IPD – A Project Delivery Approach“Integrated Project Delivery (IPD) is a project delivery approach that integrates people,...
IPD approach                                                                          100%                          Pre-Co...
Traditional approach                       3
The big room – UCSF Mission Bay                                  4
Cost Transparency Detailed Cost of Work estimates are developed               “in the light of day”                       ...
Risks/Rewards
IPD Contract Resources• AIA Contracts – Transitional Forms: A195, A295 and B195 – Multi-Party Agreements: C191 – The Singl...
Case Studies –Sutter Medical CentersMilestones                Sacramento (Traditional)   Castro Valley (Lean/IPD)Total pro...
Upcoming SlideShare
Loading in …5
×

Integrated project delivery for more effective development

913
-1

Published on

Integrated Project Delivery (IPD) is a project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all participants to optimize project results, increase value to the owner, reduce waste, and maximize efficiency through all phases of design, fabrication, and construction.

Published in: Education, Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
913
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
19
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Integrated project delivery for more effective development

  1. 1. IPD – A Project Delivery Approach“Integrated Project Delivery (IPD) is a project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all participants to optimize project results, increase value to the owner, reduce waste, and maximize efficiency through all phases of design, fabrication, and construction.”[“Integrated Project Delivery: A Guide,” published jointly by the American Institute of Architects California Council and the American Institute of Architects.] 1
  2. 2. IPD approach 100% Pre-Construction Services ConstructionUnderstanding Common Architect Hired CM/GC Hired Engineers Hired Major Trades Hired SD DD CD Time 2 2 2
  3. 3. Traditional approach 3
  4. 4. The big room – UCSF Mission Bay 4
  5. 5. Cost Transparency Detailed Cost of Work estimates are developed “in the light of day” 5
  6. 6. Risks/Rewards
  7. 7. IPD Contract Resources• AIA Contracts – Transitional Forms: A195, A295 and B195 – Multi-Party Agreements: C191 – The Single Purpose Entity: C195, C196 and C197• ConsensusDOCS 300 Contracts – Supported by the AGC – “Relational” agreement example 7
  8. 8. Case Studies –Sutter Medical CentersMilestones Sacramento (Traditional) Castro Valley (Lean/IPD)Total project duration: 12 5OSHPD Permit for 24 6Foundation/Structure:OSHPD Permit for TI: 36 6RFI’s: 640 51Change Orders: 159 12OSHPD Post Approval 181 19Docs: 8