• Save
Gis Rail Summit Esri France
Upcoming SlideShare
Loading in...5
×
 

Gis Rail Summit Esri France

on

  • 1,758 views

 

Statistics

Views

Total Views
1,758
Views on SlideShare
1,734
Embed Views
24

Actions

Likes
2
Downloads
0
Comments
0

4 Embeds 24

http://www.slideshare.net 17
http://www.linkedin.com 4
https://www.linkedin.com 2
http://www.lmodules.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Gis Rail Summit Esri France Gis Rail Summit Esri France Presentation Transcript

    • Management of data quality in a multi-partner context European Rail GIS Summit, 4 June 2010 - UIC   Dominique Cuppens, Chief Information Officer - RFF Philippe Bauchot, President of Adyal Grands Comptes (AGC) Amaury Marchal, GIS Projects Manager - RFF
    • RFF, the pivot of a multi-player railway system European Rail GIS Summit – 3 & 4 June 2010 In this open system, where the players are both consumers and producers, GIS is one of the best solutions for structuring publication of reference data. Other Railway Infrastructure Administrators (FR and EU) Regulator ARAF European Union French State Government Parliament Shippers Final freight customers Railway Companies Public / Private Partnerships Regions Local transport authorities Local Railway Operators Partners Suppliers Association FNAUT, FNE, … Business to Administration Business to Business Business to Citizen
    • The maturity increase European Rail GIS Summit – 3 & 4 June 2010 Reduction of time cycle maturity Needs and standardisation Quality management Information system Acquisition and control process IS contracting Governance In the case of real estate an operation implemented in 3 years time Dec 2007 Aug 2005 Aug 2008 Jan 2006 Jan 2007 Enrichment of real estate data New data
    • 95% 95% 100% 90% 80% 80% Landholdings 100% Needs and standardisation Governance Acquisition and control process Contracting Information system Quality management National coverage 95% 95% 100% 80% 90% 80% Land occupancy 100% 90% 95% 90% 70% 90% 90% Possessions 100% 80% 95% 100% 90% 80% 90% Real estate valuation 100% 50% 10% 10% 20% 70% 20% Environment of major projects 10% 90% 75% 50% 50% 50% 40% Level crossings 95% 80% 10% 10% 20% 90% 20% Major project routes & sectors 10% Maturity of GIS data European Rail GIS Summit – 3 & 4 June 2010
    • The case of real estate data: a setup that enables integrated functioning European Rail GIS Summit – 3 & 4 June 2010
      • Réseau Ferré de France (RFF) and Adyal Grands Comptes (AGC) have concluded contracts together on 2 complementary subjects:
        • Real estate property management (for 60 % of the territory),
        • Management and operation of asset representation systems.
          • Positioning as data supplier and customer
          • Better understanding of needs and challenges
          • Need for quality and efficiency which results in a particularly dynamic process
    • To succeed, start with the fundamentals European Rail GIS Summit – 3 & 4 June 2010
            • Complex problems must only be addressed once the fundamentals have been mastered.
    • The result for the real estate domain Geoprism 200,000 plots of land 50,000 buildings 33,000 km of off-site assets 13,000 sites 400 users Operator Internal customers External customers SINGLE INSTANCE SYSTEM PROCESSES & CONTROL CONTRACTS & COLLABORATION
    • Technical architecture for a collaborative, open and protected extranet European Rail GIS Summit – 3 & 4 June 2010 France Raster Database Server Flash Client for readers File server Datawarehouse ArcGIS cache ArcGIS Desktop Heavy client user Extranet / Intranet ArcGIS Server (ArcSDE) Carto server no.2 Light client user Profiles / users Administration Rights Data loading Environment Infrastructure Assets Citrix clients for the update Put into operation on 24 May 2010 ArcGIS Server (ArcSDE) Carto server no.1 Scan Ortho … Scan Ortho …
    • D emonstration European Rail GIS Summit – 3 & 4 June 2010
    •  
    •  
    •  
    • A frame of reference for performance of the railway system Partnership Reference platform Method & industrialisation UNIQUENESS SIMPLICITY INTEGRATED WORK
    • T hank you for your attention European Rail GIS Summit – 3 & 4 June 2010