LINK Zambia 8000 Road Project Update 17 February 28 2014

2,024 views
1,857 views

Published on

LINK Zambia 8000 Road Project Update 17 February 28 2014

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
2,024
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
11
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

LINK Zambia 8000 Road Project Update 17 February 28 2014

  1. 1. Link Zambia 8000 Road Project Status Update No. 17 as @ Friday, 28th February 2014 1. Progress on WORKS Contracts Ref No. Project Description Road Length (km) Start Date Completion Date Contract Sum (Works) (ZMW) Contract Sum (Services) (ZMW) Contractor/Consultant Status 1 Upgrading of 139 km Chipata- Vubwi (via Fern) - Chadiza (D804/R276, RD406) roads in Eastern Province 139 13/02/2013 15/02/2015 529,047,638.88 TBA China Jiangxi Corporation for International Economic and Technical cooperation Contract signed, works on-going RDA/TBA 2 Upgrading of 150 km Chipata- Chadiza-Katete (D128,RD 593,T6) roads in Eastern Province 150 15/01/2013 15/01/2015 713,114,097.33 TBA China State Construction Engineering Corporation Limited Contract signed, works on-going RDA/TBA 3 Upgrading to bituminous standard of 91km of the Luangwa Bridge to Feira (D145) Road in Lusaka Province 91 13/02/2013 12/02/2015 314,958,672.24 12,779,792.04 China Geo Engineering Corporation Contract signed, works on-going BICON (Z) Limited 4 Upgrading of the Kitwe – Chingola Dual Carriageway (45.5Km) 45.5 29/03/2013 30/03/2015 561,813,606.44 13,448,027.00 Sinohydro Zambia Limited Contract signed, works on-goingRankin Engineering Consultants 5 Pave Zambia 2000 Equipment 2000 10/12/2012 30/06/2013 N/A 64,666,804.97 Beijing Fund River Investment Co Limited Multi-Industry Limited Shaftex Zambia Limited Project Launched 18th September, 2013 RDA 6 Upgrading of 43.8km of the Leopards Hill Road Lot 1 43.8 09/10/2012 02/04/2014 242,296,469.14 8,150,740.00 China Geo Engineering Corporation Works Substantially Complete Zulu Burrow Development Consultants 7 Upgrading of Rd149 and D151 From Great East Road at Chongwe District Hospital to Katoba Basic School (48.5 Km) Including 12.5km D150 From Great East Road at cc Farms 61 05/04/2013 05/04/2015 205,807,776.28 Supervision Contract TBA Zhongmei Engineering Group Limited Contract signed, works on-going Bicon Zambia Limited
  2. 2. 8 Upgrading of D753/A2 Kenneth Kaunda Intl Airport through Kasisi to Great East Road (24.7km) and D176 Ngwerere road From T2 Great North Road at Kabangwe to D753 at Kasisi Mission Junction (23 Km) including D564 from T4 at Caltex to D176 at Ngwerere 60.7 28/05/2013 30/11/2014 168,786,867.66 1,890,000.00 Safricas Zambia Limited Contract signed, works on-going RDA/TBA 9 Upgrading to Bituminous Standard and Re-Alignment of Approximately 94km Of Road From Safwa to Chinsali In Muchinga Province – Lot 1 94 TBA TBA 264,798,761.04 TBA Raubex Zambia Limited Contract yet to be signedRDA/TBA 10 Upgrading to Bituminous Standard and Re-Alignment of Approximately 100km Of Road From Chinsali To Mulilansolo In Muchinga Province – Lot 2 100 25/05/2013 25/05/2015 295,906,766.36 TBA Sinohydro Zambia Limited Contract signed, works on-going RDA/TBA 11 Upgrading to Bituminous Standard and Re-Alignment of Approx 118km of Road from Mpika to Nabwalya (RD49) in Muchinga Province-Lot 1 118 TBA TBA 429,962,248.76 16,031,954.00 China Henan International Corporation Group Co. Ltd Notification of Award issued. Contract yet to be signed. Messrs Bari Zambia Ltd/ Beza Consulting Inc 12 Upgrading to Bituminous Standard and Re-Alignment of Approximately 117km Of Road From Nabwalya to Mfuwe (RD 49) in Muchinga province-Lot 2 117 TBA TBA 540,831,954.83 16,031,954.00 Raubex Zambia Limited Notification of Award issued. Contract yet to be signed. Messrs Bari Zambia Ltd/ Beza Consulting Inc 13 Upgrading of D153 from Great East Road at Moono Police Check Point via Palabana to D151 at Lukoshi Basic School (54 Km) Including D566 Silverest Road (4.7km), D156 State Lodge Road (8km) and D154 Palabana-Leopards Hill. 74 10/12/2013 10/06/2015 221,121,397.40 8,971,605.45 Chetak Zambia Limited Contractor Mobilising. Bicon Zambia Limited
