Your SlideShare is downloading. ×
0
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

King Street Station Marble Wall Installation3.3.11 slide show

1,492

Published on

Published in: Art & Photos
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,492
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Phase 2A<br />In this slide show: <br />Marble Wall Installation<br />March 3, 2011<br />
  • 2. Original marble panels returned to site to be reinstalled onto new walls.<br />
  • 3. Masons carefully installed marble panels back onto its original locations.<br />
  • 4. The intricate reinstallation process preserves the historic marble. <br />
  • 5. Original baggage area with its marble walls fully reinstalled. <br />
  • 6. A bare column waiting to be wrapped with marble. <br />
  • 7. A column with its marble reinstalled. <br />
  • 8. Damaged granite on the west wall being replaced with salvaged granite. <br />
  • 9. New northeast plaza column erected to support the sidewalk above. <br />
  • 10. Decorative plaster panels on the 2nd floor balcony were removed during structural investigations.<br />
  • 11. Removed plaster pieces were carefully catalogued for future reference.<br />
  • 12. Designate waste containers help keep the work area clean and green. <br />
  • 13. Sound proof insulation framework installed adjacent to shear wall. <br />
  • 14. New interior partitions inside baggage area. <br />
  • 15. Trench drains shown will help divert water and prevent flooding on Jackson Plaza. <br />
  • 16. Aerial view of Jackson Plaza with tree planter forms in place.<br />
  • 17. Future planters will make Jackson Plaza a welcoming pedestrian area. <br />

×