2.11.2013 King Street Station
 

2.11.2013 King Street Station

on

  • 2,140 views

Waiting Room Plaster Work Update

Waiting Room Plaster Work Update

Statistics

Views

Total Views
2,140
Views on SlideShare
669
Embed Views
1,471

Actions

Likes
0
Downloads
0
Comments
1

1 Embed 1,471

http://www.seattle.gov 1471

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel

11 of 1 previous next

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
  • Thank you for sharing this! It's extremely interesting. The public appreciates what you are doing, and the workmanship involved. They just don't make these buildings like they used to! Good job!
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • White paint final color or just under coat?Was all original plaster white?Turn yellow overtime?Chandelier in the making? Made of glass and brasss?
  • Men’s restroom ahead?Total number of exits?Newaddional wall plugs for computers?Fire sprinklers system? Terraso floors repair?
  • Lighting source? Orginal Plaster condition still good after 100+ years?
  • What Richter scale can the new building stand? Bricks or floor finishes? Brick and floor condition?

2.11.2013 King Street Station 2.11.2013 King Street Station Presentation Transcript

  • Phase 2B In this slide show:Waiting Room Plaster Work Update February 11, 2013
  • The waiting room looking east towards the trackside. Most of the vertical plaster work has beencompleted.
  • A northeast view towards the future Men’s room.
  • A view looking north towards Amtrak’s new ticketing area. New lighting for the waiting roomand the second floor balcony with be LEDs to maximize efficiency.
  • The beautiful quarter circle balcony is almost fully repaired. The original damaged terrazzo floorhidden under the plywood will also be repaired.
  • A view looking southwest. The original plaster is in surprisingly good condition. The new maincenter chandelier will be a replicate with high powered LEDs for illumination.
  • A section of ceiling along the east wall with its final glossy white finish, similar to the originalcondition when the station was first opened to the public in 1906.
  • The mustard color shown is oneof several paint colors appliedover the years. The final colorfor the plaster will be white asseen here.
  • Due to aesthetic reasons a sprinkler system will not be installed in the waiting room. Instead,beam smoke detectors and 7 double door exits will ensure safe egress during emergency.
  • The waiting room west wall will get anew 3 feet diameter clock.
  • Left: Looking into the newstairwell in the waitingroom.Right: Looking at the waitingroom from inside the newstairwell.Bottom: The new stairwaywill provide public access tothe second floor balcony.
  • New marble column panels were beinginstalled next to the main waiting area.
  • New and original plaster pieces mergetogether seamlessly.
  • Multiple elevated scaffolding was installed to aid in plaster restoration.
  • An original plaster detail shown with its damages repaired.
  • All tower levels will havereinforcements over its originalcross frames. 4 new additionalcolumns were also installed foradditional load bearing on eachfloor. The brick walls and floorslabs are in mostly goodcondition. An identifieddamaged section on the 9thfloor was repaired.