• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Bridging the Gap - A sampling of completed work
 

Bridging the Gap - A sampling of completed work

on

  • 11,648 views

 

Statistics

Views

Total Views
11,648
Views on SlideShare
489
Embed Views
11,159

Actions

Likes
0
Downloads
8
Comments
0

11 Embeds 11,159

http://www.seattle.gov 10857
http://seattle.gov 228
http://www.cityofseattle.net 48
http://www9.seattle.gov 13
http://webcache.googleusercontent.com 4
http://www.ci.seattle.wa.us 2
http://translate.googleusercontent.com 2
http://igx8.seattle.gov 2
http://66.249.89.132 1
http://www.google.com 1
https://www.seattle.gov 1
More...

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Bridging the Gap - A sampling of completed work Bridging the Gap - A sampling of completed work Presentation Transcript

    • At Work in Seattle
    • Burke Gilman Trail Extension Opening
    • Dunlap SRTS project
    • Sanislo SRTS project
    • Arbor Heights SRTS Project
    • Sixth Avenue – Before & After
    • N 133rd looking W Before & After
    • South Washington St Before & After
    • New Crosswalk
    • New Signal
    • New Stairway
    • New Sign
    • First Avenue A green bike lane is installed
    • New Guardrail
    • Tree Pruning
    • New Rubber Sidewalk
    • 15th Ave
    • Fifth Avenue
    •