King Street Station 7.28.11 slide show

  • 5,231 views
Uploaded on

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
5,231
On Slideshare
0
From Embeds
0
Number of Embeds
2

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Phase 2A
    In this slide show:
    12th Floor Tower Lighting
    July 28, 2011
  • 2. New lighting has been installed to improve illumination of the glass pyramid at the top of the tower.
  • 3. Another interior view of the glass pyramid.
  • 4. These reels raised and lowered the fluorescent lights that were used to illuminate the space before the new lighting replacement.
  • 5. These fixtures can be individually adjusted for the best angle of illumination.
  • 6. A view looking up the top of the tower shows the glass pyramid evenly lit.
  • 7.
  • 8. New ticketing area
  • 9. A close-up view of the new ticket counter.
  • 10. Cabinets behind the ticketing counters are still under installation.
  • 11. Mezzanine break room for Amtrak employees
  • 12. New mezzanine restroom for Amtrak employees
  • 13. These refurbished windows provide natural lighting for both the station level and the new mezzanine level.
  • 14. Man lift for Amtrak’s new operations area
  • 15. A view inside the man lift.
  • 16. West side driveway repaved after the completion of geothermal wells installation.
  • 17. A view of the new bus/taxi queuing route from the station’s 12th floor balcony.
  • 18. Installation of new terrazzo treads for the Grand Stairs is almost complete.
  • 19. The New Jackson Plaza beautifully blend in with the city landscape.