7.8.11 Grand Staircase &  Under Jackson Plaza
Upcoming SlideShare
Loading in...5
×
 

7.8.11 Grand Staircase & Under Jackson Plaza

on

  • 2,537 views

 

Statistics

Views

Total Views
2,537
Views on SlideShare
1,350
Embed Views
1,187

Actions

Likes
0
Downloads
0
Comments
0

6 Embeds 1,187

http://www.seattle.gov 1162
http://www.cityofseattle.net 11
http://seattle.gov 6
http://seattle.gov 6
http://www9.seattle.gov 1
http://www.ci.seattle.wa.us 1

Accessibility

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

7.8.11 Grand Staircase &  Under Jackson Plaza 7.8.11 Grand Staircase & Under Jackson Plaza Presentation Transcript

  • Phase 2A
    In this slide show:
    Grand Staircase &
    Under Jackson Plaza
    July 8, 2011
  • The Jackson Plaza is now partially opened to the public.
  • Restoration of the Grand Stairs is nearly complete and will be open soon.
  • The black light post illuminates the plaza. Historic replicas of the original cast iron lights on the granite balustrade will be added later.
  • New flower baskets, lighting and gutters installed under the north side canopy.
  • This partial test-piece shows reproduced historiccopper flashings to be installed along the north and west canopy trim.
  • All chains supporting the canopy will be restored and painted.
  • Site of the 31 new geothermal wells. The wells are connected and reach the mechanical room under the plaza.
  • Terrazzo steps for the Grand Stairs delivered onsite for installation.
  • The Grand Stairs will be open to the public by fall 2011.
  • Stainless steel hand rails installed on the rehabilitated Grand Stairs.
  • The Grand Stairs provide access to the main waiting room and new baggage and ticket areas.
  • Installation of wooden counters in the baggage and ticketing area is underway.
  • Columns and structural shear wall recently painted for extra durability.
  • Electric lift will provide access for disable personnel from terminal level to Amtrak break room.
  • Lift seen from mezzanine level.
  • Steel guards provide safety when viewing the track.
  • New west side geothermal wells are waiting to be connected to the rest of system.
  • The geothermal wells will provide 100 percent heating and cooling for the entire building.
  • New guard plates were installed to protect structural columns along Jackson Street.