  3. 3. 14 Upgrading and Re-Alignment of D301 from Muyombe junction to Chama (32km) and Road from Chama to Luangwa River (42km) including 12km Of Urban Roads – Lot 1 86 14/12/2012 14/12/2015 371,478,275.80. 24.031,546.00 China Civil Engineering Construction (Zambia) Limited. Contract signed, works on-going East Consult Limited 15 Upgrading and Re-Alignment of D301 From Great North Road at Matumbo To Luangwa Bridge, 115km In Muchinga Province – Lot 2 115 14/12/2012 14/12/2015 399, 215,646.07 15,237,760.00 China Jiangxi Corporation for International Economic and Technical Cooperation Contract signed, works on-going Zulu Burrow Development Consultants Limited 16 Contract No. RDA/CE/014/12: Design and Construction of Mansa to Luwingu (M3) Road (175Km) in the Luapula and Northern Provinces and 30Km of Township Roads in Mansa and Luwingu 205 27/01/2013 15/04/2014 $206,962,966.38 10,173,664.00 China Henan International Corporation Group Co. Ltd Contract signed, contractor has mobilized and works are on- going. Bari Zambia Limited 17 Upgrading and Re-Alignment of 74km of the Monze to Niko Road (D365) in Southern Province. 74 TBA TBA 225,148, 449.33 4, 546,492.00 Tongda Construction/Voto Engineering Equipment JV Notification of Award issued. Contract yet to be signed. East Consult 18 Upgrading and Re-Alignment of 78.1Km of Chiengi – Kaputa, 27.6 Km of Chiengi-Luchinda and 10km Kaputa Urban Roads - Lot 1 115.7 TBA TBA 500,040,613.78 9,319,197.85 Copperfields Mining Services-China Henan JV Notification of Award issued. Contract yet to be signed. Rankin Engineering Consultants 19 Upgrading of 58.6 Km Road (D018) from Isoka to Mbesuma Pontoon in Muchinga Province 58.6 TBA TBA 189,551,558.11 TBA Stefanutti Stocks Construction Zambia Limited Notification of Award issued. Contract yet to be signed.TBA/RDA
  4. 4. 2. Engineering Design and Preparation of Tender Documents Lot No. Project Description Road length(km) Start Date Completion Date Contract Sum (Services) (ZMW) Consultant Status 1 Consulting Services for the Detailed Structural Assessment and Engineering Design and Tender document preparation for the repair of 270m of the Kafue hook bridge along Lusaka-Mongu (M009) Road - Western Province N/A 10/2013 04/2014 3,428,816.10 Kiran & Musonda Associates Consulting Engineers Contract Signed & Services are on-going. 2 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the upgrading 270km of the Katunda (M9 Junction) – Lukulu –Watopa – M8 (D792/D557) Road In Western Province 270 10/2013 10/2014 6, 369,792.00 East Consult Limited in Association with Knight Piesold Contract Signed & Services are on-going. 3 Design and supervision of approximately 6Km of the Mpulungu – Lunzua Road (M2 to Lunzua Power Station) from Gravel to Bituminous standard in Mbala Northern province 6 5/07/2013 5/02/2014 1,854,028.00 East Consult Engineers in Association with Knight Piesold Consulting The consultant has submitted the Preliminary Design Report and it is currently under review 4 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the upgrading of 102km of the Limulunga to Lukulu (U1/U13) Road in Western Province. 102 07/2013 04/2014 9,309,599.00 SMEC International Pty Ltd in Association with ZMCK Consulting Engineers The Preliminary Design Report is being prepared following the approval of the inception report. 5 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the upgrading of 135km of the Matebele Shangombo (D102) Road in Western Province. 135 09/2013 06/2014 4,751,824.00 East consult Limited in Association with Knight Piesold Consulting Limited The Preliminary Design Report is being prepared following the approval of the inception report. 6 Techno Economic Study, Detailed Design and Tender Document Preparation for the upgrading of 110Km of the Mansa – Matanda (RD87) Road - Luapula Province 110 6/04/2013 6/02/2014 6,340,938.45 Rankin Engineering Consultants in Association with Aurecon The Final Draft Design Report has been submitted and it is being reviewed.
