Facility Installation – FiberJames T. Burroughs<br />
Linear Construction Project<br />Crosses all imaginable types of property ownership and triggers all conceivable land use ...
Project Description<br />Trench<br />Plow<br />Rock cutting <br />Bridge attach<br />Usually not aerial (for security and ...
Right-of-way issues<br />
Typical Project Team <br />Engineers<br />ROW agents<br />Environmental consultants<br />Lawyers<br />
Permitting Agencies-Depends<br />County/City CUP<br />Water crossings<br />Listed species<br />State-owned land<br />Feder...
CEQA Compliance<br />Lead agency <br />“Binding" on responsible agencies for MND's and EIRs<br />Typical Issues<br />Typic...
Permitting Timeline<br />Depending on the length and complexity of the project:<br />45-60 days with a CatEx<br />6-12 mon...
Litigation<br />Relatively rare<br />Challenge to control costs and deliver the fiber product on a timely basis<br />
Upcoming SlideShare
Loading in …5
×

Everything you need to know about broadband towers and land use issues

629
-1

Published on

Published in: Education, Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
629
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Everything you need to know about broadband towers and land use issues

  1. 1. Facility Installation – FiberJames T. Burroughs<br />
  2. 2. Linear Construction Project<br />Crosses all imaginable types of property ownership and triggers all conceivable land use permitting issues<br />
  3. 3. Project Description<br />Trench<br />Plow<br />Rock cutting <br />Bridge attach<br />Usually not aerial (for security and facility protection purposes)<br />Signal regeneration stations <br />Marker posts (aesthetic issue sometimes)<br />
  4. 4. Right-of-way issues<br />
  5. 5. Typical Project Team <br />Engineers<br />ROW agents<br />Environmental consultants<br />Lawyers<br />
  6. 6. Permitting Agencies-Depends<br />County/City CUP<br />Water crossings<br />Listed species<br />State-owned land<br />Federally-owned land<br />Coastal Commission<br />Flood control districts and their conveyance facilities<br />Usually notAQMD<br />
  7. 7. CEQA Compliance<br />Lead agency <br />“Binding" on responsible agencies for MND's and EIRs<br />Typical Issues<br />Typical mitigation<br />
  8. 8. Permitting Timeline<br />Depending on the length and complexity of the project:<br />45-60 days with a CatEx<br />6-12 months with a MND<br />12-24 months with EIR<br />
  9. 9. Litigation<br />Relatively rare<br />Challenge to control costs and deliver the fiber product on a timely basis<br />

×