Your SlideShare is downloading. ×
0
Gis Rail Summit Esri France
Gis Rail Summit Esri France
Gis Rail Summit Esri France
Gis Rail Summit Esri France
Gis Rail Summit Esri France
Gis Rail Summit Esri France
Gis Rail Summit Esri France
Gis Rail Summit Esri France
Gis Rail Summit Esri France
Gis Rail Summit Esri France
Gis Rail Summit Esri France
Gis Rail Summit Esri France
Gis Rail Summit Esri France
Gis Rail Summit Esri France
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Gis Rail Summit Esri France

1,334

Published on

Published in: Business, Technology
0 Comments
3 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
1,334
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
3
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Management of data quality in a multi-partner context European Rail GIS Summit, 4 June 2010 - UIC   Dominique Cuppens, Chief Information Officer - RFF Philippe Bauchot, President of Adyal Grands Comptes (AGC) Amaury Marchal, GIS Projects Manager - RFF
  • 2. RFF, the pivot of a multi-player railway system European Rail GIS Summit – 3 & 4 June 2010 In this open system, where the players are both consumers and producers, GIS is one of the best solutions for structuring publication of reference data. Other Railway Infrastructure Administrators (FR and EU) Regulator ARAF European Union French State Government Parliament Shippers Final freight customers Railway Companies Public / Private Partnerships Regions Local transport authorities Local Railway Operators Partners Suppliers Association FNAUT, FNE, … Business to Administration Business to Business Business to Citizen
  • 3. The maturity increase European Rail GIS Summit – 3 & 4 June 2010 Reduction of time cycle maturity Needs and standardisation Quality management Information system Acquisition and control process IS contracting Governance In the case of real estate an operation implemented in 3 years time Dec 2007 Aug 2005 Aug 2008 Jan 2006 Jan 2007 Enrichment of real estate data New data
  • 4. 95% 95% 100% 90% 80% 80% Landholdings 100% Needs and standardisation Governance Acquisition and control process Contracting Information system Quality management National coverage 95% 95% 100% 80% 90% 80% Land occupancy 100% 90% 95% 90% 70% 90% 90% Possessions 100% 80% 95% 100% 90% 80% 90% Real estate valuation 100% 50% 10% 10% 20% 70% 20% Environment of major projects 10% 90% 75% 50% 50% 50% 40% Level crossings 95% 80% 10% 10% 20% 90% 20% Major project routes & sectors 10% Maturity of GIS data European Rail GIS Summit – 3 & 4 June 2010
  • 5. The case of real estate data: a setup that enables integrated functioning European Rail GIS Summit – 3 & 4 June 2010 <ul><li>Réseau Ferré de France (RFF) and Adyal Grands Comptes (AGC) have concluded contracts together on 2 complementary subjects: </li></ul><ul><ul><li>Real estate property management (for 60 % of the territory), </li></ul></ul><ul><ul><li>Management and operation of asset representation systems. </li></ul></ul><ul><ul><ul><li>Positioning as data supplier and customer </li></ul></ul></ul><ul><ul><ul><li>Better understanding of needs and challenges </li></ul></ul></ul><ul><ul><ul><li>Need for quality and efficiency which results in a particularly dynamic process </li></ul></ul></ul>
  • 6. To succeed, start with the fundamentals European Rail GIS Summit – 3 & 4 June 2010 <ul><ul><ul><ul><li>Complex problems must only be addressed once the fundamentals have been mastered. </li></ul></ul></ul></ul>
  • 7. The result for the real estate domain Geoprism 200,000 plots of land 50,000 buildings 33,000 km of off-site assets 13,000 sites 400 users Operator Internal customers External customers SINGLE INSTANCE SYSTEM PROCESSES & CONTROL CONTRACTS & COLLABORATION
  • 8. Technical architecture for a collaborative, open and protected extranet European Rail GIS Summit – 3 & 4 June 2010 France Raster Database Server Flash Client for readers File server Datawarehouse ArcGIS cache ArcGIS Desktop Heavy client user Extranet / Intranet ArcGIS Server (ArcSDE) Carto server no.2 Light client user Profiles / users Administration Rights Data loading Environment Infrastructure Assets Citrix clients for the update Put into operation on 24 May 2010 ArcGIS Server (ArcSDE) Carto server no.1 Scan Ortho … Scan Ortho …
  • 9. D emonstration European Rail GIS Summit – 3 & 4 June 2010
  • 10.  
  • 11.  
  • 12.  
  • 13. A frame of reference for performance of the railway system Partnership Reference platform Method & industrialisation UNIQUENESS SIMPLICITY INTEGRATED WORK
  • 14. T hank you for your attention European Rail GIS Summit – 3 & 4 June 2010

×