  5. 5. 7 Techno Economic Study, Detailed Design and Tender Document Preparation for the upgrading of 47Km of the Chembe – Milenge (D102) Road In Luapula Province 47 6/04/2013 20/12/2013 3,588,989.25 Rankin Engineering Consultants in Association with Aurecon The Final Draft Design Report has been submitted and it is being reviewed 8 Consulting Services for the detailed Engineering Design and Tender Document Preparation for the Construction of Bridges at Lunsemfwa and Chipaba Rivers in the Lower Lunsemfwa Area in Mkushi District, Central Province N/A 28/08/2013 28/05/2014 4,930,795.00 Roughton International in Association with BCHOD Contract Signed & Services have commenced. 9 Consulting Services for the detailed Engineering Design and Tender Document Preparation for Upgrading of 176Km of the Samfya – Luwingu (D96/RD429) Road in Luapula province including Supervision component 176 14/11/2012 14/08/2013 20,950,366.00 SATRA Infrastructure Management Services Pty of India. The Preparation of the Draft Final Design Report is under way. 10 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender Document Preparation for the upgrading to bituminous standard of 306km of the Kabwe to Picadily Circus to Mkushi (D200/D207/D214) including the Mpula to Masansa (D208/D209) Roads in Central Province. 306 10/2013 11/2014 6, 810,255.14 Roughton International in Association with BCHOD The consultant submitted the Inception Report. The report has since been reviewed and comments have been transmitted to the consultant. 11 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the upgrading to dual carriageway of 210 km of T2 from Lusaka to Kapiri Mposhi Road in Lusaka and Central Provinces. 210 28/06/2013 28/06/2014 13,451,046.51 SATRA-I-Man Pvt. Ltd in Association with SATRA Zambia & Gibb Africa Inception Report was approved and the Field Surveys and Engineering Investigations commenced on 25th September 2013. 12 Consulting Services for the Design Review and Supervision the Upgrading of 277 km Chipata-Vubwi (via Fern)- Chadiza (D804/R276, RD406) and Chipata-Chadiza- Katete (D128,RD 593,T6) (Lot 2) roads 277 29/11/2013 12/12/2015 22,617,197.44 Ng'andu Consulting Ltd in assoc with Gibb Africa Ltd. Contract Signed & Services are on-going.
