• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
071611 slideshow phase2a
 

071611 slideshow phase2a

on

  • 4,987 views

King Street Station Restoration Project

King Street Station Restoration Project

Phase 2A
Geothermal wells and first floor mezzanine

Statistics

Views

Total Views
4,987
Views on SlideShare
1,035
Embed Views
3,952

Actions

Likes
0
Downloads
0
Comments
0

6 Embeds 3,952

http://www.seattle.gov 3875
http://www.cityofseattle.net 64
http://seattle.gov 9
http://www9.seattle.gov 2
http://webcache.googleusercontent.com 1
http://www.ci.seattle.wa.us 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    071611 slideshow phase2a 071611 slideshow phase2a Presentation Transcript

    • Phase 2A
      In this slide show:
      Geothermal wells and first floor mezzanine
      July 16, 2011
    • The additional geothermal wells on the west side installed and connected with the rest of the geothermal network under the plaza.
    • The west side street repaved and painted with new Amtrak bus queuing boundaries.
    • The new turn around system will improve Amtrak bus access.
    • Original under-plaza geothermal wells on the left. New west side wells on the right. Both are now connected for operation.
    • Grand stair terrazzo treads and rails mobilized onsite for installation.
    • The new terrazzo treads are beautiful and match the original .
    • Half the terrazzo treads installed at top of the stair.
    • Original brass rails installed on the sides of the stairway.
    • Ticketing desks are being installed.
    • New ticketing counters match the original appearance.
    • A view of the drawers behind the ticketing counters.
    • Additional counters are also being installed behind the ticketing desks.
    • The mezzanine stairs and lift are fully installed connecting the first floor Amtrak offices to additional space above.
    • Carpet and lighting are in place for the mezzanine level.
    • A skilled technician working with the ceiling in the mezzanine.
    • Carpet installation for Amtrak break room.
    • Dedicated restrooms for all Amtrak employees.
    • A ceiling will be installed to cover these mechanicals under the plaza.