At Work in Seattle
Burke Gilman Trail Extension Opening
Dunlap SRTS project
Sanislo SRTS project
Arbor Heights SRTS Project
Sixth Avenue – Before & After
N 133rd looking W Before & After
South Washington St Before & After
New Crosswalk
New Signal
New Stairway
New Sign
First Avenue A green bike lane is installed
New Guardrail
Tree Pruning
New Rubber Sidewalk
15th Ave
Fifth Avenue
 
Upcoming SlideShare
Loading in …5
×

Bridging the Gap - A sampling of completed work

11,254 views
11,251 views

Published on

Published in: Art & Photos, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
11,254
On SlideShare
0
From Embeds
0
Number of Embeds
11,216
Actions
Shares
0
Downloads
9
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Bridging the Gap - A sampling of completed work

  1. 1. At Work in Seattle
  2. 2. Burke Gilman Trail Extension Opening
  3. 3. Dunlap SRTS project
  4. 4. Sanislo SRTS project
  5. 5. Arbor Heights SRTS Project
  6. 6. Sixth Avenue – Before & After
  7. 7. N 133rd looking W Before & After
  8. 8. South Washington St Before & After
  9. 9. New Crosswalk
  10. 10. New Signal
  11. 11. New Stairway
  12. 12. New Sign
  13. 13. First Avenue A green bike lane is installed
  14. 14. New Guardrail
  15. 15. Tree Pruning
  16. 16. New Rubber Sidewalk
  17. 17. 15th Ave
  18. 18. Fifth Avenue

×