.6 405,166.1 7,250,833.9Net INR Cr 422.4 6,336.0 113,203.2 2,025,830.4 36,254,169.6 RP 12.00 Mn$
    • NN