  1. 1. Magento 2 Status Execution Timeline Tracks Product Status Milestones • 11/22 M3 Grooming complete • Notes/ Risks • 12/13 MLS Code Complete POC service layer and DB access need to proceed longer to gain insight Design Engineering Quality • • Defect count high Automation November 22, 2013 1
  2. 2. Program Items Task/issue Description Issue / Notes Owner(s) Resolution Dates UX Design Grooming Milestone 2 Design epics prioritized, estimated for Milestone 2 • Groom • Admin Panel 80% • Patterns 100% • Luma 70% • Jonathon/Priya nka/PMO • • 10/18 11/8 1.X Code merge Plan for M3 Plan for code merging features/ fixes forward • • • Andrew/Dhiraj • 12/1 • Delayed until Milestone 3 1.13 plan needs to be coordinated with Mage 2 Scope determined 11/25 Roadmap Schedule High level Roadmap to deliver Developer Beta • Need Final Scope and estimated • Tom • • • 10/25 11/8 11/21 Quality for Milestone 2 and beyond We need to improve visibility into testing • • • • • • Detailed Test Plan Test Coverage Automation plan Metrics Release Criteria Scope of defects to be addressed • Tymur /Ahrey • 11/1 Outsource Jquery RFP process for Jquery work • • Evaluation of vendors responses Selection by EOW • Dhiraj • 11/15 Responsive Web Design Outsource Responsive Web Design • • Vendor Selection in progress Tracking as part of 1.13 • Andrew Magento 2 State of the Delivery 2
  3. 3. Overall Version Burn-up Friday, November 22, 2013 3
  4. 4. Team SP Projected Completion Team Committed SP Projected At 12/13 Overall Arctic Owls Dragons Extensibility Firedrakes Folks Goinc MPI Polar Seals South Tango Troll UXMen UX @PM Voodoo Web Dev Unassigned 1745.6 80.5 66.5 50 61 105 97 96.5 80 36 134 118 80 90 50 88 410.5 36 181 14.5 25.5 1654 1498 71 83 65 54 56 52 POC 130 114 106 86 70 78 47 41 163 142 95 78 95 107 55 58 130 105 196 24 19 POC 248 214 14.5 25.5 Git hub pull request Mid-Sprint skews the projections Notes Friday, November 22, 2013 4
  5. 5. Epics Epic ID Description Epic Report Progress in SP MAGETWO-14591 Modularity: "App" Component Epic Report Notes 47.5/68.5 47.5/68.5 MAGETWO-14593 Modularity: "View" component Epic Report 42/58 5058 MAGETWO-971 Modularity: Backend Epic Report 23/33.5 23.5/30 MAGETWO-11098 Modularity: Other Core Framework Components Epic Report 63/83 63/87 MAGETWO-13164 Update Themes in M2 Epic Report 105/126 113/126 MAGETWO-14074 Basic Acceptance Functional Test Suite Epic Report 29/29 MAGETWO-10852 Public Github Support Epic Report 11/25 16/25 MAGETWO-11293 Regular GitHub Pull Requests Processing Epic Report 5/32 14/32 MAGETWO-10867 Optimizations in base templates (phtml files in M2 Epic Report 0/71 Epic Report Product Removed this epic from Milestone 2 98/197.5 modules) MAGETWO-4017 Fixing Outstanding Bugs (Milestone2) 114/197.5 MAGETWO-14380 Tech Debt (Milestone 2) Epic Report 43/53 48/53 MAGETWO-14239 Layout Improvements (Milestone 2) Epic Report 29/29 MAGETWO-11757 Magento_Filesystem Library Epic Report 16/56 21/48 Friday, November 22, 2013 5
  6. 6. Epics Epic ID Description Report Progress in SP MAGETWO-11242 Web API Framework: Authorization [c2] Epic Report Notes 14/51 19/51 MAGETWO-9996 Patterns Epic Report 91/99 91/99 MAGETWO-11046 Luma Reference Responsive Theme Epic Report 29/149 22/154 MAGETWO-15464 Improvements and fixes on Admin Panel (UX) Epic Report 13/55 21/55 MAGETWO-15216 Twig Template Engine Removal Epic Report 3.5/3.5 MAGETWO-4163 Modularity: Application Areas Rework Epic Report 20/29 20/29 MAGETWO-14077 Functional automated test coverage on end- Epic Report 32/188 to-end scenarios Benchmarking process and environment using Epic Report 20/41 LVS MAGETWO-10555 34/159 33/46 MAGETWO-12230 No Direct Code Execution from Layout XML Epic report 13/13 MAGETWO-10854 [DOC] Documentation Support Epic Report 0/0 MAGETWO-12738 Regression Testing Activities (QA) Epic Report MAGETWO-11919 Admin Panel Look & Feel Consistency (UX) Epic Report Support stories Support stories 0/123 0/123 MAGETWO-11858 Digital Pattern Library (UX) Epic Report 0/26 Moved to Milestone 3 by PM MAGETWO-15925 Service Strategy Validation (Prototype Epic Report 26/49 POC – the SP will change Customer Module) MAGETWO-16044 Data Access Layer Prototype 30/59 Epic Report 8/31 PCO– the SP will change 8/31 Friday, November 22, 2013 6
  7. 7. Appendix Presentation Title Goes Here 7
  8. 8. Quality Defect Trend 1200 1000 436 420 429 423 417 422 600 338 400 200 195 202 213 219 224 243 255 279 Number of Defects 800 898 863 828 793 758 723 688 653 618 583 568 548 513 495 478 443 408 373 338 303 268 233 198 163 128 93 Find&Fix 35/70 Week Actual Open Linear (Actual Open) 58 23 0 8/4/13 9/4/13 10/4/13 11/4/13 12/4/13 1/4/14 2/4/14 3/4/14 4/4/14 5/4/14 6/4/14 Friday, November 22, 2013 8
  9. 9. Proposed Release Timeline • Scope needs to be finalized • The table on the right projects the “size of the content” • Several Epics are still not estimated • Defects have not be accounted for in the estimated Epics in Milestone 3 split between 3 and 4. Row Labels Sum of Epic Points Sum of DevDays Milestone1 109 1286 Milestone2 178 2212 Milestone3 135 1835 Milestone4 160 1850 Removed from M3 61 659 Grand Total 643 7842 November 22, 2013 9

×