  6. 6. in Eastern Province. 13 Consulting Services for the Techno – Economic Study, Detailed Engineering Design and Tender document preparation for the Upgrading of 185 km Katete- U23/D598 Junction and Mtetezi – Msoro (U23 & D598) and Msoro - Chipata (D123) (Lot 2) in Eastern Province. 185 19/06/2013 19/03/2014 5, 412,774.14 Tank Project Solutions Limited The Inception Report has been submitted and reviewed and comments have been transmitted to the consultant for incorporation. 14 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the upgrading of 122km of the Kawambwa - Mporokoso (D019) Road in Northern Province. 122 28/08/2013 28/05/2014 4, 900,015.00 Bicon Zambia in association with Bicon Namibia Contract signed, services have commenced. 15 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the upgrading of 196.5km of the Luwingu to Chilubi Island (D043, RD044 and RD 045) Roads in Northern Province. 196.5 08/2013 09/2014 7,789,252.68 Rankin Engineering Consultants in Association with Aurecon Inception Report Submitted. 16 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the upgrading of 259km of the Luwingu - Kaputa (D039, D036 and D037) in Northern Province. 259 TBA TBA TBA Bicon Zambia in Association with Bicon Namibia Awaiting approval of contract amount. 17 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the upgrading of 220km of the Mporokoso - Kaputa via Mutundu gate (D037) Road in Northern Province. 220 10/08/2013 10/08/2014 9, 883,761.44 SMEC International Pty Ltd in Association with ZMCK Consulting Engineers Revised Inception report submitted
  7. 7. 18 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the upgrading of 63.2km of the Pemba to Mapanza Road (D361) and 74km of the Monze-Niko Road in Southern Province. 137.2 29/08/2013 29/04/2014 4, 546,492.00 East Consult Limited in Association with DASAN Consultants Inception Report Submitted. 19 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the Upgrading of 124km of the Lufwanyama to Kankolonkolo (M18) Road in Copperbelt and North-Western Province. 124 29/08/2013 29/05/2014 4,478,554.88 SATRA-I-Man Pvt Ltd India in Association with Satra Infrastructure Zambia Limited Inception Report Submitted. 20 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the upgrading of Approximately 128.9km of the Mpongwe to Machiya (D468) to D817 Junction Road in Copperbelt and Central Province. 128.9 11/09/2013 13/05/2014 7, 885,718.28 Rankin Consulting Engineers in association with Aurecon Inception Report Submitted. 21 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the upgrading of 225km of the Kasempa Kaoma (D301) Road in Western and North Western Provinces. 225 05/09/2013 05/09/2014 7, 182,780.09 BCHOD in Association with Roughton International Inception Report Submitted. 22 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the upgrading of 327km of the Manyinga to Jimbe via Mwinilunga (D286/T005) Road in North Western Province. 327 29/10/2013 29/10/2014 16, 158,243.20 Jeffares & Green in Association with Zenith Consulting Company Contract signed, services on-going
  8. 8. 23 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the upgrading of 121km of the Solwezi Kipushi (D271) Road in North Western Province. 121 18/11/2013 18/08/2014 8, 499,997.44 Rankin Engineering Consultants in Association with Aurecon Contract signed, services have commenced. 24 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender Document Preparation for the upgrading of 284km of the Mumbwa to Kasempa (D181) Road in Central and North Western Provinces. 284 TBA TBA TBA TBA – Under Evaluation Tender closed – Under Evaluation 25 Consultancy Services for the Design Review and Supervision of the upgrading to bituminous standard of 91km of the Luangwa Bridge to Feira (D145) Road in Lusaka Province 91 12/04/2013 12/04/2015 12,779,792.04 Bicon Zambia in Association with Grontmij A/S Contract signed, services are on-going 26 Consulting Services for the Techno-Economic Study, Detailed Engineering Design and Tender document preparation for the upgrading to bituminous standard of 216km of the Leopards Hill Road through Chiawa to Chirundu (D152, D481, D482) including Palabana/ Silverest/ Chalimbana (D153, D566, D151, RD149, D150 and D156) Roads in Lusaka Province 216 28/08/2013 28/05/2014 8,971,605.45 Bicon Zambia in association with Grontmij A/S Contract signed and Services are on-going 27 The Construction of Bridges at Luangwa and Kampemba Rivers in Chama District of Muchinga Province N/A 24/05/2013 24/01/2015 8,576,352.20 Kiran & Musonda Associates Consulting Engineers Contract signed, services are on-going. 28 Design Review and Supervision of the Construction/Upgrading of the Mansa-Luwingu (M003) Road (175km) in Luapula and Northern Provinces and 30km of Township Roads in Mansa and Luwingu 205 09/2013 10/2016 10,173,664.00 Bari Zambia Limited Contract signed, services have commenced.
