Business Proposal Energy Efficient

386 views
335 views

Published on

TRANSPORT HAULAGE 100 kph
100T+1000T ROLLING FRICTION

Design__ROAD____RAIL____SHIP.
NOW___572_______396______220
ANDY__152_______136______120
RATIO_.3.76_______2.91_____1.83
NET____376_______420______476
ADV___266¬¬¬_______.238______210
VDF____30_______.33.6______38.1 ANDY
VDF_____8________15_______25 NOW
….
HP___ROAD NOW___13,750 HP ;NEW__3,666 HP
HP___RAIL_ NOW____7,333 HP NEW__3,274 HP
HP___SHIP_ NOW____4,400 HP NEW__2,895 HP

Published in: Automotive, Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
386
On SlideShare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
9
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Business Proposal Energy Efficient

  1. 1. BUSINESS PROPOSALS - ENERGY EFFICIENT ANDY TECHNOLOGY DESIGN ANDY ENGINE, 1/3 fuel for same HP Nor, Asp CER 2/3 ANDY BEARING / ANDY-X- DRIVE, JET 1/3 fuel for same Ton-HP 166 % Speed CER 2/3 1/5 fuel for same Ton-kmph 60 % HP CER 4/5 TON-KMPL FUEL USED Lit/km/T = 1/ T-KMPL CO2e EMIS g/km/T = 2325 / T-KMPL COAL POWER PLANT • FUEL:Any Fuel, ALL Fuels.Coal,Lignite,Crude Oil Maize,Soya,LPG,CNG,Naphtha,Bio.F.,Agro Waste. • No Fuel Preparation....Just Burnt RAW 1/3 FUEL for SAME POWER COAL 100 kg / hour/MW against 300 kg Fuel saved 200 kg*20*360/1000= 1440 T/MW/Yr SAVED COST 200 $/T*1440= 288,000 $/MW/Yr CER 200*2.33*20*360/1000= 3355 T/MW/Yr NO BOILER, NO TURBINE. DIRECT ROTARY COST US $ 1 Mn /MW VC 2 Mn$ 1 Yr
  2. 2. GLOBAL Cooling 7,524 Mn Ton/year INV 210 Bn$ Automotive, Rail, Ship, Ferry, VLCC, PP, IND Speed 100,200,300,600 kph ; 330 , 660 knots FUEL 7 MnT OIL/day; 3 MnT COAL/day CO2e [7*2.9+3*2.33]360= = 9,800 Mn Ton/year Global CER…. .7,524 Mn Ton/year 76 % CDM ………… 7,524*25$= 188 Bn$ CER INV 210/7.5= 28 $/T CO2e Fuel Used by Design . CO2e source Now Andy Saved . Automotive 3.0 0.6 2.4 Mn Ton/Day Rail 1.0 0.2 0.8 Mn Ton/Day Shipping 3.0 0.6 2.4 Mn Ton/Day Power plant 3.0 1.0 2.0 Mn Ton/Day CER 10.0 2.4 7.6 2.9*2.4 = 6.96 Mn Ton/day by Automotive 2.9*0.8 = 2.32 Mn Ton/day by Rail 2.9*2.4 = 6.96 Mn Ton/day by Ship,Ferry,VLCC 2.33*2. = 4.66 Mn Ton/day by power plant CER 20.90 Mn Ton/day CER 20.9*360=7524 Mn Ton/year Saved Oil =5.60*500= 2800 Mn$/day Saved Coal= 2.0*200 = 400 Mn$/day ALL FUEL SAVED = 3200 Bn $/day ALL FUEL SAVED = 3200*360= 1152 Bn $/Year Tech Demo 20 Mn$ INVESTMENT 100 Mn$ EACH EXCEPT F 1 - 20 Mn$

×