  9. 9. 29 Design Review and Supervision of the Construction/Upgrading of 158Km of the Kawambwa- Mushota-Luwingu road and the Chisembe-Chibote-Chief Chama in Luapula Province 158 07/07/2013 07/09/2015 7, 302,332.30 BCHOD Consulting Engineers Contract signed, services are on-going. 30 Consultancy Services for the Techno-Economic Study, Detailed Engineering Designs and Tender document preparation for the upgrading to bituminous standard of 176 Km of Nchelenge (via Chiengi) to Kaputa Road. 176 17/10/2012 17/08/2013 9,319,197.85 Rankin Engineering Consultants in Association with Aurecon Contract signed, services are on-going. 3. Other Road Projects No. Project Road Length (Km) Start Date Completion Date Contract Sum- Works (ZMW) Contract Sum- Services (ZMW) Contractor/Consultant Status 1 Rehabilitation of 51.1km of Lusaka - Chirundu Road Link 3 51.1 18/01/2013 08/01/2015 215,187,851.11 5,960,000,000.00 + USD 841, 600.00 China Henan International Corporation Group Co. Ltd Contract signed. Works have commenced.Grontmij A/S in Association with Bicon Zambia 2 Rehabilitation of 17.9km of Lusaka - Chirundu Road Links 1 & 2 17.9 22/10/2012 21/10/2013 54,369,817.67 Included under link 3 China Henan International Corporation Group Co. Ltd Contract signed, works on-goingGrontmij A/S in Association with Bicon Zambia 3 Chiawa Bridge Project N/A 22/10/2012 21/10/2013 53,862,763.58 TBA China Henan International Corporation Group Co. Ltd Contract signed, works on-going Arab Consulting Engineers in Association with Civil struts Consulting Engineers of Zambia 4 Mufuchani Bridge Resettlement Dwelling N/A 10/10/2012 06/08/2013 17,072,980.00 592,086.00 Mango Tree Construction Company Works Substantially Completed Touchline Design Consultants
  10. 10. 5 Lusaka L400 Project 408 05/2013 12/2016 $348milion TBA AVIC International Contract signed. Works have commenced. RDA/TBA 6 Rehabilitation of 34.47 km of Kabwe and Kapiri Mposhi Urban Roads 34.47 19/10/2012 19/12/2013 163,801,790.40 15,861,789.52 Asphalt Roads Zambia Limited Contract signed. Works are on-going.NWE Consulting Engineers 7 Rehabilitation of 23.35 Km of selected Chingola Urban Roads 23.35 02/07/2012 02/08/2013 81,998,173.90 3,386,617.40 Mivami Construction Zambia Limited Contract awarded. Project launched on 07/09/12E. G. Petit & Partners 8 Rehabilitation of 53 km of selected Livingstone City Roads 53 27/11/2012 06/12/2013 234,482,717.79 1,903,862.15 – Inyatsi Roads Zambia Limited Works substantially complete.BCHOD Consulting Engineers 9 Periodic maintenance of 70 Km of Kapiri - Kabwe Road (T002) Project 70 28/02/2013 13/06/2014 144,079,095.04 6,080,501.11 Road & Paving Zambia Limited Contract signed. Works are on-going.Rankin Consulting Engineers 10 Periodic Maintenance of Ndola -Kitwe Dual Carriageway (60Km) 60 28/11/2012 28/05/2014 290,287,688.31 8,726,680.00 China Jiangxi Corporation for International Economic and Technical Cooperation Rehabilitation works are on-going. Ng'andu Consulting Limited 11 Periodic Maintenance Mansa - Nchelenge (245km) Road Project 245 17/08/2012 31/09/2013 85,725,948,649.94 3,370,960.00 China Geo – Engineering Corporation Contract signed. Works have commenced.GAUF Engineering 12 Rehabilitation of T004 Great East Road - Nyimba to Sinda (114.78Km) 114.7 01/06/2013 30/03/2015 361,187,528.35 12,191,236.78 Conduril Engenharia S.A Contract signed. Contractor has mobilized. SMEC International Pty Ltd in Association with ZMCK Consulting Engineers 13 Upgrading of (158km) of Kawambwa - Mushota Road Project 158 15/03/2013 5/03/2015 258,773,699.00 7,302,332.30 Unik Construction Engineering Zambia Limited Contract signed. Works are on-going.BCHOD Consulting Engineers 14 Mufuchani Bridge Project N/A TBA TBA TBA TBA TBA Works Under Procurement.US$497,410.00 +ZMW1,928,625.00 Royal Haskoning DHV
  11. 11. 15 Periodic Maintenance of 169Km of Road T005 from Solwezi to Chingola in the Copperbelt and North Western provinces 169 15/02/2013 15/02/2014 70,767,718.00 8,457,692.96 Roads & Pavings Works are on-going Rankin Engineering Consultants 16 Consultancy Services for the Detailed Design of Dwellings, Access Roads and Community School, Preparation of Bidding Documents and Supervision Services for the Kazungula Abbreviated Resettlement Action Plan N/A 25/02/2013 25/02/2014 21,095,195.91 1,330,500.00 Mutema Architects in Association with Civil Struts Consulting Engineers, HB Chalwa Associates and DH Engineering Consultants Contract signed and services have since commenced. 17 Consultancy Services for the Techno-Economic Study, Detailed Designs for the Rehabilitation of Sabina-Mufulira-Ndola Road and T3-Kalulushi M16 (13.5Km) on the Copperbelt Province 108.1 10/12/2012 10/06/2013 80,613,043.40 3,441,372.00 Zulu Burrow Development Consultants Contract signed and services are on-going 18 Rehabilitation of 131.5Km of Bottom Road 131.5 29/08/2011 27/02/2015 249,303,294.77 10,870,141.92 China Henan International Corporation Group Co. Ltd Works are on-going Bicon Zambia Limited 19 Upgrading of 70Km Pedicle including Lubembe Bridge 70 2/11/2012 11/11/2014 278,824,387.16 9,532,230.51 Revised Sum Copperfield Mining Services Limited Works are on-going Rankin Engineering Consultants 20 Upgrading of 171.9Km of Mbala – Nakonde road 171.9 18/04/2012 17/04/2016 US$180,000,000.00 8,109,235.200 China CAMC Engineering Co. Works are on-going Bari Zambia Limited 21 Kazungula Bridge Project TBA TBA TBA TBA TBA Under Evaluation
  12. 12. 22 Consultancy Services for the Design Review, Detailed Engineering Design and Supervision of 72km of the Turn Pike to Mazabuka Road in Southern Province 72 24/06/2013 24/09/2014 TBA 4, 354,988.00 WCE Zambia Limited Contract signed, services have commenced. 22 Consultancy Services for the Supervision of the Rehabilitation/ Upgrading of approximately 33.82km of Selected Urban Roads in Ndola in the Copperbelt Province. 33.82 24/08/2013 24/02/2014 139,270,689.00 5,825,417.35 Gomes Haulage Zambia limited Contracts signed, works and services are on-going. Bicon Zambia Limited 23 Consulting Periodic maintenance of Approximately 10km of the T004 Great East Road from Arcades to Airport Junction in Lusaka Province. 10 9/12/2013 9/05/2014 65,356,865.10 2,661,516.00 Stefanutti Stocks Construction Zambia Consultancy Contracts signed services are on-going. Easconsult Limited in Association with Knight Piesold 24 Construction of Mwamba Bridge Across the Lukupa River in Kasama TBA TBA TBA 5,908,096.92 N/A Tomorrow Investments Limited Notification of Award issued. Contract yet to be signed. 25 Provision of Consulting Services for Short Term Technical Assistance to the Design Unit under the Planning and Design Department of the Road Development Agency (RDA) N/A TBA TBA N/A 1,184,120.29 Royal Haskoning DHV (Pty) Limited Contract to be signed in March 2014. Eng. Bernard Mwape Chiwala Director and Chief Executive Officer ROAD DEVELOPMENT AGENCY Facsimile: 260 (1) 253404/251420

×